Neeraj Pathak

Neeraj Pathak

Engineering Trainee

Followers of Neeraj Pathak2000 followers
location of Neeraj PathakJamnagar, Gujarat, India

Connect with Neeraj Pathak to Send Message

Connect

Connect with Neeraj Pathak to Send Message

Connect
  • Timeline

  • About me

    Electrical Reliability Engineer at Reliance industries limited

  • Education

    • Dalmia Public School, Sutrapada

      2008 - 2009
      SSC PCM
    • NK Dav public school, sidheegram

      1994 - 2007
    • GOVERNMENT ENGINEERING COLLEGE, BHARUCH 014

      2009 - 2013
      Electrical Engineering Electrical Distinction
  • Experience

    • Gujarat sidhee cement limited

      Apr 2014 - Nov 2016
      Engineering Trainee

      I was looking after 132/11 KV Switchyard with 2 nos of 18 MVA power transformer and 6 nos of 2.5 MVA distribution transformer. Also 2 nos of 3.6 MW of HT motor for clinker grinding, 4 nos of 2 MW HT motor of booster fans for kiln , as well as 1.35 MW HT motor of crusher. As well as it's starter like LRS, GRR and VFD driven.

    • Reliance Industries Limited

      Dec 2016 - Sept 2019
      Electrical Maintenance Engineer

      I was looking after from 220 KV switchyard with two nos of 120 MVA(220KV/33KV) power transformer, also HV Substation consist of 6 nos of 31.5 MVA power transformer (33KV/6.6KV), 2 nos of 15 MVA(33KV/6.6KV) Power transformer & 2 nos of 12.5 MVA(33KV/6.6KV) Power transformer. I have done retrofitting job of 10 nos of 2.5 MVA distribution transformer which were 30 yrs old. Also PM & CM of 52 nos HT motor(6.6 KV) of various ratings like 1.8 MW, 1.5 MW & 500 KW. PM of HT BUS (6.6 KV & 33KV BUS) & LT Bus. Show less

    • Aarti Industries Ltd.

      Oct 2019 - Aug 2021
      Assistant Manager

      I was looking after operation and maintenance of Electrical in Alchemie plant also in parallel with that handling an MOC which consist of installation of two no.s of 2.5 MVA(11KV/.415KV) transformer with also two no.s of 750 KVA DG. Also commissioning of 11 KV and 415 V bus panel.

    • Bayer

      Aug 2021 - Nov 2022
      Manager

      I was looking after 66kv switchyard with two nos of 10 MVA POWER TRANSFORMER and 7 nos of 2.5 MVA distribution transformer & 1 nos of 3.5 MVA distribution transformer. There are total 12 plants & 3 utility under electrical team. All electrical plant equipment O&M activity are done as well as minor project execution is also done. with this one nos of plant commission is also started. two nos of DG's 1500 KVA & 810KVA commissioning is also undergoing.

    • Reliance Industries Limited

      Dec 2022 - now
      Reliability Electrical Manager
  • Licenses & Certifications

    • Electrical Protection System

      R-University
      May 2018
    • Permit for Electrical Supervisor

      Government of Gujarat
      Jul 2015
    • Switchyard equipment

      ABB
      Apr 2017
    • Top performance in process&plant safety

      Bayer
      Jul 2022
    • ABB Relays

      ABB
      Jul 2017
    • HV/LV Motors

      ABB
      May 2017
    • Power Transformer

      ABB
      May 2017
    • Interpersonal Communication

      LinkedIn
      Jun 2025
      View certificate certificate
    • Tips for Better Business Writing

      LinkedIn
      Jun 2025
      View certificate certificate
    • DIAGNOSTIC TESTING OF ELECT EQUIPMENT

      NTPC Limited
      Mar 2018