Filipa Esteves

Filipa Esteves

Group Project – Evaluated the maturity of Thin Clients for CAD users

Followers of Filipa Esteves981 followers
location of Filipa EstevesPortugal

Connect with Filipa Esteves to Send Message

Connect

Connect with Filipa Esteves to Send Message

Connect
  • Timeline

  • About me

    Project Manager

  • Education

    • Universidade do Minho

      2009 - 2014
      Mestrado em Engenharia Engineering/Industrial Management 15
    • Cranfield University

      2013 - 2014
      Master's degree Engineering and management of manufacturing systems
  • Experience

    • Airbus Group

      Mar 2014 - Apr 2014
      Group Project – Evaluated the maturity of Thin Clients for CAD users

      •Create a cost benefit analysis tool in order to assess the investment of Thin Client Architecture in Airbus•Delivered a Business case containing a feasibility study on evaluating, developing and implementing Thin Client Architecture focusing on Return on Investment and Total Cost of Ownership.

    • Coca-Cola European Partners

      May 2014 - Jul 2016

      • Lead a team of 15 employees and responsible for 7 production lines (5 capri-sun lines, 2 Bg-in-box)• On a daily routine ensure on-line quality checks are carried out in accordance with quality test standards to ensure product specification is met at all times and do every four hours with the engineers a short interval control routine in order to optimise line performance and production cost• Developed an individual development plan for each employee of the team in order to ensure people capability to flex people resource across lines and functions to meet fluctuations in demand• Participated in a production plan change of one line that save 20000 litres of water per year and decreased 3 hours of changeover per week. Show less • Aim of the project was to identify engineering opportunities to reduce this loss without impacting the overall performance.• Conducted a process mapping showing all the areas of waste• Conducted a mass balance in all the lines and analysed the data using 3 different techniques: Pareto analysis, Fish bones diagram and 5 whys.• Recommendations were presented at low cost resulting in a short payback period and significant cost savings and the overall loss reduced 0.20% in average on each line. Show less

      • Operations Team Leader

        Oct 2014 - Jul 2016
      • Supply chain Internship - Reduce packaging material loss in Capri-Sun production

        May 2014 - Sept 2014
    • Bosch Car Multimedia Portugal, S.A.

      Sept 2016 - Feb 2018
      Logistics Quality Project Manager
    • Philip Morris International

      Feb 2018 - Jun 2019
      Operations Training Specialist EU
    • HUUB

      Nov 2019 - Jan 2020
      Flow manager
    • Vestas

      Jan 2020 - now
      • Lead Project Product Manager

        Sept 2023 - now
      • Software Project Manager

        Jan 2020 - Sept 2023
  • Licenses & Certifications

    • Prince2 - Foundation Certificate in Project Management

      AXELOS Global Best Practice
      Jan 2021