Pascal Vogt

Pascal Vogt

Engeneering Responsible / System Engineer

Followers of Pascal Vogt780 followers
location of Pascal VogtUster, Zurich, Switzerland

Connect with Pascal Vogt to Send Message

Connect

Connect with Pascal Vogt to Send Message

Connect
  • Timeline

  • About me

    Künzler & Partners – erste Wahl für Security & Safety, mit Sicherheit ein guter Partner

  • Education

    • Private Hochschule Wirtschaft Zürich

      2007 - 2009
      Master of Business Administration (M.B.A.) Strategisches Management / Business Engineering
    • Eidgenössische Technische Hochschule Zürich

      1992 - 1998
      Master's Degree Maschinenbau

      Activities and Societies: ETH Poly Band, ETH Big Band

  • Experience

    • RUAG Space (former Contraves Space)

      Jan 1998 - Dec 2002
      Engeneering Responsible / System Engineer

      My very first activities after my studies were:- Shadow-Engineering in the project ATV (Automated Transfer Vehicle)- Egineering and Finite Element analyses as well as shadowing of the design activities in several space projects- Execution of the ESA study ACAD (Advanced SAR Antenna Design), i.e. engineering, design and analysis of the antenna structure including its mechanismsAfter this first phase, I was promoted to become the Engineering Responsible in the project ACY 5400 for ARIANE 5. During this time, I participate at the 3rd European Conference for Launcher Technologies in Strassbourg with my presentation "Implementation of high-performance and reliable structural bonded joints” on the example of ACY 5400.Finally I took over the role as lead System Engineer for the project Planck PPLM with a project team of 25 engineers. Show less

    • Sauter, Bachmann AG

      Jan 2003 - Dec 2005

      Starting at Sauter, Bachmann in early 2003, I was the responsible development engineer for all Aerospace proejcts. In this role, I was technically responsible for the Pilatus PC-12 "Flap Actuating System", i.e. the removal of its childhood deseases, further development to a mature system for series production as well as trouble shooting onsite where required.In parallel I was responsible or participated in many proposals, external presentations and lecture, investigations and clarification activities with customers and many audits (ISO 9001, AN 9100, NADCAP).I represented during this time the company in the SAIG (Swiss Aeronautical Industries Group), at international conferences and fairs. Show less

      • Project Manager / System Engineer "Auxilliary Gearbox F414"

        Jun 2004 - Dec 2005
      • Responsible Develompent Engineer for Aerospace Projects

        Jan 2003 - May 2005
    • RUAG Space

      Jan 2006 - Nov 2011

      Becoming the managing director of RUAG Wallisellen, my initial activity was to transfer and integrate this site with its 35 employees to RUAG Space Zürich.After the finalised transfer, RUAG Wallisellen was reformed and renamed into the product line "Experiments & Special Mechanisms".In addition I participated heavily in the ongoing optimisation project "Fit for 2015" at RUAG Space Zürich, which ended with an overall site reorganisation from product lines into profit centers (Business Units).Thus the product line "Experiments & Special Mechanisms" was mostly merged into the new Business Unit "Mechanisms" by end of 2011. Show less During my time as group leader W-EM3, my main responsibilities were the management of the group "Assembly, Integration and Verification of Mechanisms and Instruments", the overall responsibility of the execution of recurring production contracts and project management.One of the main activities during this time was the transfer from the product line "Solar Array Drive Mechanisms (SADM)" from SNECMA in France to Zurich. After having joined RUAG, I took over the overall responsibility of this transfer consisting of knowhow, facilities, prodcuts, customers and many running contracts. Show less

      • Manager Product Line "Experiments & Special Mechanisms"

        Apr 2009 - Nov 2011
      • Group Leader, Project and Product Manager W-EM3

        Jan 2006 - Mar 2009
    • RUAG Space

      May 2013 - Feb 2017

      In the Business Unit "Mechanisms", I was head of Project Management with 10 project managers and a portfolio of ~40 international projects. These projects reached from 20 kEUR up to 15 MEUR each comvers proudction as well as technically highly challenging develoments of space mechanims for the institutional (ESA) and international commercial market.In addition I had the position of the deputy of the General Manager of our Business Unit with 100 employees and an average turnover of 25 MEUR. Show less

      • Head of Project Office Product Unit "Launchers" (Acquisition, Project & Contracts Management)

        Jun 2016 - Feb 2017
      • Head of Sales & Contracts Product Unit "Launchers"

        Jan 2015 - May 2016
      • Head of Project Management and Deputy General Manager in the Business Unit "Mechanisms"

        Jan 2012 - Dec 2014
      • General Manager ad interim Business Unit "Mechanisms"

        May 2013 - Dec 2013
    • Dormakaba

      Mar 2017 - Jan 2020
      Head of Project Management, Business Unit System Integration
    • Künzler & Partners AG

      Jan 2020 - now
      Berater Security & Safety bei der Künzler & Parters AG

      Künzler & Partners ist Ihr Partner für umfassende Beratung und passgenaue Lösungen im Bereich Security & Safety. Profitieren Sie von unserer grossen Erfahrung in allen Bereichen der Sicherheitsbranche - neu auch mit einer Niederlassung im Grossraum Zürich!

  • Licenses & Certifications

    • PADI Rescue Diver

      PADI
  • Volunteer Experience

    • Freelance Columnist for our local monthly journal

      Issued by Seegräbner Bote on Jan 2016
      Seegräbner BoteAssociated with Pascal Vogt
    • Volunteer supporting the Pfuusbus

      Issued by Sozialwerke Pfarrer Sieber on Nov 2016
      Sozialwerke Pfarrer SieberAssociated with Pascal Vogt