Fernando Andres Marin Uribe

Fernando Andres Marin Uribe

Followers of Fernando Andres Marin Uribe280 followers
location of Fernando Andres Marin UribeVeracruz, Veracruz, Mexico

Connect with Fernando Andres Marin Uribe to Send Message

Connect

Connect with Fernando Andres Marin Uribe to Send Message

Connect
  • Timeline

  • About me

    Shadow Project Manager

  • Education

    • Universidad de Los Andes

      2003 - 2008
      Bachelors Mechanical Engineering
  • Experience

    • Schlumberger

      Jul 2008 - Aug 2015

      As a Senior Well Engineer, I was in charge of the drilling engineering team (drilling & junior engineers). Operational follow up of 4 rigs at the same time for Non-Conventional wells using UBD equipment, coordination with operations team through daily meeting including managers and rig personnel. Optimization of drilling activities, develop plans & statistics workbooks to improve drilling operations & optimization of drilling programs. Constant QHSE reporting of hazardous situations, observation / intervention to avoid possible HSE events.Quality and HSE events investigations (SCAT analysis), creating plans (RWP) in order to avoid future events and create technical alerts to be presented at the rig site.Offset wells analysis in order to define the operational mud window to work with UBD equipment. Review of drilling programs, including third party programs (mud, directional, cementing, bits, UBD) and perform hydraulics, torque & drag and casing design calculations. Create well trajectory (2D – 3D) and perform anti-collision analysis. Cost analysis and optimization in order to make it as efficient as possible.Coordination with client to get the proper information to perform drilling programs (Geological proposal, surface locations, etc.) and constant communication on daily operations in order to analyze and proper decision-making. Responsible to hand in all information to the client on time (drilling programs, end of well reports), managing the drilling engineering team. Show less As a well engineer I was in charge of 2 rigs at the same time. In charge of create drilling programs and operational follow up for Non- Conventional wells using UBD equipment.Constant QHSE reporting of hazardous situations, observation / intervention to avoid possible HSE events.Quality and HSE events investigations (SCAT analysis), creating plans (RWP) in order to avoid future events and create technical alerts to be presented at the rig site.Perform TVD curve each day and reviewing daily reports and cost reports that were created at the rig site.Perform drilling programs with the information obtain from the client and third party companies. Running of hydraulics, torque and drag while drilling, casing drilling and casing running, casing design calculations in order to drill the wells in as safety and efficiently as possible. Define drilling parameters in order to improve performance in each well. Create well trajectory (2D – 3D) and perform anti-collision analysis. Define cementing program for production section applying UBD technique (unique technique for cementing a well).Responsible of handing in all information of each well, drilling program, daily reports, end of well reports. In charge of performing Pre-Spud meeting at the rig site explaining the drilling program, operational plan and objectives of the well to the Company Man and rig site personnel.Implementation of Casing Drilling technology at the field, reducing risk of high pressure influx & lost of well.Implementation of lessons learn and optimization of drilling operations, with results of achieving the drilling record of the project in one my rigs.Active participant in Drilling symposiums hold in Buenos Aires and Neuquén. Show less As a Company Man I was in charge of the drilling and testing operations for two exploratory wells.Establish and maintain regular communication with the client, drilling contractor and Schlumberger managers and all third parties, providing feedback and technical advice.Constant QHSE reporting of hazardous situations, observation / intervention to avoid possible HSE events.Execute well control and HSE drills with all personnel present at the rig site.Implementing drilling operations following the program and company standards as safety as possible. Planning, organizing and coordinating daily rig operations with client, rig crew and third parties companies. Supervise critical operations, sign work permits and perform pre-operational meetings. Perform daily operation meetings with supervisors at the rig site in order to organize daily activities including HSE. Write driller´s instructions per shift each day, and monitor all drilling operations making sure the instructions are follow.Perform and review daily reports in the system, and do the corrections that were send from office personnel. Rig inspection prior starting drilling operations in each well, following company standards and check list.At the end of the project, in charge of cleaning and hand in location as per client and local environmental requirements. Show less Worked as a Well Engineer at the office and as a Company Man Advisor at the rig site.Perform drilling programs with the information obtain from the client and third party companies for Horizontal Wells for 4 rigs at the same time. Running of hydraulics, torque and drag while drilling, casing drilling and casing running, casing design calculations in order to drill the wells in as safety and efficiently as possible. Define drilling parameters in order to improve performance in each well. Responsible of handing in all information of each well, drilling program, daily reports, end of well reports. In charge of performing Pre-Spud meeting explaining the drilling program, operational plan and objectives of the well to the Company Man and rig site personnel. Prepare and execute daily operational meeting with client and third parties at the office.Advise Company Man in all drilling activities for all 4 rigs drilling at the same time. Implementing drilling operations following the program and company standards as safety as possible. Planning, organizing and coordinating daily rig operations with client, rig crew and third parties companies. Supervise critical operations, sign work permits and perform pre-operational meetings. Perform daily operation meetings with supervisors at the rig site in order to organize daily activities including HSE. Monitor drilling parameters while construction horizontal section. Follow up of procedures to run cased logs and reviewing integrity on cement prior starting navigation section of the well. Monitor drilling performance and requirements of the navigations sections as per client request. Review of program in order to run completion string ensuring a successful run to bottom. Coordination of companies and third parties for the daily operations for horizontal wells. Expose to drill wells with the presence of H2S, taking all operational and safety measurements in order to achieve the objective of the well. Show less As a well engineer I was in charge of rig Saxon 112. In charge of create drilling programs and operational follow up for vertical and directional wells.Constant QHSE reporting of hazardous situations, observation / intervention to avoid possible HSE events.Perform TVD curve each day and reviewing daily reports and cost reports that were created at the rig site.Perform drilling programs with the information obtain from the client and third party companies. Running of hydraulics, torque and drag while drilling, casing drilling and casing running, casing design calculations in order to drill the wells in as safety and efficiently as possible. Define drilling parameters in order to improve performance in each well. Responsible of handing in all information of each well, drilling program, daily reports, end of well reports. In charge of performing Pre-Spud meeting at the rig site explaining the drilling program, operational plan and objectives of the well to the Company Man and rig site personnel. Responsible of the rig contract and rig invoicing, reviewing times and rates that apply to each rig activity.Implementation of Casing Drilling technology at Casabe South field in order to reduce operational times and final cost of the well. This implementation was presented as a final GFE project (Schlumberger training program) with great results and reviews from the managers. Show less Assist Company Man at the rig site during his daily duties, participate in daily operations and daily meetings, operational follow up.Training in different areas of the rig and during the execution of drilling activities. Participate in Operations and HSE drills.Constant QHSE reporting of hazardous situations, observation / intervention to avoid possible HSE events.Attend Schlumberger courses assigned during this period. Complete task required as per Schlumberger training program.Help at the office to the Well Engineers with end of well reports, drilling programs, Osprey Reports, and additional help that engineers required at the office. Show less Assist Company Man at the rig site during his daily duties, participate in daily operations and daily meetings, operational follow up.Training in different areas of the rig and during the execution of drilling activities. Participate in Operations and HSE drills.Constant QHSE reporting of hazardous situations, observation / intervention to avoid possible HSE events.Attend Schlumberger courses assigned during this period. Complete task required as per Schlumberger training program. Show less

      • SENIOR WELL ENGINEER

        Jan 2015 - Aug 2015
      • WELL ENGINEER III

        Jun 2013 - Jan 2015
      • WELL SITE SUPERVISOR–COMPANY MAN

        Nov 2012 - Jun 2013
      • WELL ENGINEER III-COMPANY MAN ADVISOR

        Nov 2011 - Dec 2012
      • Well Engineer II

        Oct 2010 - Nov 2011
      • Well Engineer I

        Dec 2009 - Oct 2010
      • Field Engineer Trainee

        Sept 2008 - Dec 2009
      • Student Intern

        Jul 2008 - Sept 2008
    • Petrolatina Assets USA, LLC

      Oct 2015 - Dec 2015
      SENIOR DRILLING ENGINEER

      As a Senior Drilling Engineer for PAUSA, I was working evaluating fields for a client in order to determine the feasibility to drill and produce oil fields all over Mexico. Develop drilling plans, casing designs and drilling programs, Cost analysis and optimization and AFE elaboration. All of this as plans with the client in order to present to the tender. Work with Geology team, evaluating the previous field production in order to determine the actual reserves and define the future production plans, field evaluation and define position for future wells in the field.Perform analysis reports of each field in order to present to local government for tender. Show less

    • New Tech Global

      Jan 2016 - Mar 2016
      WELL MONITORING ENGINEER

      In charge of implementing a new software RigHour® into the Ayatsil Project. I was in charge of cleaning all data of daily drilling reports and set them into the software in the right way. Had meetings with the developers and been able to introduce improvements into the software. Having the knowledge of drilling operations I was able to take the best of the software working together with the developers. Once all data was set into the software, I was able to create operational times reports of tripping, connections, casing running and additional flat times in order to identify opportunities to reduce operational time. These reports were divided into wells, days, hours, drilling rig and drilling crew allowing to make a proper analysis to reduce all flat times. Present to the client, PEMEX, the results of the software and been able to create different strategies to optimize each well to be drilled in the zone.Provide operational recommendations for each drilling rig for each of the operation as result of the analysis done with the program Show less

    • Pan American Energy

      Apr 2016 - Oct 2018
      Drilling Superintendent (Cell Leader)

      In charge of the drilling operation and drilling engineering of 4 Rapid Rigs (Hydraulic Rigs) own by PAE into the project of PAE Rigs as a Drilling Superintendent (Cell Leader), drilling over 75 wells per year, exceeding the targets and results set for the project.Personnel Management of Drilling engineers, Company Man & Security personnel. Developed strategies and campaigns to create conscience in to the drilling crew to reduced HSE events on each rig with positive results, reducing the HSE monthly indicators.Create statistics and KPI of the project, monitoring the improvement well by well. Create monthly reports of drilling performance for each rig.Working together with DTM team and into Kaisen project in order to reduce moving time of each rig. The normal time to move the rig was 80-100 hrs, after implementation of Kaisen project the times were reduced to 50 hrs and less.Controlled the time and cost for each well drilled in order to complain with the AFE approved by the Drilling & Construction Vice-President. Analyzed each well to be drilled and working together with DDR (Reservoir Development Area) to achieve each target as requested and avoid water influx due to injectors in the area.Work together with WARROOM (OSC) taking operational decisions, defining plans and strategies to drill each well in time and cost. Implement a new design in the casing drilling BHA and tested on field, reducing times and been able to drill a well in 4 days.Work with the project leader, rig maintenance & rig superintendent to keep each rig running. Been able to replace the project leader during vacation time, taking control of the project, rig personnel, budget and maintenance management. Show less

    • SLB

      Oct 2018 - now

      I started working as a senior well engineer for the Development team in MCA. I was in charge of 2-3 wells at the same time, having operational meetings with the client and discussing future operations and optimization for the wells. Then i was promoted to be in charge of the engineering team for the same project. Also i have been involved in the financial part of the project, developing the AFE procedure and follow up and the list items follow up in order to charge the client for the jobs that have been done. Working with the PM to review the final financial distribution after each section. Show less Senior Well Engineer in charge of different rigs in the project. Started in Cell 3 as Well Engineer and currently working as Operations Engineer in Cell 2, been in charge of 2 Drilling Rigs for Ghawar Gas Project. Responsible of Drilling programs and follow up of the rig. EOWR to provide to client.Operational follow up of all drilling operations, providing technical support and guide to WSL at the rig site.Implementation of sheets to follow up and identify points of improvement in the project.Been able to cover up for cell leader when needed, vacations or transitions done in the cell Show less

      • Shadow Project Manager

        Nov 2023 - now
      • Engineering / Operations Leader

        Mar 2022 - Nov 2023
      • Senior Well Engineer

        Oct 2018 - Mar 2022
  • Licenses & Certifications

    • Well Control

      Pan American Energy
  • Volunteer Experience

    • Rotary Club member

      Issued by Colombia
      ColombiaAssociated with Fernando Andres Marin Uribe