Vasantharajan K

Vasantharajan K

Instrumentation Engineer

Followers of Vasantharajan K611 followers
location of Vasantharajan KCuddalore, Tamil Nadu, India

Connect with Vasantharajan K to Send Message

Connect

Connect with Vasantharajan K to Send Message

Connect
  • Timeline

  • About me

    Instrumentation Engineer at Technip Energies

  • Education

    • Anna University Chennai

      2009 - 2013
      Bachelor of Engineering - BE Electronics & Instrumentation Engineering
  • Experience

    • Ranga Controls

      Sept 2013 - Mar 2019
      Instrumentation Engineer

      1) Preparation of Datasheets for Analyzers and its associated Electrical andInstrument items2) Preparation of Instrument wiring.3) Preparation of Instrument Cable List.4) Preparation of Piping & Instrument Drawing (P&ID).5) Preparation of Hook-up and Material selection (MTO) of Pipe and tube fittings.6) Preparation of IO List.7) Preparation of Analyzer List.8) Preparation of Sub-Vendor document List.9) Preparation of SLD, BOM and GA.10) Vendor Drawing Review.11) Selection of Instrument Items... Show less

    • MANNAI TECHNICAL SERVICES INDIA PRIVATE LIMITED

      Apr 2019 - Jul 2019
      Project Engineer (Instrumentation)

       Preparation of Instrument Specifications (Datasheet) for all typical ProcessApplications (Flow, Temperature, Pressure, Level etc.). Review of P & IDs and responsible for all Instrument types, connection sizes andsymbols. Preparation of Junction Box Wiring Diagram and Instrumentation Loop Diagram. Preparation of Instrument Installation detail/ Hook up drawings. Preparation of bulk MTO from HOOK-UPS. Preparation of Control System Architecture. Preparation of specification for Control System (PLC). Preparation of specification for instrument accessories and fittings like tube fittings,junction boxes, cables and cable glands .etc Review of Instrumentation Cable Tray Routing layout. Review of Instrumentation Vendor documents. Preparation of TBE. Coordinating with client in-order to obtain a comprehensive understanding of clientrequirements. Participation in client meetings for project related discussions. Preparation of specifications for F&G items. Preparation of field markups for as-built deliverables. Scheduling of project related activities and preparation of reports. Preparation of datasheets for analyzer shelter / cabinet and its associated ancillaries. Preparation of cable schedule. Preparation of SLD. Good knowledge on codes and standards (IS/IEC/IEEE/ISA/ASME/ANSI) Show less

    • L & T Chiyoda Ltd

      Aug 2019 - May 2023
      Instrumentation Engineer

       Reviewing of P & IDs and responsible for all Instrument types, connection sizes andsymbols. Preparation of Instrument Index. Preparation of Material Requisition (MR) for various field instruments. MR updation based on the Client Comments. Preparation of Instrument Specifications (Datasheet) for all typical ProcessApplications (Flow, Temperature, Pressure, Level etc.). Preparation of Instrument Specifications (Datasheet) for Fire and Gas Devices. Discussing with the various department to get the required detail.Page 2 of 4 Reviewing of Vendor Offers. And prepare the TQ points based on the Vendor Offer. Technical clarification, designing and coordination with vendors and other sub vendors Attending the Technical Meetings (Pre-Order) with various Vendors. Preparation of Technical Bid Evaluation (TBE). Preparation of MOM points based on discussed during Design Review Meeting (PostOrder). Preparing drawings and document deliverables for assigned projects. Preparation of Purchase Requisition (PR) for Client Approval. Coordinating with client in-order to obtain a comprehensive understanding of clientrequirements. And respond to the technical clarification from client if any. Review of Vendor documents (P&ID, Sizing Calculation, Datasheets etc) in line withstandards and client requirements. And giving the Document Approval to proceedfurther. Highlight to management wherever there is Cost Implication on client comments /additions. Following-up with client and Vendors document control. Scheduling of project related activities and preparation of reports. Show less

    • TechnipFMC

      Mar 2023 - now
      Sr.Instrumentation Engineer
  • Licenses & Certifications

    • Smart plant Instrumentation (INTools)

      Techindeed Engineering Services
      Jan 2016