
Oner ICMELI
Project Design Engineer

Connect with Oner ICMELI to Send Message
Connect
Connect with Oner ICMELI to Send Message
ConnectTimeline
About me
MEP Senior Manager - Construction
Education

Huseyin Avni Sozen Anadolu Lisesi
1990 - 1996
Anadolu University
2014 - 2021Bachelor's degree Business Administration - BBA
Yıldız Teknik Üniversitesi / Yildiz Technical University
1997 - 2001Bachelor's degree Electrical Engineering
Experience

Siteco Beleuchtungstechnik GmbH
Apr 2000 - Jun 2002Project Design EngineerAs a Lighting Design Engineer, I specialize in creating lighting solutions for indoor & outdoor spaces. And I designed lighting systems for various environments, including special locations such as stadiums and tunnels.

Doğuş Holding
Dec 2002 - Jun 2004Electrical Site EngineerProcter & Gamble Gebze Detergent Plant ProjectAs the Electrical Site Engineer in P&G detergent plant construction with 13,000 square meters closed area in GOSB, I was responsible for inspecting all electrical systems work executed by subcontractors responsible for MV, LV and ELV systems and coordinated them with other disciplines.

Net Mühendislik Elektrik San. ve Tic. A.Ş
Jul 2004 - Apr 2005Electrical Site ChiefThis project consisted of moving the client's existing office to a new office complex. As the Electrical Site Chief, I managed the design team's initial period for preparing electrical shop drawings accordingly to client requests in the client's office. I got approval for initial quality documents, such as material approval and method statements. After that period, I managed all electrical installations at The Head Office of Merck Sharp & Dohme Medicals, consisting of 3 blocks on a closed area of 16.000 square meters, bearing intelligent buildings. Show less

Bordo Mühendislik San. ve Tic. Ltd. Şti.
May 2006 - Aug 2011Electrical Construction ManagerAs the Electrical Construction Manager, I managed the execution works of MV & LV distribution system, Train Catenary Feeder System, Scada & Environment Control System (ECS), Normal&Emergency Lighting, Small Power, Fire Alarm, CCTV, PAVA, Tunnel Emergency Telephone System in below railway projects. Kadikoy-Kartal Metro Project - Astaldi-Makyol-Gulermak JV, June 2010 / October 2011 * Tunnel Electrical Installation Works (Total 42km length) * Kartal - Soganlik - Hastane - Kozyatagi Stations Electrical Installation WorksIstanbul III.Phase Metro Project - Alarko-Makyol JV, July 2008 / May 2010 * Tunnel Electrical Installation Works between Darussafaka and Haciosman Stations * 5MVA 6.3/34,5kV Generator Building Electrical Installation Works at Ataturk Oto Sanayi Station * Seyrantepe Station, Storage and Workshops Area and Connecting Tunnels Electrical Installation Works * Sanayi Station and Tunnels between 4.Levent, Sanayi, and ITU stations Electrical Installation WorksAs the Electrical Construction Manager, I executed all electrical installation works for the below miscellaneous projects.Other projects * Suryapi-Akel-Yetis Kavacik Office Building, June 2008 / December 2008 * Suryapi Onur Ofis Park Office Building, October 2007 / May 2008 * The Head Office of Sony Eurosia, January 2008 / April 2008 * The Head Office of Deutsche Bank, January 2007 / March 2007 * Suryapi Dorapark Apartments, May 2006 / August 2008 Show less

Anel Group
Feb 2012 - Jun 2020Abu Dhabi Airport Midfield Terminal Building ProjectI was responsible for managing all electrical works during the energizing and closing phase of the airport project, which has an internal area of 700,000 square meters. During my responsibility, I ensured that the electrical panel of all MV and LV systems was inspected and certified by the local authority ADDC distribution company, completed until the last load according to the relevant local and international regulations and the T&C protocols of the appropriate systems were executed.I also conducted the closing periods of installation snags and T&C snags inspected by PMCM for all MV-LV electrical distribution systems and ELV systems such as Fire-Alarm Detection, Public Address & Voice Alarm Systems (PAVA), Lighting Control Systems (LCS). Show less Dubai-I Terminal Building ProjectAs the Deputy MEP Project Manager in the terminal building works of the unique project, described as the world's giant observation wheel, my primary duties were to prepare the project schedule, to carry out the control and follow-up according to schedule, and to report monthly and weekly basis to the customer management. Additionally, I managed the selection of appropriate materials and the preparation of shop drawings, considering the purchasing advantages and client's requirements. Besides that, according to the Quality Management plan, I managed the preparation of Quality documents such as method statements, inspection test plans, and material inspection reports. Show less Qatar Integrated Railway Project - Red Line South UndergroundAs the MEP Coordination Manager within the Qatar Metro Project Red Line South Underground package, I coordinated activities between the design and construction teams. The project encompassed the construction of 5 underground stations and a double tunnel total length of 35 km. My primary focus was to address and resolve any conflicts or coordination issues that arose on-site. This involved effectively communicating and collaborating with both the design and construction groups. I facilitated sharing of coordinated shop drawings, ensuring the teams had access to the most up-to-date information. Additionally, I closely monitored the execution of construction activities, ensuring compliance with the shop drawings and promptly addressing any deviations or discrepancies. Show less IS REIT Istanbul Tuzla Technology and Operation Center ProjectI was the Electrical Project Manager for a significant project undertaken by Is Bankasi, one of Turkey's prominent banks. This project encompassed a vast area of 270,000 square meters and comprised various essential facilities. The complex included operation offices, a data center, a kitchen section capable of serving 5000 individuals, a spacious conference hall, an education center building, an accommodation facility, health units, a children's nursery, a convenient shopping center, and an expansive indoor parking lot. I oversaw and completed all electrical works throughout the project lifecycle. This involved managing the design, procurement, installation, and testing of electrical equipment and infrastructure. Additionally, I ensured compliance with all safety regulations, quality standards, and project timelines. I successfully delivered a fully operational and functioning electrical system within the complex, contributing to the project's overall success. Show less MARMARAY (BC1) Bosphorus Crossing Metro ProjectAs the Site Manager for a significant project connecting the European and Asian continents of Istanbul through railway lines and a railway tunnel under the Bosphorus, I had the privilege of overseeing all MEP works within the tunnels. This ambitious project consisted of three underground stations, two above-ground stations, three ventilation buildings, two Gen-Set buildings, and a double 13.5 km tunnel totalling approximately 27 km of railway lines also featured two crossover areas.I managed a wide range of MEP works within the tunnels. This included overseeing all MV distribution grids, the Train Catenary Feeder System, Firefighting System, Tunnel Ventilation System (TVF), Linear Heat Detection Systems, Gas&Dust Monitoring Systems, Normal and Emergency Lighting, Small Power Distribution, Fire Alarm and Flame Detection Systems, Hydrochloride Detection System, Tunnel Emergency Telephone, Tunnel Drainage System, Foam Extinguishing Systems, and the installation of floodgates at the immersed tunnel entrances. I ensured the proper coordination and execution of these MEP works, ensuring compliance with project specifications, safety regulations, and quality standards. By effectively managing the various systems and installations, I contributed to the successful completion of the project, facilitating safe and efficient transportation between the two continents of Istanbul. Show less
Electrical Construction Manager
Nov 2018 - Jun 2020Deputy MEP Project Manager
Jan 2017 - Nov 2018MEP Coordination Manager
Mar 2016 - Jan 2017Electrical Project Manager
Feb 2014 - Mar 2016Site Manager
Feb 2012 - Feb 2014

TAV Construction
Oct 2020 - Jan 2024Hamad International Airport, Doha, Qatar Passenger Terminal Expansion – D&E Concourse Building & Early Works HIAEP-0065As the MEP Construction Manager, I oversee all MEP activities related to the development of the D Concourse as part of the Hamad International Airport expansion project. This extension project, which commenced in January 2022, aims to increase the airport's passenger capacity of D & E concourses, each one is approximately 65,000 square meters. In this role, I am responsible for managing and coordinating the MEP operations to ensure the successful completion of the project. Show less Hamad International Airport, Doha, QatarPassenger Terminal Expansion – Central Concourse Building & Early Works HIAEP-0013As the Electrical Construction Manager, I contributed to completing the Hamad International Airport Expansion Project. This project, completed before the Qatar World Cup 2022, encompassed 166,000 square meters. Notably, the project included a unique botanical garden within the facility, highlighting its distinctive features. I played a pivotal role in overseeing the implementation of all electrical works, ensuring compliance with specifications and standards. The project was powered by two substations, with a total installed capacity of 20 MVA. It featured 164 MEP rooms, encompassing various critical components such as MV rooms, Main LV Rooms, UPS rooms, SCR/DCR rooms, HVAC/CRAC rooms, Electrical Rooms, and SCV rooms. I successfully managed the project from its initiation in January 2020 to its operational launch in October 2022, leading the opening, planning, execution, monitoring, and control phases of the electrical works. Show less
MEP Construction Manager
Jan 2023 - Jan 2024Electrical Construction Manager
Oct 2020 - Jan 2023

Red Sea Global
Feb 2024 - nowSenior Construction Manager - MEP
Licenses & Certifications
- View certificate

Project Management Professional (PMP)®
Project Management InstituteDec 2020
Languages
- tüTürkçe
- i̇İngilizce
Recommendations

Ally mshana
Territory Sales Manager At Selcom Tanzania., Assistant researcher.Dar es-Salaam, Dar es Salaam, Tanzania
Helen le frois
Vice President, Development at JBWSNewton, New Jersey, United States
Heiko stahl
Transportation - Product - Designmeister bei Stahl DesignstudioBiel, Berne, Switzerland
Akindele oluwatoyin oca.
Corporate Communications and Marketing Manager @ Allianz Nigeria | MBA, OCALagos, Lagos State, Nigeria
Ian hoser
Asset Management at Intercontinental Real Estate CorporationGreater Boston
Kim zvik
"Information Security Leader ""High-performance professional who delivers cyber security solutions to ..."San Francisco Bay Area
Roxi rivers whitley
Dialysis RNBoomer, North Carolina, United States
Mr ntsako mathembha ngoveni
AssessorCenturion, Gauteng, South Africa.webp)
Michelle dubord (schick)
Building strong and meaningful donor relationships. StrengthsFinder Top 5 Strengths: Input, Empathy,...Pewaukee, Wisconsin, United States
Aïcha adekambi
Program/Project Management LeadGreater Paris Metropolitan Region
Suzanne blundell
Strategic Housing Officer at Sefton CouncilGreater Liverpool Area
Carolyn baily
IT Manager Infrastructure at City of HaywardCity of Hayward
Tatiana marques
Actuarial Senior Manager | PwC PortugalLisboa, Lisbon, Portugal
Abdulaziz aljefri
HR ProfessionalUnited Arab Emirates
Lenaldo santos
Técnico MecânicoGuarulhos, São Paulo, Brazil
Lesley maeda
Project Director at Think FurnitureUnited Kingdom
Azra jakic
Operations ManagerAtlanta Metropolitan Area
Pablo muñoz
Co-founder and CEO at Evalore. Professor at several academic institutions. Lecturer.Barcelona, Cataluña, España
Ralph davis
Wood Shop / Yard ManagerMobile Metropolitan Area
Harikrishnan v s
Scientist-E CDACChennai, Tamil Nadu, India
...