Rodriguez Wigner

Rodriguez Wigner

Critical Systems Superintendent

Followers of Rodriguez Wigner826 followers
location of Rodriguez WignerCarolina, Carolina, Puerto Rico

Connect with Rodriguez Wigner to Send Message

Connect

Connect with Rodriguez Wigner to Send Message

Connect
  • Timeline

  • About me

    OP Mgr-Facilities Engineering at Sodexo

  • Education

    • RUM

      1980 - 1985
      Bachelor’s Degree Electrical Bachelor, Math minor(29 credits)

      Activities and Societies: IEEE, Phi Eta Mu

  • Experience

    • Baxter Healthcare

      Aug 1986 - Nov 1998
      Critical Systems Superintendent

      Critical Systems Superintendent – Managing Boiler Room Operators, Team Leaders, Mechanical Technicians, Project Technicians, and Project Electricians. Applied QC measures, along with precise documentation to safeguard distilled water systems. Responsible for personnel training and development in all areas related to Critical Systems Management (distilled water, compressed air & steam sterilization). Project Engineer – Defined, developed and established scope, goal, time frame and resources planning in close coordination with customer base. Responsible for training of customers, entry level management personnel on facilities familiarization and managed key aspects of the Competence Assurance Training for key factory personnel. Show less

    • Bard Shannon

      Nov 1998 - Nov 2012
      Facilities Manager/Supervisor

      Responsible for the development and analysis of engineering activities varying in scope and complexity, from time sensitive projects, to support day to day production operations. Supervised a staff of 12 technical employees, supported/managed regulatory audits (FDA, Corporate, ISO, Safety, etc.) in addition to CAPA, Qualifications, Internal Audits, Investigations and other maintenance/utilities/facilities quality documentation. Improved preventive maintenance programs following the implementation of the Maximo (CMMS) program, which allowed a reduction of equipment failures by 50%; implemented Kaizen practices to reduce documentation flow, improved task generation to completion activities and expedited work order closure. Additionally, implementing best practice principles which allowed for full utilization of new technologies geared to increased production ie. - Six Sigma Green Belt. Recognized as the Key contributor for the design, development and construction of Bard’s new manufacturing (Humacao, PR). Managed two facilities simultaneously (old & new); optimizing efficiencies. Project Specific Achievements included: Savings of $350k in energy efficiency projects; improved production efficiencies by reducing scrap materials by $250k; Implementation of storage tank, 2,000 KVA emergency generator, to ensure uninterrupted operations during “force majeure” events; Developed Recurrent Energy Conservation Strategies, provided recurrent savings of over 300K per year, in the areas of water recovery, lighting control, VFD systems installation and building management system tuning. Show less

    • CI ENGINEERING SERVICE

      Feb 2013 - Jul 2013
      Professional Engineer – President

      Provided engineering services in various disciplines ranging from design, construction management and manufacturing to facilities improvements, and implementation of inspections to maintain strong results. Project included the Oversight, Inspection and Certification of multiple projects at Procter & Gamble, Amgen and Janssen Ortho –as subcontracted by UNIPRO. Services concluded due job opportunity.

    • Johnson Controls

      Apr 2014 - Aug 2015

      Responsible for the operation and maintenance in the areas of HVAC, Mechanical and Instrumentation at Bristol Myers Squibb Humacao, P.R - USA. Functions include the management and implementation of procedures & practices relative to: Ozone Depleting Substances (ODS); Predictive Program (Vibration Analysis; Thermography / Ultrasound / Oil Analysis / Motor Current & Mechanical Integrity); HEPA Certification, Calibration Programs; Building Automation.Responsible for Coordination, Scheduling and Execution of various preventive maintenance shutdown. Investigate, document and implement corrective actions for Quality Events and CAPA. HVAC Team Leader during the Energy Treasure Hunt (Approx. $1MM in savings). Lead multidisciplinary team in the execution and documentation of Preventive, Calibrations and Corrective work orders Show less

      • Technical Services Team Leader II

        Aug 2015 - Aug 2015
      • Technical Services Team Leader II

        Apr 2014 - Jul 2015
    • CBRE

      Sept 2015 - Oct 2016
      Technical Services Team Leader II
    • Sodexo

      Nov 2016 - now
      OP Mgr-Facilities Engineering
  • Licenses & Certifications

    • PMP Training

      Jan 2013
    • 6 Sigma Green Belt

      Dec 2012
    • Professional Engineer

      CIAPR
      Aug 1986