Karim Youssef

Karim Youssef

Intern

Followers of Karim Youssef441 followers
location of Karim YoussefEgypt

Connect with Karim Youssef to Send Message

Connect

Connect with Karim Youssef to Send Message

Connect
  • Timeline

  • About me

    Senior Process Operations Engineer-Suez Oil Company (SUCO), B.Sc., NEBOSH

  • Education

    • La Rose De Lisieux Language School

      1990 - 2004
      General High School Excellent
    • Cairo University

      2004 - 2009
      Bachelor of Science (BSc) Chemical Engineering Good

      الأنشطة والجمعيات:OH+ve

  • Experience

    • Onspec Engineering & Contracting

      Jan 2008 - Jan 2008
      Intern
    • SUCO SUEZ Oil Company

      Nov 2009 - now

      Achievements:• Successfully Participated in a long term plan for improving produced Nitrogen purity (achieved ~ 99% purity on March 2020 after having ~ 84% purity in the past) in Nitrogen generation unit located in Gas Injection-LPG Plant after replacing the unit air dryer and oxygen adsorber beds.• Participated in Gas Injection-LPG Plant Process & Instrumentation Diagrams (P&ID) review process from June 2019 until completion in February 2020 in preparation for Re-HAZOP of the plant as per Wintershall DEA GoS process safety audit recommendation.• Raised a technical modification for changing low pressure tripping setting of Agiba Gas lift Pipeline, the modification passed successfully through SUCO management of change HSE procedure and the modification was deployed successfully on October 2019. • Raised a technical modification for controlling SUCO Zeit Bay Gas lift header pressure through Agiba Gas lift Pipeline pressure controller, the modification passed successfully through SUCO management of change HSE procedure and the pressure controller modification was deployed successfully on October 2019. • Nominated as SUCO representative in Egyptian General Petroleum Corporation (EGPC) committee for studying General Petroleum Company (GPC) gas production alternatives at Ras El-Behar area on December 2018.• Contributed to Gas Injection-LPG Plant partial power supply shift from original power generation system to a temporary diesel fuel generator during power generation system maintenance activities in July 2017.• Participated in Accident Investigation team for the fire accident occurred in Zeit Bay Ras El-Behar Area on February 2017.• Completed a study for the possibility of using an out of service solid desiccant condensate dehydration unit for gas phase dehydration purposes in October 2015.• Issued Environmental emergency procedure for Halon gas, Natural gas & Propane gas accidental release as per recommended in DNV-GL external audit report in August 2015. عرض أقل

      • Senior Process Operations Engineer

        Jul 2010 - now
      • Corrosion Engineer

        Nov 2009 - Jul 2010
  • Licenses & Certifications

    • NEBOSH International General Certificate in Occupational Health and Safety

      NEBOSH
      Jul 2016