Adel Singab

Adel Singab

Mechanical maintenance Engineer

Followers of Adel Singab886 followers
location of Adel Singabمكة رابغ السعودية

Connect with Adel Singab to Send Message

Connect

Connect with Adel Singab to Send Message

Connect
  • Timeline

  • About me

    Mechanical Commissioning Manager at ELSEWEDY POWER

  • Education

    • Mansoura University

      1996 - 2000
      Bachelor of Engineering (BS) Mechanical Engineering Good
  • Experience

    • Aqua treat for water treatment

      Nov 2001 - Aug 2002
      Mechanical maintenance Engineer

      Working for Aqua Treat for Water Treatment as mechanical maintenance engineer doing periodic and preventive maintenance for all equipments at New-Damietta water treatment station (1000 lit/sec) including: Raw and Clean water pumps. Water ring vacuum pumps. Aluminium sulphate pumps (reciprocating pumps). Chlorine ejectors. Back wash centrifugal pumps and air blowers. Main water reservoirs and clarifiers.

    • Middle Delta for Electricity Production Co.

      Aug 2002 - Jun 2010

      Working as Mechanical maintenance engineer, where I am responsible for performing maintenance of steam power plant machinery (steam turbine and its auxiliaries). Following are some of the major tasks that I am performing as a maintenance officer:• Troubleshooting & day-to-day problems of power plant machinery including: High, intermediate and low pressure steam turbines. First and Second stage condensate pumps. Feed water pumps (electric motor driver). Main Cooling pumps (axial pumps). All static equipments : Shell and tube heat exchangers (steam condenser, lubrication oil coolers, secondary demi water coolers). All types of valves (gate, glope, butter-fly). Steam traps.• Preparation & implementation of Preventive Maintenance schedules for smooth & efficient operation of plant machinery• To maintain and improve efficiency of the Plant by a timely and consistently planning/scheduling to avoid any unforeseen breakdown of Plant Equipment and keep the Plant running in a safe manner. Show less worked as Shift Charge Engineer doing the following:• I was Responsible for proper operation and monitoring of the boiler, turbine and their facilities related to the plant, Carry out startup, shutdown, routine and emergency operation of the plant as required. Maintain log of all operation activities.• Responsible for issuing of job work orders and to record equipment history over CMMS system• To compile various reports: daily performance calculations, unit trip analysis.• Liaison with other departments in related activities Show less Worked as Boiler operator (control room operator).Operating the boiler properly regarding:• Outlet steam properties and inlet feed water properties (temperature, pressure, PH No, conductivity and percentage of silika).• Inlet air and outlet flue gases properties (temperature, pressure, excess air percent and (CO, CO2 , O2) percent .• Keep the previous parameters at the optimum operating values August 2002 to June 2003Worked as Boiler operator (out door operator)• Observe operating conditions of all boiler equipments such as:feed water pumps, air fans, recirculating flue gases fans, ljungstroms, burners and HP ,LP mazout pumps.• Inform shift supervisor with any field troubles or break downs.• Isolate any equipment manually as required in work orders to hand over to maintenance.• De-isolate the equipment, test operation to take over after finishing maintenance.Boiler description:• This boiler generates steam at flow rate 670 ton/hr , pressure 165 bar and temperature 535 °C, natural gas is the main fuel used and mazout is stand by. Show less

      • Mechanical Maintenance Engineer

        Jun 2008 - Jun 2010
      • Shift Charge Engineer

        Apr 2007 - May 2008
      • Boiler Operator (CCR & Field Engineer)

        Aug 2002 - Mar 2007
    • Iberdrola

      Jul 2010 - Apr 2011
      Operation and Start up Engineer

      working for [IBERDROLA Engineering and Construction] at the state of art plant in the field of Renewable Energy Kuraymat Integrated Solar Combined Cycle 140 MW Doing the following:- Commissioning of all BoP equipments till first start.- First start and trial operation of 70 MW GE gas turbine frame 6 (Mark 6).- HRSG steam blow till first start on by passes operation. - First Start and trial operation of SIEMENS steam turbine (70 MW).- Kettle Boilers (oil H.Ex) blow out.- Solar field integration with the combined Cycle for trial operation.- Performance tests on variable loads (day mode and night mode). Keep the plant running in safe manner during reliability time till turning over to the owner. Show less

    • Kharafi National

      May 2011 - Dec 2011
      Project engineer

      working for Kharafi National at El Shabab Simple Cycle plant 1000 MW (8 units × 125 MW), Type: GE gas turbine Frame 9E.Doing mechanical commissioning works of the gas turbine and its auxiliaries :- Closed cooling water system- Lube oil system.- Gas fuel system.- Liquid fuel system.- Atomizing air system- Air processing unit.- Cooling and sealing air sys.- Co2 system- Evaporative cooler.- Carry out operation works during performance and reliability tests from (PEECC).- Familiar with Mark6e.Carry out commissioning and testing works of RO and Demi water plant. Show less

    • Power System Projects, Elsewedy

      Jan 2012 - Apr 2013
      Commissioning and start up Engineer

      working for PSP (Power Systems Projects) CP-118 contractor at Abu Qir steam power plants unit 6,7 (650 MW) , doing first start up and comissioning tests for all auxiliary equipments of the plant :- Feed water pumps (turbine pumps).- Circulating pumps. – service pumps.- Condensate pumps. – air compressors.- Closed cooling sys. – fire fighting sys.

    • Hitachi Limited

      May 2013 - Mar 2015
      Mechanical Commissioning Engineer

      • Doing comissioning tests & start up for all auxiliary equipments and systems of the plant .• Make sure all the technical documents necessary for commissioning of different units are available with commissioning team.• Be aware of commissioning schedule of the site and accordingly divide the work through comm. team and allocate needed resources such as manpower and tools.• Make sure that all necessary tools and equipment for comm. are available with the team and calibration is already performed.• Make sure all systems are completed before taking over by comm. team and following up to remove the remaining open items through punch lists by installation team.• Commissioning check lists are to be completed and the critical records highlighted.• Receiving the systems from QC (Quality Control) and Construction, then commissioning of mechanical systems, including: closed cooling water, service water, circulating water, fire fighting, solar fuel, compressed air, condensate water and feed water systems. This requires thorough understanding and exercising of ultimate industrial safety practices.• Hand over of the commissioned systems with the integrated rules.• Good knowledge of interfaces between different units by which will provide a correct sequence of commissioning activities.• Close connection with Health and Safety Executive (HSE) unit to make everybody aware of likely danger potentials of commissioning activities.• Plan all individual units and overall plant are handed over to client after completion of commissioning, the respective operation manuals and documents handed over and necessary training courses are held for client operation team enabling them to run the plant.• Supervise all acceptance tests of units. Show less

    • ELSEWEDY ELECTRIC POWER SYSTEMS PROJECTS

      Apr 2015 - Aug 2021
      • Commissioning Manager

        Dec 2019 - Aug 2021
      • Lead Mechanical Commissioning Engineer

        Jun 2016 - Nov 2019
      • Lead Mechanical Commissioning Engineer

        Apr 2015 - May 2016
    • ElsewedyPower

      Sept 2021 - now
      Mechanical Commissioning Manager

      Planning and Coordination:Develop a comprehensive commissioning plan for mechanical systems, outlining the sequence of activities, resource allocation, and timelines.Coordinate with other departments, contractors, and stakeholders to ensure a smooth commissioning process.Inspection and Testing:Supervise the inspection of mechanical equipment and systems to verify compliance with design specifications and regulatory requirements.Oversee functional testing of mechanical components, such as pumps, turbines, Fuel gas system, valves, cooling systems, and other machinery.Start-up Procedures:Collaborate with operations and engineering teams to develop and implement start-up procedures for BOP systems and Gas turbine systems.Safety and Quality Assurance:Implement and enforce safety protocols and procedures to protect personnel, equipment, and the environment during commissioning activitiesMonitor quality control measures to ensure that all mechanical systems meet industry standards and design specificationsTrouble ShootingIdentify and address any issues, discrepancies, or deficiencies during the commissioning process.Work closely with engineering teams to resolve technical challenges and ensure the proper functioning of mechanical systems.Documentation: Maintain detailed records of commissioning activities, including test results, inspectionsPreparing the Turn over packages of Commissioned systems.Generate regular progress reports for managementTraining and Coaching to operations and maintenance staff Commissioning Procedures preparations and ReviewFollow up the contract specification of the client (DEWA)Vendor and Contractor Management:Liaise with equipment vendors and contractors to ensure timely delivery, installation, and testing of mechanical equipment.Performance Monitoring:Monitor the performance of mechanical systems during the initial operational periodHandover to Operations:handover of commissioned mechanical systems to the operations team Show less

  • Licenses & Certifications