Mike Lott

Mike Lott

Project Manager

Followers of Mike Lott5000 followers
location of Mike LottStevensville, Maryland, United States

Connect with Mike Lott to Send Message

Connect

Connect with Mike Lott to Send Message

Connect
  • Timeline

  • About me

    ProjectManager

  • Education

    • George Meany Labor College

      1988 - 2010
      Cert OSHA Instructor

      Activities and Societies: AKOSH Speaker Certificate in Teaching the OSHA 500 course & 502

    • RETS

      1990 - 1992
      Cert AUTO CAD Blue Print Reading

      Engineering & blue print reading / auto cad

    • Liberty High

      1982 - 1984
      High School Diploma HIGH SCHOOL/SECONDARY DIPLOMAS AND CERTIFICATES

      Activities and Societies: Football High School work

    • Pikesville Sr High

      1980 - 1982
      High School High School/Secondary Certificate Programs

      Activities and Societies: Football High School Work

  • Experience

    • URS Corporation

      Jan 1996 - Jan 1998
      Project Manager

      • Responsible for the construction of cellular communication sites/raw- land tower sites/water tank sites/roof top sites and Sectorization of existing sites.• Developed pre-construction documents, requests for quotes, scopes of work and schedules for the development of cellular communication sites.• Managed all contractual arrangements for site construction. Selected qualified contractors analyzed bid packets and ordered client supplied materials. • Checked all phases of construction, ensured the final project met with client’s specifications as well as national and local codes.• Monitored material testing to assure the structure under construction would meet design demands.• Assisted engineering staff with initial walks and the subsequent development of plans required for construction.• Approved sites for contractor settlements. Developed project closeout books for the client.• Responsibility for Accounts Receivables and Accounts Payable. Show less

    • Winstar Communications

      Jan 1998 - Jan 2000
      Manager Fiber Implantation on the East Coast

      • Coordinated with engineering staff and contractors designing fiber routes for pre-construction and design walks with building manager and owners from Virginia to Massachuttes.• Work with. Overseeing all aspects of construction from site layout, excavation, concrete placement, build out and finishes. NOC & Switch build out and Hubs.

    • Midwest Wireless

      Jan 2000 - Jan 2001
      Project Manager / CM (Consultant)

      • All aspects of construction. Acquiring search ring with RF.• Reviewed and obtained final approval for construction drawings from owners.• Worked with Zoning to resolve any construction issues. • Procured contracts with A&E firms for design.• Worked with field construction superintendents to complete projects.

    • Coler & Colantonio, Inc.

      Jan 2001 - Jan 2002
      Project Manager (Consultant)

      • Responsible for designing commercial construction sites to house Network Hubs, Switch Operations, etc.• Managed CADD operators and engineers to produce stamped drawings on schedule.• Scheduled and verified sub-contractors for specific jobs sites.• Maintained daily project reports and developed close out books and Weekly conference calls.• Developed pre-construction documents and requests for quotes, scopes of work and construction schedules.

    • SBA Network Services

      Jan 2006 - Jan 2008
      Project Manager

      Responsible for the construction of cellular communication sites/raw- land tower sites/water tank sites/roof top sites and Sectorization of existing sites. Developed pre-construction documents, requests for quotes, scopes of work and schedules for the development of cellular communication sites.• Monitored material testing to assure the structure under construction would meet design demands• Responsible for all the construction aspect of (DAS) in DC, MD & VA Fiber and OSP Show less

    • Ridge Communications / newpath

      Jan 2008 - Sept 2009
      Project Manager / Construction Manager / Safety Manager

      I was a PM / CM for Ridge Communications building DAS systems for Newpath on the East Coast and West Coast. I was also building in door DAS systems for Ridge. I was also the Safety Manager for the company, Teaching the 10 hour and 30 hour OSHA course.

    • Newpath / Crown Castle

      Sept 2009 - Sept 2012
      CM Manager
    • Crown Castle

      Sept 2012 - Jun 2024

      Construction Manager / Project Manager for DAS antennas systems on the East Coast. I have been building Newpath DAS systems for the past 7 years for Newpath / Crown Castle.

      • Supervisor Network Construction

        Nov 2020 - Jun 2024
      • Project Manager

        Sept 2012 - Nov 2020
  • Licenses & Certifications

    • OSHA 502

      OSHA-Safety-Training.com
    • Leading at Crown Castle

      Harvard Business Publishing Corporate Learning
      Dec 2020
      View certificate certificate
  • Volunteer Experience

    • Soup Kitchen

      Issued by Baltimore Shelter
      Baltimore ShelterAssociated with Mike Lott