Umer Bashir

Umer Bashir

Internee

Followers of Umer Bashir1000 followers
location of Umer BashirPakistan

Connect with Umer Bashir to Send Message

Connect

Connect with Umer Bashir to Send Message

Connect
  • Timeline

  • About me

    Mechanical Project Engineer at Fauji Fertilizer Company Limited Pakistan

  • Education

    • Centre of Advance Studies In Engineering, Islamabad

      2016 - 2017
      Master's degree Engineering Managment A +
    • F.G Sir Syed Collage,The Mall Rawalpindi

      2002 - 2004
      F.Sc Pre-Engineering A +
    • University of Engineering and Technology, Taxila

      2005 - 2009
      Bacholar of Engineering Mechanical Engineering A +
  • Experience

    • Pakistan Ordanance Factory Wah Cantt

      Jun 2007 - Jul 2007
      Internee

      Internee

    • Warid Tekecom Pakistan Limited

      Mar 2008 - Apr 2008
      Internee

      Internee

    • Pakistan Aeronautical Complex Kamera

      May 2008 - Jun 2008
      Internee

      Overhauling of Turboprop, Turbojet Aircraft EnginePrecision Machining of Parts used in Aerospace IndustryComputational Dynamics Analysis of an Aircraft Wing, FuselageImproving the reliability of Landing Gear Mechanism

    • Attock Petroleum Limited

      Jun 2008 - Jul 2008
      Internee

      Internee

    • Heavy Mechanical Complex Taxila

      Feb 2009 - Mar 2009
      Internee

      Internee

    • Fauji Fertilizer Company Limited

      Dec 2009 - now

      A seasoned fertilizer plant professional with over 12 years of diverse experience in managing stationary and rotary equipment. Proven track record as a team leader for two parallel stream Ammonia/Urea plants. As a mechanical engineer, I have a strong understanding of maintenance programs, ensuring reliability through comprehensive maintenance strategies and a robust integrity regime. I have extensive experience in overseeing all aspects of design, engineering, upgradation, modification, testing, installation, and commissioning of equipment, from concept to realization. Show less Responsible for Operation and Maintenance of all Utility services including Heating, Ventilation and Air Conditioning System VAC, Fire Fighting and Plumbing System, Elevators, Diesel Gensets, Water Treatment & RO Plant and Building Managements Systems (JCI), physical Security , Life and Fire Safety and Energy Conservation through Artificial Intelligence.During Construction of Sona Towers, I was overseeing following aspects:-Responsible for Design review, Selection and Procurement of all Mechanical Equipment, Installation, Testing and Commissioning and subsequent Maintenance of HVAC work packages including other mechanical system at the Sona Towers ( FFC head office building) comprises of 21 floors.Responsible for O & M of different MEP systems including piping systems, Chillers (absorption & compression cycle based), cooling Towers, AHUs FCUs, Pumps, Hot Water Heaters, Water Treatment and RO Plant, Elevators, Jet Fan and Smoke Extraction Fans, Staircase Pressurization Fans, Diesels Gensets, Workplace Safety Managements System, Environmental Impact Assessment, Project Management and BMS other related sub system as per ASHARE, NFPA, SMACNA, AHRI and Eurovent Codes & StandardsCoordinate with material expediters concerning critical items of supply and expenditure forecasts.Updating the planning/scheduling for project tasks and allocating manpower to achieve targets.Taking quantity take-off from drawings to place the orders for the materials required and selecting material as per specifications.Review of shop drawings and guide draftsman, checking the pressure drop in ducts and pipes, checking the size of the ducts and pipes, head pump calculation.Inspection of works and materials ensuring compliance with technical specifications, technical drawings and approval of shop drawings.Ensuring Compliance to Design and Standards& Code Specifications, legal, environmental and statutory laws Show less Piping Stress/flexibility Analysis• Piping layout/routing, isometric checking and support marking• Stress/flexibility analysis of high temperature/pressure process piping as per B31.3 • Tracking of failure mode, identification of cause and remedial actions.• Arrest of gasket leakage problems through piping supports relocation and modification.• Piping support design, span calculations and proper placement as per field constraints• Survey and site implementation of process piping construction and problemsEquipment Design• Mechanical design/up rate of Pressure Vessels, Heat Exchangers, Storage Tanks & Expansion Bellows based on ASME Section VIII, Div.-1 , TEMA & APIs codes • Development of fabrication/shop Drawings for in house fabrication• Preparation of WPS/PQR along with Inspection Test Plan• Preparation of Inquiry specifications (Requisition for Quotation, RFQ)• Vendor correspondence, Technical bid evaluations / recommendations• Technical discussions with vendor prior to order• Review of vendor’s mechanical design calculations & Inspection procedures• Review and approval of vendor drawings and documents• Preparation the load of equipment on the structures• Preparing Material Requisition for purchase of equipmentSteel Structure Evaluation (ASD/LRFD Method)• Steel Structure design and evaluation of new structural System using STAAD Pro.• Steel structural evaluation of existing structure with new load application• The over stressed beam of E-110 structure were reinforced with addition of bracings. Likewise, the columns of MPD structure were overstressed and the same was passed by adding plates to the length of the column.• Erection and inspection of new structure at site• Miscellaneous jobs like design of platforms, ware house extensions, design of trusses etc are being dealt in routine Show less

      • Mechanical Maintenance Engineer

        Aug 2017 - now
      • HVAC and BMS Engineer ( Facility Manager)

        Feb 2013 - Aug 2017
      • Mechanical Project Engineer

        Dec 2009 - Feb 2013
  • Licenses & Certifications