Muhammad Alshoura

Muhammad Alshoura

Mechanical Site Engineer

Followers of Muhammad Alshoura3000 followers
location of Muhammad AlshouraEgypt

Connect with Muhammad Alshoura to Send Message

Connect

Connect with Muhammad Alshoura to Send Message

Connect
  • Timeline

  • About me

    HRSG Service Manager at Siemens Energy

  • Education

    • Alabassia Secondary School

      1997 - 2000
    • Alexandria University

      2000 - 2005
      Bachelor of Applied Science (B.A.Sc.) Mechanical Engineering
  • Experience

    • DSD Ferrometalco

      Sept 2005 - Jun 2006
      Mechanical Site Engineer

      EL KUREIMAT II Power Station, Combined Cycle 750 MW Owner: Upper Egypt Electricity Power Company (UEEPC)Main Contractor: SIEMENSConsultant: PGESCO

    • Esaco

      Jul 2006 - Apr 2007
      Mechanical Site Engineer (Piping and Structure)
    • Petromaint

      Jun 2007 - Aug 2008
      Mechanical Site Engineer
    • CMI-FPE LIMITED

      Aug 2008 - Dec 2010
      Boiler Mechanical And Piping Supervisor

      Installation of four vertical HRSGsProjects Data:EL KUREIMAT II Power Station, Combined Cycle 750 MW Owner: Upper Egypt Electricity Power Company (UEEPC)Consultant: PGESCOEL KUREIMAT III Power Station, Combined Cycle 750 MWOwner: Upper Egypt Electricity Power Company (UEEPC)Consultant: PGESCO

    • Kharafi National

      Dec 2010 - Aug 2012
      Mechanical Site Engineer

      Working in the construction of GE Turbines Piping (Frame 9FE) ONbase And OFFbase for total 12 turbines in two sites (Ismailia - West Damietta)Projects Data:- New Damietta Power Station, DLN 1 ConversionGE Gas Turbine (Frame 9E) – DLN 1 ConversionELSHABAB Power Station, Simple Cycle 8 x 125 MWOwner: East Delta Egypt Electricity Power Company (EDEPC)Consultant: PGESCOGE Gas Turbines (Frame 9E)West Damietta Power Station, Simple Cycle 4 x 125 MWOwner: East Delta Egypt Electricity Power Company (EDEPC)Consultant: PGESCOGE Gas Turbines (Frame 9E) Show less

    • STF SPA

      Feb 2013 - Jun 2014
      Mechanical Field Engineer / HRSG Supervisor

      Installation of Six Horizontal HRSGs Projects Data:Giza North Power Station, Combined Cycle 2250 MW Owner: Cairo Electricity Power Company (CEPC)Consultant: PGESCO

    • Alghanim International General Trading & Contracting Co. WLL

      Jul 2014 - Feb 2015
      Piping Engineer

      Piping Installation work for two Siemens gas turbines and for BOP piping of the power plantProjects Data:Subiya Power Station, 2 x 250 MW Owner: Ministry of Electricity and Water (MEW)SIEMENS 4000F Gas Turbines

    • GE Power & Water

      Feb 2015 - Dec 2016

      Project Data:New Damietta Power Station 1 x 250 MW (200D)East Delta Egypt Electricity power Company (EDEPC)Doosan HRSG Design - Horizontal HRSG Projects Data:New Damietta Power Station 4 x 125 MW (9E)East Delta Egypt Electricity Power Company (EDEPC)Fast Track Project

      • HRSG Supervisor

        Sept 2015 - Dec 2016
      • Mechanical Field Engineer / Piping Specialist

        Feb 2015 - Sept 2015
    • Siemens

      Dec 2016 - Jan 2019
      HRSG Technical Field Advisor

      Project Data:Burullus Combined Cycle Power Plant 4800 MWEgyptian Electricity Holding CompanyNEM HRSG Design - Vertical HRSG

    • Siemens Energy

      Feb 2021 - now
      • HRSG Service Engineer

        Jun 2019 - now
      • Lead HRSG Engineer

        Feb 2021 - Oct 2021
  • Licenses & Certifications