Kevin Gallo

Kevin Gallo

Manufacturing Engineer

Followers of Kevin Gallo667 followers
location of Kevin GalloBarrington, Illinois, United States

Connect with Kevin Gallo to Send Message

Connect

Connect with Kevin Gallo to Send Message

Connect
  • Timeline

  • About me

    Engineering Group Lead at International Motors

  • Education

    • Northern Illinois University

      1990 - 1995
      Bachelor's Degree Mechanical Engineering
  • Experience

    • Chicago Blower Corporation

      Jul 1995 - Mar 1997
      Manufacturing Engineer

      Management:- Managed 12 workers in key departments by setting up assembly lines to produce 40 units daily.- Developed order scheduling, workflow and time process for job completion.- Set up assembly line to produce 40 units daily.- Supervised materials procurement; provided production with tooling resulting in efficient fabrication and assembly.- Interfaced with design department to resolve manufacturing problems.- Performed quality control inspections.

    • ACS Group

      Mar 1997 - Dec 2004
      Lead Product Engineer

      Management:- Directed eight engineers, monitoring job releases, quotes and workloads to ensure quality performance and timely completion of projects.- Oversaw ¼-ton to 40-ton portable chiller and 25-ton to 195-ton central chiller lines.Achievements:- Released up to 150 custom product orders annually.- Reduced custom orders by over 50% and lead times by standardizing special options and reducing many custom products.- Decreased custom product lead-times by up to a week with order documentation and scheduling of job releases.- Designed and build a ¼-ton prototype chiller in 1-1/2 weeks.Product Development:- Detailed experience in refrigeration systems, heat transfer applications, fluids, glycol cooling and thermodynamics.- Design custom cooling systems for laser and plastic industries, including valve and pump sizing.- Provide AutoCAD wiring schematics, piping diagrams, assemble bills of material and schedule project timelines for manufacturing. Show less

    • Hussmann

      Jan 2005 - Oct 2010
      Senior Project Engineer/Commercial Group Lead

      Management:- Responsible for the engineering process from receipt of order to Commercial Group Engineering release to shop floor support.- Monitor Commercial Group Workloads; delegate jobs effectively.- Spearheaded release of new product line.Achievements:- Drove bill of material accuracy to above 98%.- Maintain on-time deliveries with engineering releases and customer drawings.- Standardize pricing on specialized units.Product Development:- Work with engineers from Monterrey, Mexico to complete smooth product transfer.- Designed and released new product option for existing condensers.- Generated electrical wiring and programming for new features added to standard product line.- Provide Sales and Application Engineering support to ensure condensers and condensing units are engineered to meet customer requirements; sizing and circuiting of units to meet specific job needs; job quoting for non-standard applications.- Provide Service and Parts support to resolve field issues.- Completed projects revising technical specifications, brochures, catalogs, operation and installation manuals, electrical/mechanical drawings. Show less

    • International

      Oct 2010 - now

      Management:- Thermal Management lead for design and development of trucks and tractors for program with annual sales of approximately $100M.- Managed team of engineers who completed part designs, releases, bills of material, build books and work instructions.- Hired and managed outside engineering firm when internal resources were limited.Achievements:- Launched high-quality programs on-time and worked within program budget to develop individual design engineering hours and timing.- Worked with Manufacturing, Cost Analysis, Supplier Quality and Purchasing to verify correct parts were sourced, priced properly, quality approved and received in a timely manner for build events.Product Development:- Traveled to multiple manufacturing facilities to help provide support to program team during build events.- Worked with Vehicle Architecture and other System Management Teams to review fully integrated designs, develop complete vehicle 3D models and finalize designs.- Followed up on in-program scope changes and build issue clean-up to produce high-quality trucks and tractors. Show less Management:- Thermal Management Cost Reduction team lead.- Supervised six engineers and monitored their individual cost reduction ideas on a continuous basis.- Developed and presented weekly reports to upper management on current status, progress and future goals.- Lead for Cost Reduction cross functional team that includes Engineering, Purchasing, Quality and Manufacturing.Achievements:- Produced $8.3M savings for FY2012, with another $3.3M carrying over into FY2013.- Saved an additional $0.9M by improving release date of modified aftertreatment system by 1-1/2 months.- Improved Thermal Management Cost reduction savings by more than 31% over previous years.Product Development:- Participated with Cost Reduction team to develop new ideas for savings.- Directly worked with assembly plants to schedule new product releases and pilot runs.- Detailed experience in automotive transmission, cooling, HVAC and exhaust systems. Show less

      • Engineering Group Lead

        Dec 2012 - now
      • Product Development Engineering Team Lead

        Oct 2010 - Dec 2012
  • Licenses & Certifications

    • Fundamentals of Engineering (FE)

      May 1995