James AUNG

James AUNG

Site Engineer

Followers of James AUNG397 followers
location of James AUNGSingapore

Connect with James AUNG to Send Message

Connect

Connect with James AUNG to Send Message

Connect
  • Timeline

  • About me

    Project Manager (Mining) at Penta Ocean & Bachy Soletanche JV

  • Education

    • Yangon Technological University

      1991 - 1996
      Bachelor of Engineering (BE) Civil Engineering

      B Eng Civil

    • National University of Singapore / NUS

      1999 - 2001
      Master of Science (MSc) Geotechnical Engineering

      MSc. Civil Engineering

  • Experience

    • Dagon International Co. Ltd

      Jun 1996 - May 1997
      Site Engineer

      12-Storey Commercial & 24-storey Condominium, Dagon Center Project at Yangon, Myanmar

    • Penta Ocean Constrution Co. Ltd.

      May 1997 - May 2003
      Senior Engineer

      Senior Engineer (C502 – Expo MRT Station & Viaduct Project)Project Engineer (Piling Projects for HDB Term Contracts 41 & 43)

    • Taisei Corporation

      Jun 2003 - May 2007
      Site Manager

      Marymount Underground MRT Station & TunnelProject Contract Sum = S$162,000,000.00 Client: Land Transport Authority (Singapore) Road DiversionPiling Work (Pre-bored King Post/Soldier pile & Sheet pile, Secant pile, Diaphragm wall & Micro Pile)Deep Excavation & Strutting WorksRock Blasting, Shotcrete & Rock BoltReinforced Concrete Works (Permanent Structure)Construction of Slurry TBM Tunnel ShaftSlurry TBM & EPB TBM ExcavationConstruction of 45m deep Escape Shaft & Cross PassagesGrouting & Soil improvement worksRemoval of Temporary Structures, Backfilling & ReinstatementConstruction of Bulk-Head & Head wall for slurry TBM access shaft Show less

    • Kiso-Jiban Consulants Co., Ltd. Singapore

      May 2007 - May 2008
      Senior Resident Engineer

      Proposed Design & Construction of Access 132m deep Shafts and Start-up Galleries of Phase-1 Jurong Rock Cavern at Bayan BasinProject Contract Sum = S$410,000,000.00 Client: Jurong Town Corporation (Singapore)Lead a team of REs and RTOs to supervise the construction and ensure that works are carried out according to approved plans, programs, method statements and specifications.Assist QP(S) in daily site management and advises on quality & safety and also review for BCA submission.Diaphragm Wall ConstructionDeep Excavation & Ring Beam ConstructionRock MappingTAM and Rock GroutingRock Blasting, Shotcrete & Rock BoltInstrumentation & Monitoring Show less

    • Taisei Corporation

      May 2008 - May 2010
      Construction Manager

      (C854 - MRT Circle Line Stage 4&5 Project)Botanic Garden, Caldecott & Farrer StationsProject Contract Sum = S$450,000,000.00 Client: Land Transport Authority (Singapore)CD structural Design coordination and construction of CD permanent structuresCoordination for CSC, BSC ,water & power onInternal over pressure testing (IOPT) for CD StationPrepare construction Schedule plan, material scheduleReviewing of Method Statements, Risk Assessments and Quality control recordsManage and Monitor Progress of WorksAssist SPM in project control and planning Show less

    • GS E&C

      May 2010 - May 2012
      Construction Manager

      Design and Construction of Hillview & Cashew CD Stations Including Slurry Bored Tunnels for Downtown Line Stage 2 (LTA – C913)Manage and execute overall project planning and site supervision teams in order to complete the projects with most efficient, cost effective, safely and timely manner.Prepare and review construction Schedules, procurements, manpower and resourcesReviewing of Method Statement & Quality control recordsMonitor the Progress of Work Design CoordinationEnsure Safety procedures are implementedEnsure the requirements of the client and relevant Authorities Services Utility Diversion Canal Diversion Road DiversionDeep Excavation & Strutting WorksCD permanent Structure Tunnel Launching Shaft ConstructionTunnel Mining, Ring Building & GroutingRock BlastingInstrumentation & MonitoringA series of 5.8m Diameter twin bored tunnels approximately 2.2 km length with Slurry TBMs (Kawasaki) Show less

    • Parsons Brinckerhoff

      Jul 2012 - Apr 2013
      Senior Resident Engineer

      Construction and Completion of Upper Changi (CD) Station and Tunnels for Downtown Line Stage 3 (LTA – C923)Lead a team of REs and RTOs to supervise the construction and ensure that works are carried out according to approved plans, programs, method statements and specifications.Assist QP(S) in daily site management and advises on quality & safety and also review for BCA submission.Reviewing of Method Statement & Risk AssessmentQuality Assurance & Quality ControlMonitoring & submission of Progress of Work DoneDesign CoordinationSafety & Environmental issuesEnsure the requirements of the client and relevant AuthoritiesConstruction of underground Civil Defence StationServices Utility DiversionRoad DiversionDiagram Wall Construction for Station & Launching ShaftPiling Work (Pre-bored King Post, Sheet pile, Secant Bored pile)Traffic & Construction Decking Works Instrumentation & MonitoringA series of 5.8m Diameter twin bored tunnels approximately 0.5 km length with EPB TBM (Herrenknecht) Show less

    • KTC Civil Engineering & Construction

      May 2013 - Mar 2014
      Project Manager
    • Soletanche Bachy

      Mar 2014 - now
      Project Manager
    • Penta Ocean & Bachy Soletanche JV

      Jun 2017 - now
      Project Manager (Mining)
  • Licenses & Certifications

    • Professional Engineer PE (Construction) MM

      Myanmar Engineering Council