SENTHIL KUMAR GANESAN

Senthil kumar ganesan

bookmark on deepenrich
location of SENTHIL KUMAR GANESANChennai, Tamil Nadu, India
Phone number of SENTHIL KUMAR GANESAN+91 xxxx xxxxx
Followers of SENTHIL KUMAR GANESAN2000 followers
  • Timeline

    Jun 1994 - Feb 1999

    Senior Electrical Engineer

    Mac Agro industries ltd
    Mar 1999 - Mar 2002

    Asst.Manager(electrical)

    ICL Sugars Ltd.
    Mar 2002 - Jan 2008

    Senior Manager (Electrical)

    SAKTHI SUGARS LTD
    Jan 2008 - Jan 2010

    Manager (Electrical)

    JSW Energy Ltd
    Mar 2010 - Mar 2012

    Manager Electrical

    GMR Energy Limited
    Mar 2012 - Jun 2024

    Asst. General Manager (Electrical)

    Coastal Energen Pvt Ltd
    Aug 2018 - Jun 2024

    General Manager Electrical

    BGR Energy Systems
    Current Company
    Jun 2024 - now

    General Manager (Substation)

    VIVIID RENEWABLES PVT LTD
  • About me

    General Manager(Substation) at Viviid Renewables Pvt Ltd

  • Education

    • Alagappa chettiar college of engineering & technology (accet)

      1990 - 1994
      Bachelor’s degree electrical and electronics engineering i st class
  • Experience

    • Mac agro industries ltd

      Jun 1994 - Feb 1999
      Senior electrical engineer

      Maintenance of Electrical systems meant for the Sugar plant and it’s associated, Co- Generation Plant.Maintenance Budgeting and overhauling of Electrical Systems.Liasioning with statutory authorities for renewal of Permission for running

    • Icl sugars ltd.

      Mar 1999 - Mar 2002
      Asst.manager(electrical)

      1.Erection and commissioning of 2 * 6 MW Turbo Generators and its associated Switchgears.2. Erection and commissioning of 66 KV Transmission Line and 66 KV Switchyard.3. Erection and commissioning of Electrical systems meant for the Associated Sugar plant.4. Maintenance of Electrical motors, Switchgears and other Electrical systems meant for the Sugar plant.

    • Sakthi sugars ltd

      Mar 2002 - Jan 2008
      Senior manager (electrical)

      Project Experience:• Evaluating the design of electrical equipments meant for 35 MW Power Plant in co ordination with M/s Avant Garde Consultants.• Finalizing the specification of the equipments meant for the Power Plant , Preparation of Tenders and floating of Tenders to various suppliers with regard to equipment supply for the Co Generation Power plant.• Took part in price negotiation and order finalization of the equipments meant for 35 MW Power plant.• Follow up with Vendors after placement of order to deliver the equipments in time• Lead a team in successful erection and Commissioning of 35 MW Power plant which involves 35 MW Generator, 110 KV Switchyard, 11 KV Switchgears and other Electrical systems.• Having deputed to the following Places for inspection of Electrical Equipments.1. 35 MW Alternator -M/s Nanyang Electric china2. 31.5 MVA/40 MVA Transformer -M/s QRE China3. Variable Frequency Drive -M/s SSD Drives USA4. 660 KW motor -M/s Siemens,Kalwa. Instrumentation:Involved in all phases of the Projects such as finalizing the specification of the Equipments, floating tenders, contract negotiations and placement of orders of the equipments meant for 35 MW power plant.Have experience in erection and commissioning of the Yokogawa make DCs centum 2000 system meant for 35 MW power Plant.Supervised a team engaged in operation and maintenance of instrumentation equipment for Boiler controls and other process controls. Show less

    • Jsw energy ltd

      Jan 2008 - Jan 2010
      Manager (electrical)

      Worked in 1080 MW - 8x135 MW Lignite Based Thermal Power Projects of Raj West Power Limited (JSW Energy), Barmer –Rajasthan, as Manager (Electrical) Project Management: Monitoring Rs.326 Cr, BOP package and ensuring its timely completion. Coordinating projects for the set up standards with accountability for strategic utilization & deployment of available resources to achieve organizational objectives. Monitoring the activity at sites and review of project schedule, ensuring cost control within budget, etc. Erection & Commissioning: Erection & Commissioning of 8x135 MW - BTG & BOP Electrical equipments including Transmission line length of 2x400 KV D/C–240 KM & 2x220 KV D/C– 20 KM. Erection & Commissioning of 400 KV & 220 KV switchyards including 325 MVA ICT. Successfully achieved commissioning of 1X135 MW Units including required BOP.  Operations & Maintenance: Planning & implementing the preventive & predictive maintenance schedules for improving the overall reliability and safety of plant equipments & machinery for the 135 MW unit.  Conservant with M/s ABB make REB,REL,REC and RET Relays Maintaining & reviewing history records of equipments for repeated breakdowns to analysis and carrying out necessary corrective actions. Liasioning: Responsible for liasioning with Electrical Inspectorate & transmission & Distribution companies.  Team Management: Leading, mentoring and monitoring performance of team members to ensure efficiency. Show less

    • Gmr energy limited

      Mar 2010 - Mar 2012
      Manager electrical

      • Heading the Electrical department in erection and commissioning of all electrical systems.• Electrical Design reviews and equipment finalization.• To Coordinate with Quality department in defining/approving various Manufacturing quality plan for the equipments meant for Power Plant.• Project Coordination with consultants and Vendors of various packages in designing the electrical systems for the Power Plant.• Coordination and liasioning with various statutory authorizes in getting approvals for the electrical systems..• Lead a team in erection and commissioning of Electrical systems meant for the 2 * 300 MW Power Plant which includes1. 400 KV Switchyard and the Substation Automation system2. 315 MVA 400 KV/20 KV Generator Transformers ,45 MVA Station Transformers and its associated Switchgears.3. 300 MW Turbo Generator and associated IPBD.4. All electrical systems meant for BOP such as CHP,WTP and AHP. Show less

    • Coastal energen pvt ltd

      Mar 2012 - Jun 2024
      Asst. general manager (electrical)

      Working as Asst.General Manager (Electrical) in 2x600 MW Thermal power Plant and Heading the Electrical Department. Project Management Have Executed Rs.300 Cr, GIS & EBOP package and instrumental in conceptual design to commissioning of the Plant and ensured its timely completion.Review of design drawings ,incorporation of additional design requirements, facilitating design change in consultation with the design consultant.Interacted with design consultants, for review of drawings, early release of drawings for construction and following it up with contractors for timely arrangement of resources for completion of Project in time.Review of quality Plans submitted and timely approval of the same for Manufacturing Clearance. Arranging and carrying out Inspection of various electrical Equipment and ensuring timely delivery of Equipment to the site.Have Led a team in successful erection and Commissioning of 400 KV GIS Switchyard, 750 MVA Generator Transformers ,Associated IPBDs, 50 MVA Station & unit Transformers and associated 11 KV & 6.6 KV Switch gears, 600 MW TG set ,Excitation system and other Auxiliaries.Electrical Maintenance & Budgeting: Heading the Electrical team in Maintenance of Electrical Equipment meant for 2* 600 MW Power Plant.(Main Plant BTG and BOP).Devised Maintenance philosophy for each and every equipment and devise Preventive maintenance schedule and implementation of the works as per the schedule. Prepared Annual maintenance Shutdown schedule and have successfully carried out the work within stipulated time, which involves Complete transformer testing, Switch gear Maintenance, relay calibration/testing and generator testing. Preparing Annual Budget for expenses to be incurred during the year for upkeep of the equipment and effective cost control put in place for not exceeding the budgeted amount. Spare maintenance and upkeep of the other equipment for smooth running of the Power Plant. Show less

    • Bgr energy systems

      Aug 2018 - Jun 2024
      General manager electrical
    • Viviid renewables pvt ltd

      Jun 2024 - now
      General manager (substation)
  • Licenses & Certifications

    • Energy auditor certified by bee