Louise Spencer

Louise Spencer

Cadet Engineer

Followers of Louise Spencer503 followers
location of Louise SpencerGreater Sydney Area

Connect with Louise Spencer to Send Message

Connect

Connect with Louise Spencer to Send Message

Connect
  • Timeline

  • About me

    Manager Investment Review at Transport for NSW

  • Education

    • QUT (Queensland University of Technology)

      2021 - 2022
      Graduate Certificate Public Sector Management Program (Business)
    • University of Sydney

      1988 - 1991
      Bachelor of Engineering (BE) Mechanical Engineering Honours Class II Division I

      Activities and Societies: Secretary Mechanical Engineering Undergraduate Society

    • Our Lady of Mercy College Parramatta

      1982 - 1987
      HSC
  • Experience

    • Electricity Commission of NSW

      Mar 1988 - Dec 1991
      Cadet Engineer

      During university vacations, completed three x three month duration industrial experience sessions at NSW coal fired power stations including Liddell and Vales Point.

    • Pacific Power

      Jan 1992 - Dec 1995

      Administered contracts and completed technical investigations into boiler projects for clients from coal fired power stations. Determined client's requirements, prepared specification, analysed tenders and awarded contract and administered contract for the overhaul of boiler sootblowers at Wallerawang power station. Completed sootblower optimisation testing.Administered contracts for balance of plant of the Plasma Ignition project at Munmorah power station including nitrogen vessel, cooling water and compressed air systems installation. Prepared specifications, QA documentation, coordinated drawing production and preparation of operation and maintenance manuals. Prepared commissioning procedures and assisted with commissioning. Show less Responsible for the on-site administration of the contracts for the supply and installation of the Mt Piper power station main circulating water pumps, auxiliary cooling water pumps and fire protection.Collected and analysed vibration data on the cooling water pumps and established a condition monitoring system to resolve outstanding performance problems with the pumps.Rostered on as a duty engineer in the unit control room to co-ordinate commissioning activities leading to initial synchronisation of Mt Piper units 1 and 2. Show less

      • Engineering Consultant

        Jan 1994 - Dec 1995
      • Professional Engineer

        Jan 1993 - Dec 1993
      • Professional Engineer

        Jan 1992 - Dec 1992
    • Rolls Royce Industrial Power Systems

      Jan 1996 - Dec 1996
      Contracts Engineer

      Prepared steam turbine tenders in response to client's enquiries for the refurbishment and upgrade of major components including HP and LP steam turbine spindles, main exciters, governors, journal and thrust bearings. Prepared tenders for the supply of new components such as blading, valves and steam chests. Managed contracts from receipt of order to warranty expiry. Liaised with clients and their agents, prepared instructions for the factory, communicated with the design and drawing office to expedite timely completion of the work. Coordinated dispatch from the factory and billing. Show less

    • Pacific Power

      Jan 1997 - Feb 1998
      Engineering Consultant

      Administered contracts and completed technical investigations into boiler projects for clients from coal fired power stations. Completed an overhaul of sootblowers at Wallerawang power station.Project managed drawing activities for the supply of new and upgraded monorails on the boiler and deaerator at Mt Piper power station.Investigated methods for reducing mill warm-through times at Bayswater power station to minimise loss of production from boiler trips on return to service.

    • Transfield Power Projects

      Mar 1998 - Jul 1999
      Project Engineer

      I worked in a business development role responding to customer bids for the provision of combined cycle and cogeneration power stations. This provided me with robust capex estimating skills and awareness of the commercial aspects of tendering for large infrastructure projects. I was responsible for the preparation of tenders for the supply of heat recovery steam generators (HRSGs) to recover heat from gas turbine exhaust streams and turnkey power projects. Conducted modeling of combined cycle and cogeneration plants, assisted with selection of plant and prepared request for quotations and tender documents. Show less

    • Independent Pricing and Regulatory Tribunal

      Apr 2006 - Jun 2007
      Analyst in GGAS

      I was seconded to IPART, working as an analyst in the Greenhouse House Gas Reduction Scheme (GGAS), one of the world's first carbon emission trading schemes. In this role I reviewed applications for accreditation under GGAS to ensure the nominated projects complied with the requirements of the scheme. I also provided technical support on the development of a range of guidance documents for GGAS.

    • WorleyParsons

      Oct 2008 - Jul 2013

      Through my work as a consultant with WorleyParsons, I have in-depth experience in the end-to- end delivery of projects for clients. I have proven ability in the front-end assessment of opportunities for customers, evaluating strategic alignment, reviewing financial performance, making recommendations on the next stages for the customer to pursue and preparing business cases and feasibility studies. I have experience in stakeholder engagement, risk assessment, project execution and close-out.I was responsible for the scoping and delivery of power and energy projects for government and private sector customers. Projects included the analysis of opportunities for recovery of energy from biosolids, assessment of renewable energy generation opportunities including wind and solar and the vendor due diligence review of NSW electricity generators.During the period 2000 and 2003, I evaluated the technical and commercial feasibility of implementing gas fuelled cogeneration units at a series of sites including a hospital, laundry, university, sewage treatment plant, industrial and commercial facilities. These studies involved site inspections and desktop analysis and were completed for the Sustainable Energy Development Authority of NSW (SEDA). Show less In 2008, I was appointed Sydney Water Energy Partnership programme manager for WorleyParsons. In this position, I consistently achieved high results in:- Strategic planning of business improvement opportunities - Identification and assessment of opportunities based on cost, benefits and risk - Generation and selection of alternative options - Preparation of business cases to support an application for capital funding- Stakeholder engagement concerning new business opportunities and overcoming resistance to change In this role, I managed a portfolio of energy cost saving projects from investigative studies into energy efficiency improvements such as reducing ventilation fan electricity use and improving power factor correction. I also managed capital upgrade projects to existing cogeneration plants (value $1.5-$2m each). Show less

      • Senior Mechanical Engineer

        Jul 1999 - Jul 2013
      • Sydney Water Energy Partnership Programme Manager

        Oct 2008 - Dec 2012
    • Transport for NSW

      Jan 2014 - now

      Provided investment advice to project teams and secretariat services to Transport's Finance and Investment Committee. Contributed to improving overall customer experience by providing assistance and support in the procurement and performance of heavy rail transport and heritage asset services.

      • Manager Investment Review, Freight

        Sept 2021 - now
      • Benefits Realisation Management Analyst

        Oct 2017 - Sept 2021
      • A/g Principal Analyst - Investment Advice

        Jun 2019 - Jan 2020
      • A/Principal Manager Rail Services Contracts

        May 2017 - Oct 2017
      • Senior Contract & Performance Officer

        Jan 2014 - May 2017
  • Licenses & Certifications

    • Managing Successful Programmes (MSP) Foundation Certificate

      AXELOS Global Best Practice
      Jun 2018
    • Project Management Professional (PMP)

      Project Management Institute
      Dec 2013
    • HLTAID11 Provide First Aid

      CPR FirstAid
      Nov 2022
  • Volunteer Experience

    • District Manager

      Issued by Girl Guides NSW & ACT on Feb 2010
      Girl Guides NSW & ACTAssociated with Louise Spencer