Wasim Haider

Wasim Haider

Followers of Wasim Haider409 followers
location of Wasim HaiderAhmedabad, Gujarat, India

Connect with Wasim Haider to Send Message

Connect

Connect with Wasim Haider to Send Message

Connect
  • Timeline

  • Skills

    Epc
    Inspection
    Piping
  • About me

    Piping-Erection, Fabrication, Mechanical Clearance, Testing, precommissioning

  • Education

    • Visvesvaraya Technological University

      2003 - 2007
      Bachelor of Engineering (BE) Mechanical Engineering
  • Experience

    • Gannon Dunkerley & Co., LTD.

      Jul 2007 - Sept 2009

      Project : J2 -Jamnagar export refinery project (JERP) Plant : PFS-5, Mega PP, ETP Client : Reliance Industries Ltd. Job Role : GET/ Piping Engineer Significant Highlights:  Completed Spool Fabrication for the upcoming new refinery project as per drawing from BECHTEL, FRANCE. Fabricated pipe spool as per ASME CODE: - B31.1 & B31.3 from ¾” dia to 32” dia of CS, LTCS, AS, and SS from schedule 40 to XXS pipe.  Supervision of Hydro Testing and internal cleaning with National Protection Company (N.P.C) & Nitrogen Purging of piping class 1.  Responsible for Pipe Erection, Mechanical Clearance, Testing and Box-up of ETP Plant (OSBL & ISBL)  Responsible for Daily Progress Report and forward to Planning Department.  Prepare next day planning for Fabrication and Erection work.  Responsibilities To certifying contractor bill and raised Client bill.  Preparation of Material Consumption sheet and Reconciliation sheet after completion of job. Show less Project : J2 -Jamnagar export refinery project (JERP) Plant : PFS-5, Mega PP, ETP Client : Reliance Industries Ltd. Job Role : GET/ Piping Engineer Significant Highlights:  Completed Spool Fabrication for the upcoming new refinery project as per drawing from BECHTEL, FRANCE. Fabricated pipe spool as per ASME CODE: - B31.1 & B31.3 from ¾” dia to 32” dia of CS, LTCS, AS, and SS from schedule 40 to XXS pipe.  Supervision of Hydro Testing and internal cleaning with National Protection Company (N.P.C) & Nitrogen Purging of piping class 1.  Responsible for Pipe Erection, Mechanical Clearance, Testing and Box-up of ETP Plant (OSBL & ISBL)  Responsible for Daily Progress Report and forward to Planning Department.  Prepare next day planning for Fabrication and Erection work.  Responsibilities To certifying contractor bill and raised Client bill.  Preparation of Material Consumption sheet and Reconciliation sheet after completion of job. Show less

      • Piping Engineer

        Jul 2007 - Sept 2009
      • Piping Engineer

        Jul 2007 - Sept 2009
    • DAT Engineering Enterprises

      Oct 2009 - Dec 2010
      Piping Engineer

      DAT ENGINEERING ENTERPRISES (Oct 2009 – Dec 2010) 2.0 M/S LARSEN & TOUBRO LIMITED Project: LOBS Quality Up gradation Project Unit : Compressor and Heater Area Client : HPCL-Mumbai Job Role : Piping Engineer Significant Highlights:  System / sub-System marked up on Latest Revision of P&IDs of Process and Utility Piping.  Preparation of Test Pack File (560 nos), Dummy File making for site work.  Tracking of Loop File Movement in each Department.  Responsible for Punch Points liquidation,  As-Built Drawing as per site modification, Site Engineering Request, Co-ordination with Engineering Team. 1.0 M/S IOT Engineering Projects Ltd. (IOTEP) Project : Project Super MAX Unit : NCAU, NCU Client : HPCL-Mumbai Job Role : Piping Engineer Significant Highlights:  Completed Mechanical Clearance, hydro testing, Cardboard Blasting and Box-up of all Piping Loops in pre￾shutdown.  Successfully completed all Tie-In job in Shutdown within the time schedule of NCAU and NCU Unit.  Responsible for dismantling job of old existing valves and spools and Erection of new valves and spools.  Responsible for Pre-commissioning activity and hand over to Operation department. Show less

    • Artson Engineering Limited

      Mar 2011 - Mar 2013
      Piping Engineer

      1.0 Project : Rajasthan Northern Development Project Client : Cairn Energy Pty Ltd Job Role: Lead Engineer Mechanical) Plant: Well pads Significant Highlights:  Executed all Piping jobs like Fabrication, Erection, Isometric Clearance, Mechanical Clearance, Testing, System Clearance, and Box-up for Well Pad-: WP15, WP02, WP14 and WP04.  Executed of Pipe Supporting, Light Structure like Cross Over, Manifold Structure, and Mechanical Pipe Support.  Installation of equipment like Compressor container Skid, PIG Launcher/Receiver along with J.B Crain, Water Injection Fine Filter, Lube Oil System, Pipe Spool Skid, Chemical Injection Skid, Well Manifold Skid  Executed all Hook-up with Pipe Line of well Pad Piping.  Involved in Documentation work during Startup phase line Method of Statement, JSA, Test Pack Formats, Spool Marking, and Field Joints Marking.  Completed All Tracing Jobs (EHT) and Hot Insulation Works of Well Pad Piping and Equipment.  Completed successfully all Mechanical work of WP15, WP02, WP14 and WP04 and Handed Over to Commissioning Team.  Involved in Consumption Sheet Preparation of Piping/ Equipment/EHT/Insulation Materials, And Material Reconciliation with CEIL Project team.  Involved in Painting, Blasting and Stenciling works. 2.0 Project : ONGC PETRO ADDITIONS LIMITED (OPAL) Client : Cairn Energy Pty Limited Job Role : Lead Engineer Mechanical) Plant: Well pads  Involved in Fabrication of Structure and Piping Spools for Tank Farm and OSBL Pipe Rack Area.  Material Co-ordination, Site Planning and Work Front Management for site erection Job.  Material Reconciliation sheet and Billing preparation and raised to client on monthly basis. Show less

    • Reliance Industries Limited

      Mar 2013 - Jun 2019
      Construction Engineer

      PROJECT ACCOMPLISHED 5.0 COKE DRUM REPLACEMENT PROJECT AND SHUTDOWN: (Completed in 17.28 days)4.0 DELAYED COKER REVAMP: (TURNAOUND/SHUTDOWN) (Plant: Delayed Coker)3.0 J3-SEZ-PET COKE GASIFICATION PROJECT: (Plant: Sour Waster Stripper SWS Unit)2.0 J3- DTA-PET COKE GASIFICATION PROJECT: (Plant: SULPHUR I&II Trains 1000TPD each) 1.0 J3- DTA-PET COKE GASIFICATION PROJECT: (Plant: OSBL & Interconnection Pipe Rack)

    • Honeywell

      Aug 2019 - Jun 2020
      Project Engineer

       Successfully completed the fabrication and Erection work of Talara Refinery Modernization_ Peru Modular Project (Kerosene Treating unit (8800BPSD), Assembly work of Modular carried out at Abu Dhabi (Fabricator￾Global Process Systems)  Completed the Assembly work of Pressure Swing Absorption (PSA)- SMR & ROG Skid for HPCL Visag Project (PMC-EIL).  Responsible for overall execution, Expediting, Fabrication and assembly work of PSA and Modular Project including Final Checkout and Transportation.  Established and maintained the field progress and inspection tracking systems. Show less

    • UPL

      Oct 2020 - Dec 2022
      Project Engineer

      PROJECT ACCOMPLISHED  Successfully completed the Construction of 350KLD MEE plant at Unit-01. (Fab & Erection of Steel Structure -350MT, Equipment- 105 Nos, Piping Fab & Erection-15K IM.)  Completed the Erection of 20nos Transfer Pump along with piping at Existing ETP Plant.  Completed Erection and Commissioning work of Fire water System for New Unit. (IKI-220 & MEE)  Methanol Distillation System installation and commissioning. Job carried out in running plant. (MEOH Distillation Column, Re-boiler, Primary and secondary condenser, collection Tank and Transfer Pump.  Successfully completed all mechanical work of 3 Nos Toluene Recovery system in SE-367 in running Plant. (MSGL Reactor, Primary & Secondary Condenser, Ejector System, Tank, Transferring Pumps along with Piping and structural Job)  Completed New Bay Extension construction work. (Structure, Piping and Equipment) System: SE-367 Neutralisation, Ejector System and DCPT Purification. Show less

    • Adani Enterprises Limited

      Dec 2022 - now
      Associate Manager
  • Licenses & Certifications

    • SAP MM - Material Management Full Course

      Udemy
      Apr 2023
    • Learning SAP MM (Materials Management)

      LinkedIn
      Dec 2021
      View certificate certificate
    • Construction Management: Planning and Scheduling

      LinkedIn
      Dec 2021
      View certificate certificate