Seah Kenneth

Seah Kenneth

Safety Coordinator Cum Quanity Surveyor

Followers of Seah Kenneth623 followers
location of Seah KennethSingapore

Connect with Seah Kenneth to Send Message

Connect

Connect with Seah Kenneth to Send Message

Connect
  • Timeline

  • About me

    Safety Manager , Bachelor of Environmental and Occupational Health and safety (BEnvOHS) , Registered WSHO , ECO , FSM , ACTA Trained

  • Education

    • Singapore Polytechnic

      2003 - 2006
      Diploma in Building and Property Management
    • Jurong Primary School

      1991 - 1996
    • University of Newcastle

      2017 - 2019
      Bachelor of Environmental and Occupational Health and Safety Occupational Safety and Health Technology/Technician
  • Experience

    • Eng Xian Construction Pte Ltd

      Jun 2008 - Jul 2010
      Safety Coordinator Cum Quanity Surveyor
    • Tiong Woon Crane and Transport Pte Ltd

      Aug 2010 - Aug 2013
      HSSE Coordinator

      Crane supplier and heavy hoisting to Construction, Oil and Petroleum Industry and LTA Project – Island-wide

    • Takenaka Corporation

      Sept 2013 - Jul 2015
      Health, Safety, Security and Environmental Coordinator (Main Con)

      Project: Construction of Changi Airport Terminal 4 (Main Con) Jul 2014 till Jul 2015 Contract Sum: 985 MillionsMain Contractor: Takenaka CorporationProject: Restoration of National Art Gallery (Main Con) Sep 2013 till Jul 2014 Contract Sum: 530 MillionsMain Contractor: Takenaka Corporation

    • M+W Singapore Pte Ltd

      Jul 2015 - Dec 2015
      Environment, Health and Safety Coordinator (Main Con)

      Project: Alcon Project, Construction of Proposed addition and alteration to existing single storey Singale user Factory Factory Building involving addition of 2-storet Manufacturing Building at 133 Tuas South Avenue 3 Crescent (Main Con)Contract Sum: 60 MillionMain Contractor: M+W Singapore Pte LtdProject: Pacific Refreshment, Construction of Factory and linkbridge at Tuas Bay Drive (Main Con)Contract Sum: 79 MillionsMain Contractor: M+W Singapore Pte Ltd

    • JOSH Solutions Pte Ltd

      Jan 2016 - Nov 2016
      ECO , Solutions Consultant

      Main Contractor: Transbuild Corporation Pte Ltd (Formerly B Construction)Project: Jurong Vista (JE N2 C25), Construction of 1 block of 22 Storey & 1 Block of 28 storey Residential Building with 1 block of 6 storey MSCP with Roof Garden at Jurong East Ave 1 (Main Con)Contract Sum: 25 million (Client: HDB)

    • Ryobi Kiso

      Dec 2016 - Aug 2018
      Workplace Safety and Health Officer cum Environmental Control Officer

      Project: JTC Logistic Hub (Benoi), Main Contractor for Phase 1 Period Contract Sum – 12 MillionsMain Contractor: Ryobi Kiso Pte Ltd (Client: JTC)Project: NUS Wet Science Building, Piling Works Period Contract Sum – 4.3 MillionsMain Contractor: Ryobi Kiso Pte Ltd (Client: NUS)Project: JTC Metal, Machinery and Timber (MMT) Hub (Kranji Project) Period Main Contractor: SH Design and Build (Client: JTC )Project: Bidadari C8 & C9, Piling Works PeriodMain Contractor: Chip Eng Seng (Client: HDB)Project: Bedok N5C19, Piling Works PeriodMain Contractor: China Construction Realty Co. Pte Ltd (Client: HDB)Project: Sengkang SKN4C41, Piling Works Period Main Contractor: Hock Guan Cheong (Client: HDB)Project: LTA- T227,Thomson- East Coast Line – Construction of Marina South Station and Tunnels Piling Works PeriodMain Contractor: Sinohydro Corporation - Sembcorp Design JV (Client: LTA)Project: 45 Amber Condo, Piling Works PeriodMain Contractor: UNISON Construction Pte LtdProject: Nexus International School, Piling Works Period Main Contractor: Straits Construction Show less

    • ZAP Piling Pte Ltd

      Sept 2018 - Mar 2020
      Lead Workplace Safety and Health Officer cum Environmental Control Officer

      Project: 17CB – Central Boulevard (Downtown Core Planning Area) (Main Con) Period Contract Sum – 44.6 MillionsMain Contractor: Zap Piling Pte Ltd (Client: Guoco Land)Proposed New Erection of 11 Storey Data Center (Facebook Data Center) Period Contract Sum – 1.4 BillionsMain Contractor : Fortis Construction (Client: Facebook)Proposed Design and Construction of North-South Corridor (Tunnel and Viaduct) between Ang Mo Kio Ave 9 and Sg Seletar PeriodContract Sum – 537 millionsMain Contractor : SsangYong (Client: LTA ) Show less

    • Sport Singapore

      Mar 2020 - Aug 2020
      Sport Singapore Assistant Quality Assurance & Safety Manager

      Lead Projects- Computer Visual Drowning Detection System for pool safety in all the Sport SG facilities- Lighting Warning Detection system in all the Sport SG facilities- BCP for Covid19- Migration of ISO45001 from OHSAS 18001 for SportSG and 20+ Sport Centres- Cross Audit for HQ and all the Sport Centres

    • SH Design & Build Pte Ltd

      Sept 2020 - Jun 2021
      Site Safety Manager

      Project: JTC Metal Machinery Timber Hub (MMT @ Kranji) (Main Con) Period Contract Sum – 280 MillionsMain Contractor: SH Design and Build (Client: JTC)

    • SINOTCC Singapore Pte Ltd

      Jun 2021 - now
      Safety Manager

      Project: PROPOSED ERECTION OF ISOPRENE RUBBER LATEX(IRL) PLANT FACILITIES AND OTHER ANCILLARIES (PROJECT SPRING) Contract Sum – 106 Millions (Main Con)Main Contractor: SINOTCC Singapore Pte Ltd (Client: Cariflex)Project: PROPOSED ADDITIONS AND ALTERATIONS TO EXISTING SINGLE USER DEVELOPMENT INVOLVING ERECTION OF PROCESS STRUCTURE AND ANCILLRY BUILDING (Sabic Saffron B Polymer plant)Contract Sum – Non disclosedMain Contractor: SINOTCC Singapore Pte Ltd (Client: CTCI)Jun 2021 till Aug 2022 Show less

  • Licenses & Certifications