SARFRAZ HUSSAIN

SARFRAZ HUSSAIN

Instrumentation & Control Trainee Engineer

Followers of SARFRAZ HUSSAIN287 followers
location of SARFRAZ HUSSAINMalaysia

Connect with SARFRAZ HUSSAIN to Send Message

Connect

Connect with SARFRAZ HUSSAIN to Send Message

Connect
  • Timeline

  • About me

    Electrical Engineer at Power Plant - Nagina Group

  • Education

    • Govt. Degree College Mirpur Mathelo, District

      -
      Pre Engineering
    • Universiti Teknologi Petronas

      2008 - 2013
      Bachelor’s Degree Electrical and Electronics Engineering
  • Experience

    • Fauji Fertilizer Company Limited

      Oct 2011 - Apr 2012
      Instrumentation & Control Trainee Engineer

      Industrial Internship at FAUJI FERTILIZER COMPANY Ltd. Pakistan - (29 weeks)Project : Water treatment plant controls Up-gradation from conventional system to Yokogawa DCS Involvement and contribution towards the accomplishment of DCS (Yokogawa CENTUM CS 3000 ) project Preparation of BOM after Input Output Counting Material Ordering & Procurement of Yokogawa hardware, Marshalling hardware and HMI / Engineering Stations Development of Pre-commissioning philosophy, Layout designs of control room, DCS & Marshalling Preparation of Logic drawings Detailed engineering drawings for Marshalling Fabrication, Testing and Installation of Marshalling cabinets DCS graphics designing and dynamic linking DCS cabinet installation and Testing at plant site Configuration and Integration of system, Functional testing of loops and Logic implementation Final commissioning of DCS project by testing of loops requiring shutdown Show less

    • Hyundai Engineering Co. Ltd.

      Aug 2015 - Sept 2016
      E&I Engineer

      Worked as an E & I Engineer, on the ( Project called "ATOM" ) ARL Up-gradation Project @ Attock Refinery Limited, Rawalpindi..EPCC (Engineering, Procurement, Construction and Commissioning) Contract for Refinery Up-Gradation.The Up-gradation comprises of 3 Projects that includes:(i) Preflash Unit that would add 25% (or 10,400bpd) to company’s refinery capacity,(ii) Naphtha Isomerization unit (NIU) that would increase the yield of high margin petrol by 75% (or 20,000 tons).(iii) DHSD that aims to improve diesel production to Euro II compliant.. The up-gradation also entitles enhancement of Captive Power Plant Capacity by 18MW to cater for addition energy requirement of the plant.Roles & Responsibilities:-- Instruments' Calibration, Installation, & Loop testing-- Selection & Installation of Junction box-- Work on Cable tray, Cable pulling & Termination-- Work on Control Panels-- Vendor Packages : Steam Boilers, Reciprocating Compressors, Field Heaters, R.O Plant, Reactors, etc.-- Also make Daily progress report, BOQ, BOM, and other Document's work related to Planning & Reporting. Show less

    • Nagina Group

      Jun 2017 - Jul 2019
      Electrical Engineer

       Power Plant comprises of several Gensets (GE Jenbacher 620, Niigata 6L34HX, 2 × CAT-3520C, CAT-3520B, CAT-3516A) Full fledge Incharge of the Electrical dept. & its all related issues. Responsible for Operation, Maintenance & Management of Power Plant & Utility systems  Responsible for the innovation, up-gradation & extension to improve plant efficiency Planning & Executing the Preventive & Corrective Maintenance of CATERPILAR/ GE JENBACHER Gensets Perform troubleshooting & diagnose the root cause of encountered problems  Preparation of Staff developmental programs/trainings & Handling the issues of Staff Show less

  • Licenses & Certifications

    • Certified Registered Engineer

      Pakistan Engineering Council (PEC)
  • Honors & Awards

    • Awarded to SARFRAZ HUSSAIN
      Awarded Full Scholarship by PETRONAS to study in "Universiti Teknologi PETRONAS" Malaysia. -
    • Awarded to SARFRAZ HUSSAIN
      SILVER Medal in " Engineering Design Exhibition " UNIVERSITI TEKNOLOGI PETRONAS Created a prototype of "Car Alarm system & immobilizer" to prevent 99% theft occurrence..