Hlahla Mapimele

Hlahla mapimele

bookmark on deepenrich
location of Hlahla MapimeleCity of Johannesburg, Gauteng, South Africa
Phone number of Hlahla Mapimele+91 xxxx xxxxx
Followers of Hlahla Mapimele134 followers
  • Timeline

    Current Company
    Dec 2010 - now

    Engineering Assistant Lines & Servitude (NTCSA)

    Eskom Holdings SOC Ltd
    South Africa
  • About me

    Engineering Assistant Eskom Holdings SOC Ltd NTCSA

  • Education

    • Tshwane south fet college

      2009 - 2013
      Higher national diploma national diploma (electrical engineering field)

      Tertiary Education 1Institution Capricorn FET College Year Obtained 2007Qualification National Certificate(Electrical Engineering),N1 –N4Subjects Industrial Electronics N1-N4Engineering Science N1-N4Mathematics N1-N4Electrical Trade Theory N1-N2Electro-Technology N3Electro-Techniques N4 Tertiary Education 2Institution Tshwane South FET CollegeYear Obtained 2009Qualification National certificate (Electrical Engineering)… Show more Tertiary Education 1Institution Capricorn FET College Year Obtained 2007Qualification National Certificate(Electrical Engineering),N1 –N4Subjects Industrial Electronics N1-N4Engineering Science N1-N4Mathematics N1-N4Electrical Trade Theory N1-N2Electro-Technology N3Electro-Techniques N4 Tertiary Education 2Institution Tshwane South FET CollegeYear Obtained 2009Qualification National certificate (Electrical Engineering), N5-N6Subjects Industrial Electronics N5-N6Power machines N5-N6Mathematics N5-N6Electro-Techniques N5-N6 GraduatedInstitution Tshwane South FET CollegeYear Graduate 2013Qualification National Diploma (Electrical Engineering Field) Artisan Institution Artisan Training InstituteQualification Trade Test (Qualified Electrician)Year Obtained 2016Qualification. wireman’s license Year Obtained 2017 Show less

  • Experience

    • Eskom holdings soc ltd

      Dec 2010 - now

      1.Line Inspection & Maintenance -Conduct Visual Line Inspections and recording of Mechanical conditions of Equipment. -Aerial inspection 2.Servitude Maintenance -Identify critical areas in terms of vegetation growth and recommend corrective action. 3.Line Maintenance -Replace & Repair conductor elements E.g Compression joints,jumpers,spacer and dampers -Replacement of Insulators on Transmission Lines -Application of working Earth-Open,Isolate,safety test and earth of the power Lines -Working under voltage from 275KV to 400kV -Tower member repairs-Installing Bird guard, bird diverters and removing bird nest 4.Fault Finding Line fault investigation Show less  INSTALLATION OF STAYS,* Identify different types of stays.* Identify different components and material needed to install a backstay.* Install and tension a backstay, using the correct material and equipment. POLE PLANTING* plant and secure wooden poles of different Lengths and on different terrain (even and uneven).* Planting a pole: manually by hand or with a crane Earthing of installations* To prevent or reduce the risk of electrical shock to people or animals.* To reduce the risk of fire and to safeguard apparatus. Ladder Safety *Select, use, maintain, inspect and transport ladders HV/LV cable connections and clamping/crimping* perform crimping and clamping connections on aerial bundle conductors, Connection of a surge arrestor *install and connect HV and LV surge arrestors  Fault finding and change out of meters* To ensure customer satisfaction* To reduce revenue loss by replacing meters going into the Free Supply mode. Equipotential earthing*Understand and identify the hazards associated with earthing that can exist on substation equipment and overhead lines and why it is necessary to create an equipotential zone.* Correctly apply portable earthing gear in such a way to create an EQUIPOTENTIAL zone within which work can be safely carried out. Jointing and Terminating of Conductors* Ensure that preparation is correct.* Proceed with jointing and or dead ending, under normal conditions. Distribution Operating 0kV to 132kV*Do switching, linking, safety testing and earthing under fault and normal conditions.*To ensure safety of personnel and apparatus, and the continuity of supply. Low voltage barricading* barricading correctly and safely after apparatus has been made safe. Phasing 110V-132KV*Do phasing on all systems 110volt up to 132 kilo volt, to ensure that the networks are in phase and customers appliances, will not be affected by wrong phasing. Show less

      • Engineering Assistant Lines & Servitude (NTCSA)

        Feb 2025 - now
      • Artisan Electrical Lines&Servitude(Transmisson)

        Apr 2023 - Feb 2025
      • Senior Officials Lines&Servitude(Transmisson)

        Mar 2022 - Jul 2023
      • Technical Official Field Service (Distribution)

        Dec 2010 - Mar 2022
  • Licenses & Certifications

    • Installation electrician

      Department employment and labour
      Mar 2020