
Taewon Hwang
Quality Controll & Construction Engineer

Connect with Taewon Hwang to Send Message
Connect
Connect with Taewon Hwang to Send Message
ConnectTimeline
About me
Environmental Manager(EVM) & Civil Eng. of US Army Training Center in GUAM.
Education

Young-nam Univ.
1990 - 1997Bachelor's degree Civil Engineering
Dalsung High School
1987 - 1990
Experience

Daelim Industrial Co., Ltd.
May 1997 - Nov 2004Quality Controll & Construction EngineerAs an Entry-level Civil Engineer, I performed duties such as Quality Control, Construction Management, Construction Estimation, etc. Below are the construction projects that I participated in:1. Land Development and Utility Installation and National Highway Constructions: Carried out construction management duties in Paju New City LDUI Project, Wonju City Bypass Construction Project, etc. For ground stabilization, I used methods such as CIP (Cast in Placed Pile) Method, TOP-Base Method, Impermeable Wall Method, Paper Drain Method, etc.: Performed duties including schedule management, Construction Cost Management, etc.2. Construction of Seohaean Highway : As a Quality Control/Construction engineer, I performed QC duties for the construction of Steel Box Girder bridge construction. Considering Soft Soil Ground, I stabilized the ground by using Well Foundation and driving steel pipe pile. In order to prevent corrosion of the pile, Catholic Protection Method was performed.3. Expansion work of Yeongdong Highway: As a Quality Controller of the FCM (Free Cantilever Method) which is one of the Bridge Construction Methods, I installed a 950m-long superstructure “Hoengseong Bridge” with ‘VSL Korea’. I also directed the overall construction of a 98m-long lower bridge pier of Hoengseong Bridge using Slip Form Method which was the best pier at the time. Show less

Hyundai Asan
Jun 2009 - Mar 2014As a Project Manager (PM) of international donation project in Zimbabwe Africa, Performed overall management. Detail work scope :1) Project management Solar Water Heating Systems at the 2 places (HIT, UBH)2) Estimating and management of system installation cost.3) Selection of material supplier and installation technicians in Korea and Zimbabwe.4) Construction inspection and commissioning of system.5) Educating Zimbabwe local technician for maintenance.6) Feasible study for installation of Zambia & Botswana PV installation project. For 2 years of installation period, it was very challenging for supplying acceptable materials and well trained technician, but I finished the project successfully and still recorded one of successful project of KOICA, and when I visit Zimbabwe 3month ago (Sep. 2018) the system still 100% functional with no facility defections Show less I worked at Hyundai Asan Co., Ltd. for 10 years. The main business Hyundai Asan Co., Ltd. deals with is economic cooperation with North Korea. From 2004 to 2009, I was directly sent to Gaeseong Industrial Complex for completing below project. 1. Construction of Special Bridges in Gaeseong Industrial Complex(GIC) (Jan. 7, 2008 – June 27, 2009 / Civil and Quality Engineer) : In this project the assigned duty was to installing approximately 75m of steel structure bridge which was produced in South Korea. On the construction site, I examined the quality of steel structure. About the specific duties, bolts’ clamping pressure examination, painting inspection, steel plate dimension, internal and external cracking examination. As a result, I could successfully complete the construction project safely with high quality. 2. Construction of Water Infiltration Plant and Sewage Cleaning Plant in GIC(Feb. 1, 2006 – July 28, 2007 / Civil and Quality Engineer) : As a Civil Technical Manager and Quality Controller, I was responsible for the duties related to the water infiltration process, including foundation of building, septic tank and a filtration tank. At the waste water-disposal plant, I successfully installed the building foundation by applying Sheet Pile and pumping drainage in order to control Boiling Effect on Sand Soil.3. GIC Site Construction and Waste Reclamation Facility(Dec. 27, 2005 – Nov. 9, 2009 / Civil and Quality Engineer) : As a Civil Construction Technical Manager, I performed Leveling Civil Construction on approximately 400 ha of land which is classified as the 1st staged land in GIC. This project involved the cutting-the-ground construction by using Blasting Method mainly. For the banking-up construction, we stabilized the several parts of soft grounds by using Rock Embankment Method, Soil Cement Method, etc. Lastly, I performed quality control duties for the construction of asphalt pavement. Show less
Project Manage of Zimbabwe Solar Water Heating System Installation Project
Mar 2012 - Mar 2014Civil Design Engineer / Feasible study and Design of North Korea SOC construction project
Jun 2009 - Mar 2013Civil Engineer in North Korea (Gaesung Inderstrial Complex site & etc.)
Nov 2004 - Jun 2012Feasible study and Design of North Korea SOC construction project. Civil Design Engineer
Jun 2009 - Aug 2010
.webp)
Hyundai Development Company (현대산업개발)
Mar 2014 - Apr 2018Quality Controller (QC) of Camp Humphreys FED YRP SiteCivil Quality Controller (QC) at the construction site of the One Stop Processing Center located in US ARMY Camp Humphreys, Pyeong-taek, South Korea.Detail work scope :The project is for Renewing Old town base and Extending to New Town base. Since the Old town base was 60 years old, Civil work scope including replace existing and abandoned underground utilities without any records of location of utilities. 1) As a Civil Superintendent, processed replacement of underground Gas tank (25ton) and other related utilities - Water, Sewer, Fire etc.)2) Quality Management based upon US ARMY Quality Assurance Procedure (Preparatory Inspection, Initial Inspection, and Follow up Inspection) in accordance with FED Regulations. Show less

Hanmi Enc. (http://hanmienc.com/)
Jun 2018 - Apr 2019Civil Engineer of Renewable Energy Project on civil works (Design & Estimation)As a Technical PM of EPC company, participated Several Solar PV project☞ Project Managing From the start of project to the finish of installation ( Prospective land search & Profit analysis, Negotiation with Land owner, Achieving Government and KEPCO approvals, Site survey, Solar panel layout design, Installation management of solar panel, Inverter and ESS)☞ Participated Site : Yeongcheon (2Mw+ESS 3Mw), Mungyeong (1Mw), Detail work scope :1) Project Managing From the start of project to the finish of installation2) Solar panel Lay out design(using programming tools, PV Syst or Sketch-up Scallion)3) Designing PV system based on cost efficiency (Solar panel layout design, panel foundation design and frame design, storm water drainage design etc.)4) Estimating the Project Cost (Analysis Solar PV system materials and ESS, Manpower inputting and other expenses)5) Installation Management and inspection for optimum Quality, Schedule, and Safety) Show less

Modern International, inc.
May 2019 - Oct 2020Civil EngineerAs a QC of the EPC company, participated the Project “Utility Upgrade Building 150 United States Naval Communications Station Finegayan, Guam” ☞ The work scope is renovation of existing external power supplying Building and Replacement of underground utilities – water, sewer and power Detail work scope : Performing QC & Superintendent duty on renovation works of External Power Supplying Building (Replacing Existing water line, Sewer line & Electric Duct bank and cable together with Restructuring wall & column, Roof water proof,) Show less

Core Tech International
Oct 2020 - Sept 2022QCM & Civil Eng. of US Airforce facility Project at Anderson Airbase in GUAM.As a QCM & Civil Eng., Participated Project “Renovate/Expand Hangar 6, B18110” – Project budget : $19Mil.☞ The work scope is Extension of existing Hangar facility for Flight Jets, Building New Hanger structure, Underground utilities, HVAC, Fire protection, Electric, Landscaping & Paving.Detail work scope :1) As QCM, Managed Quality Controlling & Assurance activities for Overall project, Revise or Updating Design, QC plan, Project scheduling & Coordinating with GOV.2) As Civil Eng, Install of Various underground utilities (Water, Strom, Sewer, Fire & Elec.), Building foundation, Soil banking and grading, Paving & Environment facilities. Show less

Core Tech International - GPDB JV
Sept 2022 - nowEnvironmental Manager(EVM) & Civil Eng. of US Army Training Center in GUAM.As a EVM & Civil Eng., Participated a Project “NATIONAL GUARD READINESS CENTER” – Project budget : $33Mil.☞ The work scope is Building a Training center for US Army. Including Building structures, Underground utilities, Foundation work, Landscaping & paving. Detail work scope :1) As EVM, Controlling Environmental Hazards, Erosion and Sedimentation Control, Petroleum, Oils, and Lubricants Management & Spill Response, Waste management followed by GUAM EPA guidance and Providing awareness training.2) As Civil Eng, Install of Various underground utilities (Water, Strom, Sewer, Fire & Elec.), Building foundation, Soil banking and grading, Paving & Environment facilities. Show less
Licenses & Certifications

USA permanent residency
U.S. Department of State's National Visa Center (NVC)Jan 2019- View certificate

Fundamentals of Engineering (FE)
NCEESDec 2017
Languages
- koKorean
- enEnglish
Recommendations

Saira taj
Virtual Assistant | Professional Transcriber | Social Media manager | Executive resume writerGujranwala, Punjab, Pakistan
Nikhil shinde
SAP S/4 Hana Order to cash Architect at Volkswagen Group Technology Solutions IndiaPune, Maharashtra, India
Elizabeth irving
First officer at Piedmont airlinesUnited States
Rohan lohia
Research Analyst at ZIGRAMGurgaon, Haryana, India
Jonathan johnson
Technical Assistant at The Garland Company, Inc.Gresham, Oregon, United States
Mahek gandhi
Brand sourcing & styling executiveMumbai, Maharashtra, India
Meg febel
Yoga Instructor at Yoga By DegreesHinsdale, Illinois, United States
Thomy prastomo
Project Manager at PT Multi Kreasi EngineeringIndonesia
Rathish seenu
Technical Manager at HCL TechnologiesChennai, Tamil Nadu, India
Andrea hermann
Project Manager- Advertising, Marketing ExcellenceMontreal, Quebec, Canada
Henry antonio rodriguez lara
HSE Engineer, BOSIET/EBS , OGUK, Onshore Oil and Gas Operations, Safety Officer Shipyards, Master's ...Greater Santa Cruz de Tenerife Metropolitan Area
Līga šuktere
Restaurant Manager at 36.line Grill RestaurantRiga, Latvia
Vaishnavi vadlamani
Software Development Manager at AMAZON DEVELOPMENT CENTRE (INDIA) PRIVATE LIMITEDBengaluru, Karnataka, India
Danielle reed
Chief Science Officer and Member -- Monell Chemical Senses CenterPhiladelphia, Pennsylvania, United States
Shrey saxena
Software Development Engineer @Nokia | Kubernetes | Docker | Python | Shell | Linux | OpenStackBengaluru, Karnataka, India
Daniel bajada, cpa
Audit Supervisor at PwC Acceleration Center ManilaCentral Luzon, Philippines
Maylene lansangan
R.N. | Virtual Assistant - Call Handler / Lettings and Property Repairs Management | Canva WizAngeles, Central Luzon, Philippines
Rajesh kumar
Maintenance and Service Engineering | Electronic Component sourcing | Obsolescence management | Proj...Coimbatore, Tamil Nadu, India
Don v nielsen
Associate Developer at Roehl TransportMarshfield, Wisconsin, United States
Rick harris
Real Estate Professional | Regional Sales Director | Driven To Exceed Expectations | VeteranScottsdale, Arizona, United States
...