Ahmed Alama

Ahmed Alama

Followers of Ahmed Alama165 followers
location of Ahmed AlamaSaudi Arabia

Connect with Ahmed Alama to Send Message

Connect

Connect with Ahmed Alama to Send Message

Connect
  • Timeline

  • About me

    Site Project Manager (PMP) at Al-Toukhi Company for Industry, Trading and Construction

  • Education

    • Al-Azhar University

      1997 - 2001
      Bachelor’s Degree Electrical and Electronics Engineering very good - project excellent

  • Experience

    • Al-Toukhi Company for Industry, Trading and Construction

      Aug 2007 - now

      AL-KHALDIA 380 /110/13.8 KV BSPResponsible to manage, Supervise and Coordinate all testing and Commissioning &Energize EHV AL-KHALDIA 380/110/13.8 kv BSPMADAIN 380/132/33/13.8 kv BSPResponsible to manage, Supervise and Coordinate all testing and Commissioning &Energize EHV MADAIN 380/132/33/13.8 kv BSPMAKAH NORTH 380/110/13.8 PROJECTResponsible to manage, Supervise and Coordinate all testing and Commissioning &Energize EHV MKN 380/110/13.8 kv BSP Apply modification of protection panels &connected with existing protection/control (BB-BF-LCC….)panels perform scheme check for 380kv &110 KV OHL/UGC at the the following ss: 132/13.8KV -WADEE JALEEL )( 380 /110-/13.8KV HVM )( 380 KV SHOAIB)(- 380 /110-/13.8KV -KMT )( 380 /110-/13.8KV –HVT)  110/13.8 KV TANEAM )( 110/13.8 KV MPS)( 110/13.8 KV HVM)( 110/13.8 KV ZAHRA)( 110/13.8 KV NUZHA) Design coordination and responsible to manage the meeting with SEC /supplier /design for protecting &control for MKN 380/110/13.8 KV BSP.From 2012-2012380/110/13.8 kv HVT BSP: existing protection/control (BB-BF-LCC….)panels for 380/110/13.8 KV POWER TRANSFORMER and Responsible to manage, supervise for installation and coordinate all testing and commissioning &energize s/s ONLY WITHIN 45 DAYS. 380/110/13.8 kv HVT BSP - POWER TRANSFORMER perform stability test (DIFF&REF), scheme check , closed ;loop test enrgization and on load measurement test  Energize for 380 KV OHL HVT/SSID LINE 1&LINE DIFF STABILITY TEST Energize for 380 KV OHL HVT/SSID LINE 2&LINE DIFF STABILITY TEST Show less o 110/13.8 kv TANEAM S/S (MAKAH AL MUKRMAH):• Apply modification of protection panels, 110 kv LCC PANELS . 13,8 kv • Overall interlock modification and testing , Power transformer stability test (DIFF&REF), Final setting• Energize for TANEAM S/So 380/110/13.8 KV HVM S/S : (MAKAH AL MUKRMAH)• AD03-110 KV :Apply modification of protection panels &connected with existing protection/control (BB-BF-LCC….) and perform scheme check • LINE DIFF STABILITY TEST o MKAH POWER PLANT:• AD16 :Apply modification of protection panels &connected with existing protection/control (BB-BF-LCC….)panels for OHL 110 kv TANEEM –AD05/ MPS-AD16 and perform scheme check, BB stability test , Energize for feedero 110/13.8 kv AL SHOQIA S/S (MAKAH AL MUKRMAH)• Final setting for numerical relays line diff. relays 7SA522, 7SD522• LINE STABILITY TEST for RASFHA/SHOQIA line o 110/13.8 kv AL RASIFA S/S: (MAKAH AL MUKRMAH)• Apply modification of protection panels &connected with existing protection/control (BB-BF-LCC….)panels for OHL 110 kv AL RASIFA/ AL SHOQIA LINE and perform scheme check• LINE STABILITY TEST for RASFHA/SHOQIA line o 110/13.8 kv AL MASFLAH S/S (MAKAH AL MUKRMAH)• Apply modification of protection panels &connected with existing protection/control (BB-BF-LCC….)panels for OHL 110 kv AL RASIFA/ AL SHOQIA LINE and perform scheme check• BB STABILITY TEST Show less

      • Site Project Manager

        Feb 2017 - now
      • Manager for protection &telecommunication execution works s/s in western &south region

        Jan 2016 - now
      • Senior Protection Engr

        Aug 2007 - now
      • Protection Engr/Desing Coordinator

        Jan 2009 - May 2010
      • Protection Engr

        Aug 2007 - Jan 2009
  • Licenses & Certifications

    • Project Management Professional (PMP)®

      Project Management Institute
      Dec 2021
      View certificate certificate