Muhammad Imran

Muhammad Imran

Technical Management Trainee

Followers of Muhammad Imran555 followers
location of Muhammad ImranFaisalabad, Punjab, Pakistan

Connect with Muhammad Imran to Send Message

Connect

Connect with Muhammad Imran to Send Message

Connect
  • Timeline

  • About me

    Chief Operator At Pachem Global Pvt Ltd Faisalabad

  • Education

    • Punjab board of technical education Lahore

      2005 - 2008
      Diploma Of Associate Engineering Chemical Chemical Technology/Technician 1st divison
    • Govt.Islamia high school multan

      2004 - 2005
      Matric Science
    • Bahauddin Zakariya University

      2010 - 2012
      B-TECH Pass Chemical Engineering B
  • Experience

    • Engro Foods Limited

      Aug 2009 - Dec 2011
      Technical Management Trainee

      Operations:Fire tube boiler having capacity 15 ton/h Package type Reverse osmosis (R.O) plant double pass having capacity 30 ton/hWater softening plant Zeolite process.Air Compressor Oil Free zero class air having pressure 8 barg Water Tube Boiler having capacity 30 ton/h @ 65 barg 4MW extraction, condensing steam turbine for 4MW generator, speed 9077 rpm, Steam Consumption 25T/Hr. Inlet Steam Pressure 60Kg/cm2, Inlet Steam Temperature 450 0C. Erection & Commissioning: I have experience of Erection and Commissioning of Husk Fired Steam Boiler,4MW extraction condensing steam turbine, RO, Mixed Bed, ETP, CT, Fire fighting Equipments, Air Compressors, Fire Hydrant system,Pakage Type Boiler,Diesl, Unloading system etc. Special achievements;I participated from operational team to Design review of High pressure steam Boiler with DESCON, TIE, HMC and project team. Show less

    • Rupali Polyester Ltd

      Jan 2012 - Feb 2013
      Plant Operator
    • Nimir Chemicals Pakistan Limited

      Feb 2013 - Aug 2020
      Production Officer

      Professional Experience:Present Experience: 11-02-2013 to 07-08-2020As a Production Officer Nimir chemical Lahore Pakistan a Petrochemical (Aromatics ) Production & Refining complex. Process Summary:Partial oxidation of Ortho Xylene using BASF catalyst in 2 Vertical Fixbed Tubular Reactors having 5028 and 4641 tubes is produced Phthalic Anhydride as main product and Maliec Anhydride as Byproduct.Plant has a production capacity of 25,000 tons p/a Phthalic Anhydride and 720 tons p/a Maliec Anhydride.The reaction is an exothermic one and heat produced is recovered by a Salt bath circulation system in reactors and then used to produced Steam.Phthalic Anhydride is purified by a contineous Vacuum Distillation in two columns and finally stored in the form of Flakes.Monitor and Control the plants using the DCS systems and Centum CS3000 by YOKOGAWA Japan.Work on following Sections.1 :PHTHALIC ANHYDRIDE PLANT 2 :Malic Anhydride 3: Di-Octyle Phthalate 4: Utility Plant Show less

    • Pachem Global Pvt Ltd M3 Industrial City Faisalabad

      Aug 2020 - now
      Chief Operator

      Manufacturing of Phthalic Anhydride

  • Licenses & Certifications

    • C Class Boiler Engineering

      Punjab Board of Boiler Engineers
      Sept 2014