Hazem Bairam

Hazem Bairam

TRAINEE ENGINEER

Followers of Hazem Bairam1000 followers
location of Hazem Bairamالدوحة قطر

Connect with Hazem Bairam to Send Message

Connect

Connect with Hazem Bairam to Send Message

Connect
  • Timeline

  • About me

    Senior Construction Manager at Al Jaber Engineering W.L.L

  • Education

    • Jordan University of Science and Technology

      2003 - 2008
      Bachelor's degree Civil Engineering
  • Experience

    • UEC United enterprises company

      Jun 2007 - Jun 2008
      TRAINEE ENGINEER

      TRAINEE ENGINEER at UNITED ENTERPRISES COMPANY (UEC)Location: Amman-JordanJune 2007 – June 2008Projects: 1) Baqa’a IntersectionsPROJECT OVERVIEW:In front of Baqa’a camp, Amman-Jerash highway the construction of a 6 Kilometers long double carriageway with 9 Kilometers crush wall barrier and 9 Kilometers fence above the crush wall.Bridge construction consist of 7 spans each one has 10 precast post tensioned girders , 6 piers , 2 abutments and 4 X 250m retaining walls.Plus widening and Rehabilitation for some existing roads inside Baqa’a camp with curb stones. Main contractor: UEC Project Duration: 540Days Client: Ministry of Public Works and Housing (MPWH) Project Budget: 10,000,000 JD Engineer: Sigma Engineering Center KEY RESPONSIBILITIES • Inspect, field operation to ensure that all works are satisfactorily performed in good workmanship and the quality as per approved construction drawings and specifications.• Following concrete, formwork, steel reinforcement for (raft foundations, walls, piers, girders, diaphragms, and deck slabs) , girders post tensioning, girders erections, and elastomeric bearing. • Preparation of Weekly and Monthly Reports and Daily Reports• Preparation of Shop drawings عرض أقل

    • COPRI Construction Enterprises Est. / UAE – Abu Dhabi

      Jun 2008 - Dec 2010
      Site Engineer

      SITE ENGINEER at COPRI Construction Enterprises Est. / UAE – Abu DhabiLocation: Amman- JordanJune 2008 – January 2011Projects: 1)Amman Ring Road ARR (Amman Development Corridor ADC – Phase 1 Contract 1, Ministry of Public Working & Housing (MPWH) Tender No.49/2004PROJECT OVERVIEW:The construction of a 20 Kilometers long double carriageway and 40 Kilometers of Service Roads with Clover leave Interchange Directional Interchange (Airport Interchange), three diamond Interchanges, 6 Underpasses & Retaining walls. Reconstruction of a 3 Kilometers of Rujum Shami/Al-Dehaibieh Road. Telecommunication Civil works. Road furniture works (Traffic signing, traffic marking, N.J.B, Guard Rail … etc.). Street lighting works for the mainline and 30 meters High mast for interchanges, Construction of Additional 18 electrical Substation Buildings with associated crossing ducts. Drainage works including Box & Pipe culverts, slope protection and Concrete lined ditches along the Main Road. Construction of New parking area, Service road and drainage works for the Licensing Department.Main contractor: COPRIProject Duration: 900 Days Client: Ministry of Public Works and Housing (MPWH)Project Budget: 80,000,000 JD Engineer: Consulting Engineering Center (CEC) Project Management Team: Dar Al Handasah –Shair & Partners KEY RESPONSIBILITIES •Inspect, oversee and monitor field operation to ensure that all works are satisfactorily performed in good workmanship and the quality as per approved construction drawings and specifications.•Co-ordinate with consultants and project management regarding shop drawings and take the approval for the same.•Executing and Monitor the culvert works (Box&pipe) including wing walls. •Executing and Monitor the precast work (concrete barrier&street light foundation)•Executing and Monitor the over passes & under passes. •Preparation of Weekly and Monthly Reports and Daily Reports عرض أقل

    • MASCO

      Jan 2011 - Oct 2016

      1) HIGHWAYS TYING KING ABDULLAH SPORT CITY IN JEDDAH & RELEVANT JUNCTIONSWorking as Deputy Project manager (May 2015 – October 2016) PROJECT OVERVIEW:The Project consist of 3 interchanges with 11 girder bridges, 2 cast in situ box girder bridges & 50 Km of highways linking King Abdullah sport city with Al-Madina road and Al-Haramain road providing entrances & exits to the sport city. It contains several unique structural items such 40m deep piles with 2.2m diameter, raft footings 7m deep below the water table, 25m height circular columns with 1.5 & 2.2m Dia., 2 km retaining walls with height varies (6-12)m, cladding work for columns & walls using GRC panels Main contractor: MASCO Project Budget: 450,000,000 SR CLIENT: MOT (ministry of transport) Consultant: euro group عرض أقل 2) Royal Commission Roads & Bridges project-Jubail, Contract 092-C44Working as construction manager/approved from royal commission (January 2014 - May 2015) & Structural superintendent engineer / approved from royal commission (October 2012 -January 2014)PROJECT OVERVIEW: The project consists of 3 interchanges with 3 girder bridges & 2 voided deck slab bridges in addition to 11 km highways linking Jubail industrial city with Jubail main highway. The bridges contains of piles, raft footings (with deep excavation using Well point dewatering system), circular & rectangular pier columns, abutment walls, retaining walls, MSE walls, cap beams, precast girders with & without Post Tension, Bearing bad (Elastomeric & Pot)…etc. Main contractor: MASCO Project Budget: 260,000,000.00 SR CLIENT: Royal Commission for Jubail & Yanbu Project Manager: Bechtel عرض أقل 3) Riyadh Secondary Road project-Phase 1 Working as project engineer (January 2011 – October 2012) PROJECT OVERVIEW:The project consists of 5 interchanges with 17 bridges & underpass in two parts, the first part consist of 13 km highways connecting Al- Kharj new road with Al-Sulai road which is to be stated as the new southern leg in the ring road & the second part was to connect the southern area with the northern area along the eastern ring road at Exit 6 & Exit 7 (Middle of Riyadh). The project consist of piles, raft footings, pier columns, abutment walls & columns, cap beams, precast girders with post tension, elastomeric bearings, deck slabs, finishing work…etc. Main contractor: MASCO Project Budget: 559,900,000 SR. CLIENT: MOT (ministry of transport) Consultant: V3 & Ital. consultant عرض أقل

      • Deputy Project Manager

        May 2015 - Oct 2016
      • CONSTRUCTION MANAGER / Structural superintendent engineer

        Oct 2012 - May 2015
      • Project Engineer

        Jan 2011 - Oct 2012
    • Al Jaber Engineering W.L.L

      Nov 2016 - Oct 2020
      Construction Manager

      CONSTRUCTION MANAGER at ALJABER ENGINEERING LCC. (JEC)Location: QatarNovember 2016 – PresentProjects:1) NEW ORBITAL HIGHWAY CONTRACT 3 ( NOH3 )Project Budget:6,158,397,379 QR.CLIENT: AHGHALENGINEER/PMC: KBRENGINEERS’ REPRESENTATIVE/SC: AECOMCONTRACTOR/CC: LEIGHTON-ALJABER JVMAIN SUBCONTRACTOR :•Design: Mott Macdonald• bridges Precast Elements: VSL•Asphalt, SB & CBM: Al Jaber-Makhlouf•Earth Works: JEC & Rockfall•Utilities: LCQ•MSE Walls Prod. & Inst.: FreyssinetPROJECT OVERVIEW:•QAR 6,158,397,379 Design and Build project.•31 km of dual 10 lanes with 4 separated truck lanes (total of 7 lanes in each direction).•24 km of 8 lanes Collector, Distributor and Frontage Roads.•Variety of other highway and utility structures.1-Road Works: •55 km of Roads. •9.2 million m3 of Cut•7.6 million m3 of Fill •4.4 million m2 of CBM•2.0 million tons of Asphalt•50,000 m² of MSE Walls2-Structure Works:•5 Junctions including:•4 Main Bridges•3 Ramp Bridges•14 Truck underpasses•11 Bicycle Underpasses3-Utilities: •Protection of 12.6 km QP pipes Using Arches ( techspan® )•Construction of : •87 km of TSE lines •30 km of Drainage lines•6 km of Water lines •284 km of Street Lighting•100 km of Electrical Works•58 km of QAF ducts •64 km of Ooredoo ducts•132 km of ITS ducts •Total utilities work: of 747 kmKEY RESPONSIBILITIES•Organize the site ensuring that work is carried out according contractual specifications with a minimum risk to manpower, equipment’s, and materials.•Adhere to the project specific quality management program and HSE requirements.•Coordinate, control and monitor for sub-contractors activities on site.•Review method statements, risk assessment, lifting plans and Inspection test plans.•Following road pavements (sub base, CBM & Asphalt).•Following Qatar petroleum (QP) pipes protections (constructing Arches above existing pipe lines). عرض أقل

    • JH Construction W.L.L

      Nov 2020 - Jan 2022
      Senior Construction Manager
    • Al Jaber Engineering W.L.L

      Jan 2022 - now
      Senior Construction Manager
  • Licenses & Certifications

    • MMUP, Grade A

      Committee for Accreditation of Engineers & Consultancy Offices", of the Ministry of Municipality & Environment
      Mar 2019