Jitendra Pal

Jitendra Pal

SR.ENGG. – Production

Followers of Jitendra Pal212 followers
location of Jitendra PalVadodara, Gujarat, India

Connect with Jitendra Pal to Send Message

Connect

Connect with Jitendra Pal to Send Message

Connect
  • Timeline

  • About me

    Sr. Manager-Industrial Engineering | Operation Excellence | TPM | LSSBB | PMO.

  • Education

    • Govind Ballabh Pant Krishi Evam Praudyogik Vishwavidyalaya

      1998 - 2002
      Bachelor of Technology (B.Tech.) Production Engineering 7.2 CPI
  • Experience

    • LML

      Sept 2002 - Dec 2005
      SR.ENGG. – Production

       Preparing consumable budget, tool budget, rejection budget as well as capital expenditure budget & Ensuring adherence to the pre-set budget. Improved Productivity of Assembly shop by 15%. Successfully introduced and implemented Loss hours monitoring system in the company. Achieved 20% cost savings in Tools and consumables.

    • LUMAX DK AUTO INDUSTRIES LTD - India

      Jan 2006 - Feb 2012
      Asstt. Manager – Industrial Engineering & Production

       Bring the culture of TPM amongst employees through implementation of TPM Policy under the guidance of TPM Consultant from TPM Club of India. Establishing the departmental TPM policies based on the top Management objectives Organize & impart Training for TPM implementation for creating high awareness levels amongst Managers, supervisors & Workmen by formation of TPM Circle Increasing Productivity by eliminating wastes using principles of TPM (Total Preventive Maintenance) Responsible the Kobetsu Kaizen Pillar Activity in Plant. To ensure meeting plant level PQCDSM targets through cell level activities in line with TPM requirement Show less

    • Schaeffler India Ltd.

      Mar 2012 - now

      RFQ to Industrialization. • Designing of Assembly Work station as per MTM & Ergonomics Standards• Manpower Planning based on Man-M/C Utilization Establishing Time Std. for New Product & Process by MTM Technique/ Stop watch/REFA. Product group wise Capacity planning based on market demand & Cycle Time Std. for each operation. Manpower Planning based on Man-M/C Utilization. Providing input data to investment & technology for New Project. Process Establishing for New product & improvement in Existing Show less

      • SR. Manager-Industrial Engineering

        Jan 2022 - now
      • Manager-Industrial Engineering

        Jan 2017 - Dec 2021
      • Dy.Manager-Industrial Engineering

        Mar 2012 - Dec 2017
  • Licenses & Certifications

    • LEAN SIX SIGMA GREEN BELT

      ASCB(E) - Accreditation Service for Certifying Bodies (Europe) Ltd
    • MTM-1

      International MTM Directorate,Germany
      Aug 2018
    • MTM-UAS

      International MTM Directorate,Germany
      Jan 2017
    • Lean Six Sigma Black Belt

      Benchmark Six Sigma
      Apr 2024
      View certificate certificate