Ashwani Kumar

Ashwani Kumar

Quality Control Supervisor

Followers of Ashwani Kumar1000 followers
location of Ashwani KumarGurugram, Haryana, India

Connect with Ashwani Kumar to Send Message

Connect

Connect with Ashwani Kumar to Send Message

Connect
  • Timeline

  • About me

    Manager - Project Coordination at Toshiba JSW Power Systems Pvt.Ltd.

  • Education

    • ECK Kota

      2006 - 2009
      Bachelor's degree Mechanical Engineering Ist Rank

      Activities and Societies: Anukriti , UCE Youth Run Did B.E. at ECK kota

    • Aryabhat Polytechnic , Delhi

      2001 - 2004
      Diploma Mechanical Engineering Ist Rank

      did diploma in Mechanical

    • Happy Child High School

      2000 - 2001
      10th

      Did 9th & 10th from Happy Child high School

    • University of Rajasthan

      -
      Bachelor of Laws - LLB
  • Experience

    • L&T Power

      Aug 2004 - Nov 2006
      Quality Control Supervisor

      • Coordination with third party inspection agencies• Devising inspection plans, schedules & checklists for various project systems.• Application of SAP for “Quality Usage Decision” notes for inspection clearance for various equipment / items to be dispatched to site.• Carrying out inspection of various items used in Power plants viz. structural steel , fabricated items, pipes, fans, blowers, valves, expansion Bellows, dampers, EOT cranes, pipes fittings, tanks, pressure vessels, Economizer & super heater coils, rubber lining etc at vendor’s end to ensure compliance with quality standards.• Resolution of deviations observed during inspection at the vendor's works.• Supporting third party inspections and co-ordination with regional inspection offices of third parties like TUV, SGS , TPL , Quest and vendors. Show less

    • L&T Power

      Aug 2009 - Nov 2011
      Sr. Executive

       L1 and L2 schedule preparation in Primavera based on various agencies & OEMs inputs. Deciding activity & its weight age , relationships with other activities. Scheduling of projects to meet deadlines and milestones. Progress curve generation in Primavera in line with cash flow curve & billing breakup. Preparation and submission of progress report and schedule to client. End to end execution for project supplies dealing with EOT Cranes , Hoists , Gas conditioning system , Water Treatment systems , HP and LP pumps , valves , Effluent treatment plant, Filter and Dosing system , Fire fightening system ,Chlorination System, Side stream filtration, CW System , Air Conditioning and Ventilation system as well as refurbishment & modernization projects. Raising "Purchase Requests" in SAP for various systems / equipment prior to floatation of enquiry. Coordination with engg. consultant & purchase for timely placement of orders and documents approval. Day to day dealing with vendors for smooth & on-time deliveries. Visit to vendor works for ensuring capabilities and review of engineering and manufacturing. Keeping direct track with sub suppliers also to ensure their participation and avoid any communication gap. Providing forecast to other departments like projected sales to contracts deptt., expected deliveries to QA&I and to site.  Reviewing vendor drawing and ensuring adherence to preset technical specifications and quality standards at vendor’s end. Expediting with vendors during post ordering stage to expedite deliveries of various equipment/systems to project sites.• Evaluation of vendors for various systems/items based on vendor's credentials and vendor visits Show less

    • Larsen & Toubro Limited

      Dec 2011 - Oct 2012
      Sr. Executive

      • Engineering coordination with client , vendor , sub vendor , EPC consultant• Looked after material supply for Pre-treatment plant with chemical house, DM Plant with UF(3x 110 m3/hr), Side stream filtration package , Hydrazine& ammonia dosing system, Effluent treatment package , Chlorination (4 x 180 Kg/hr), Condensate polishing system , CW acid dosing system . ACW , Service Air and instrument air piping.• Witness of fit-up , welding quality and hydro test at vendor’s place • Certification of vendor bills.• To put up request to CEA office to avail excise benefit certificate(PAC)• Daily basis follow up with vendor/sub – vendor. Show less

    • L&T Power

      Nov 2012 - Oct 2015

      • L1 and L2 schedule preparation in Primavera based on various agencies & OEMs inputs. Deciding activity & its weight age , relationships with other activities. Scheduling of projects to meet deadlines and milestones. Progress curve generation in Primavera in line with cash flow curve & billing breakup. Preparation and submission of progress report and schedule to client.• Review of mech design calculations , Specifications , DCD , WBD ,GA drgs , Vendor drg • Erection and manual mode commissioning of Pre-treatment plant with chemical house, DM Plant with UF(3x 110 m3/hr), Chlorination (4 x 180 Kg/hr), Condensate polishing system , CW acid dosing system . ACW , Service Air and instrument air piping.• Witness of fit-up , welding quality and hydro test at site, • Certification of contractor bills.

      • Asst. Manager

        Sept 2014 - Oct 2015
      • Asst. Manager

        Nov 2012 - Aug 2014
    • Toshiba JSW Power Systems Pvt.Ltd.

      Oct 2015 - now
      Project Coordination Manager

       Major role is to fill the gap between various agencies. E.g. Engg releases the specification but no action by procurement.  Familiarization with all stages of the project i.e. Engineering, Procurement and construction-commissioning , Mandatory spares handover . L4 level planning , cost control for each package , Supply Engg progress monitoring , Delay analysis and catch-up plan, Site erection sequence coordination for supplies and P&M for BOP area (Coal handling , Ash Handling ,ESP , Water & waste water treatment plant, Compressed air system , Fuel oil handling system , LP Piping & specialties) & Boiler. To develop Baseline L4 Level Package Schedules for above packages for effective monitoring To prepare Project MIS, Package monitoring reports, 3 months rolling plan and Progress Reports, cost control reports, budget control for Client, Sr. Management and internal reviews. Post-award Contracts Management including Kick off Meeting, Contract Review meetings, material expediting, follow-ups and coordination with vendors. Monitoring of extra claims from vendors, Price amendments. Identification of Critical Path and near critical path areas/activities causing delay in schedule and coordinate project/package review by Sr. Management. Follow-up with client for delayed drawings, MDCC , BBU , MQP approval. Monitoring of catch –up action plan to fill up gap between scheduled & achieved progress. Preparation and review of Project Risk register for monitoring of Project Risks and initiating mitigation plan. Show less

  • Licenses & Certifications

    • IPMA Level D

      IPMA: International Project Management Association
      Aug 2011
  • Volunteer Experience

    • Weekends fun with street kings(kids)

      Issued by Vadodara on Apr 2015
      VadodaraAssociated with Ashwani Kumar