Dr. Ranganadhan T. B., MSc (CPM), M.ASCE, MQSi, PhD.

Dr. Ranganadhan T. B., MSc (CPM), M.ASCE, MQSi, PhD.

OVERSEER

Followers of Dr. Ranganadhan T. B., MSc (CPM), M.ASCE, MQSi, PhD.346 followers
location of Dr. Ranganadhan T. B., MSc (CPM), M.ASCE, MQSi, PhD.الدوحة قطر

Connect with Dr. Ranganadhan T. B., MSc (CPM), M.ASCE, MQSi, PhD. to Send Message

Connect

Connect with Dr. Ranganadhan T. B., MSc (CPM), M.ASCE, MQSi, PhD. to Send Message

Connect
  • Timeline

  • About me

    MSc. at University of Wolverhampton

  • Education

    • Carmel Polytechnic College

      1977 - 1980
      Civil Engineering Diploma First Class
    • Atlantic International University

      2016 - 2020
      Doctor of Philosophy - PhD Civil Engineering GPA=3.96
    • University of Wolverhampton

      2013 - 2016
      MSc. (Construction Project Management) Merit
  • Experience

    • KERALA MINERALS & METALS LTD.

      Jun 1981 - Dec 1981
      OVERSEER

      Responsibilities:Site supervision and setting out survey of New Factory under Construction.

    • INDIAN RAILWAY

      Feb 1982 - Aug 1983
      JUNIOR ENGINEER

      Responsibilities:Involved in the Survey and Construction of Ernakulam – Alleppy Costal Railway Project.

    • BHAGEERATHA ENGINEERING LTD.

      Sept 1983 - May 1989

      Responsibilities:Controlling site survey of Koraput – Rayagada Railway Project including curved Tunnels and Bridges etc.In charge of construction activities. Responsibilities:Establishment of survey control Along the route, Railway alignment survey, construction survey for earthwork, bridges and culverts etc. Supervision of construction activities.Major Projects Accomplished in Iraq.• Mussayeb to Samawa Railway project.• Al Muthenna Branch Line Project.• Al Muthenna Cement Handling System Project.

      • SITE ENGINEER (Survey & Construction)

        Oct 1987 - May 1989
      • SUPERVISOR

        Sept 1983 - Oct 1987
    • FUGRO MIDDLE EAST LTD.

      Jun 1989 - Dec 1996
      CHIEF SURVEYOR (Head of Survey Department)

      Responsibilities:Managing field operations, Processing field data and preparing Survey Reports.

    • EMIRATES NORTECH SURVEYS INC. LLC.

      Jan 1997 - Feb 2001
      CHIEF SURVEY ENGINEER / ASSISTANT MANAGER

      Responsibilities:Managing field and office operations, Processing GPS & Total Station field data and preparing Survey Reports.

    • ARD TOPOGRAPHICS LLC. (Survey Company)

      Mar 2001 - Sept 2004
      OPERATIONS MANAGER

      Responsibilities:Managing site and office operations, Processing GPS & Total Station field data and preparing Survey Reports.

    • PARSONS INTERNATIONAL LIMITED

      Dec 2004 - Apr 2010
      CHIEF SURVEYOR (Head of Survey, Cad and As-built department)

      Project:Salwa International Highway Project Phase-1Responsibilities:Dealing with 13 Contractors with the assistance of 12 field surveyors and 2 – 4 cad operators. Managing the complete day to day field survey checking of all construction activities, required modification on design drawings as per site conditions, checking and approving Shop drawings, checking and approving As-Built Survey drawings and As-Built Record drawings etc.Project included the following:Road work:- 80km. Highway (4 lane dual carriageway) from Industrial Interchange to Bu-Samra, Frontage roads, Cross roads, Loops, Ramps, etc.Structural works:- 10 Nos. Interchanges, 3 Nos. Major Camel crossings, 13 Nos. Major QP Culverts, 3 Nos. major TSE culverts etc.Utility works:- 7km. 500 dia. Sewer line, 15km. 600 dia. Water line, 1.20km. 1200 dia. Water line, 50km Q-tel line, ducts, future crossings, chambers, valves etc.HV Electrical works:- 120kv. Line diversion, 66kv lines, 33kv lines,11kv lines, Construction of indoor and outdoor Sub-stations, etc.Road Lighting works:- 770 Nos. 30m. High Mast, 1550 Nos. 14m. High Mast, Package Sub-stations, Feeder pillars, MV Cable, Lighting Cables, ducts, etc.Drainage work:- Construction of ditches, soak away trenches, soak ways, cross-drains, median inlets, etc.Irrigation and Landscaping:- Landscaping of 3 nos. Interchanges and 16km.Road Median, Major and minor Irrigation lines, 3 nos. pumping stations, 2 nos. water reservoirs, ducts, terra-force walls etc. عرض أقل

    • COWI A/S

      Jul 2010 - Sept 2010
      SENIOR SURVEYOR

      Project: Mesaimeer - Ain Khalid Sewerage ProjectResponsibilities:Dealing with Contractor the day to day construction survey activities, Checking of Shop drawings etc.Project included the following:Drainage work including Construction Micro tunnels, Open cut Sewer mains and trunk lines, House connections, Pumping Station and Forced main Construction etc.

    • AECOM

      Oct 2010 - now
      S/R HIGHWAY SURVEYOR / CIVIL ENG. / ROADWAY DESIGNER

      Projects:1) QS001 – Doha Industrial Area – Package 1 & 2) Salwa Road Phase-II Doha Expressway Package-7Responsibilities:Head of Survey, Cad, Design modification and As-built department.Dealing with Contractor the day to day construction survey activities with the assistance of 8 field Highway Surveyors, one As-built Engineer and one CAD operator. Managing the complete daily field survey checking of all construction activities, acquiring and storing all the as-built data, making required modification on design drawings in order to meet the present site conditions or Client’s additional requirements, checking and approving Shop drawings, checking and approving As-Built Survey drawings and As-Built Record drawings etc.Project included the following:1) QS001 – Doha Industrial Area – Package 1Road work:- Total 38 km. including Arterial, Collector and Local roads.Utility works:- Surface Water Drainage System including Micro Tunnels, TSE lines, Potable Water lines, EHV/HV, MV, LV lines, Q-tel, QAF, SSD, ICT, ITS lines, Road Lighting, Traffic Signals, Irrigation and Landscaping, Signage and Road marking including Gantry and Cantilever Signs, Precast Boundary walls, Drainage Pond, etc.2) Salwa Road Phase-IIRoad work:- 7 km. Highway (4 lane dual carriageway) including 4 Interchanges and 3 Underpasses starting from Al Asri interchange to Industrial Interchange, Frontage roads and Cross roads, Cycle path etc.Structural works:- 4 Interchanges, 3 Underpasses including Bridges, Underpass walls, Wall barriers, etc.Utility works:- Surface Water Drainage System including Micro Tunnels and Forced Mains, Sewer line, TSE lines, Potable Water lines, EHV/HV, MV, LV lines, Q-tel, QAF, DSS, ITS lines, Road Lighting, Traffic Signals, Irrigation and Landscaping, Signage and Road marking including Gantry and Cantilever Signs, etc. عرض أقل

  • Licenses & Certifications

    • MQSi

      QUANTITY SURVEYORS INTERNATIONAL
    • M. ASCE

      American Society of Civil Engineers