Sheraz ali

Sheraz ali

bookmark on deepenrich
location of Sheraz aliPakistan
Phone number of Sheraz ali+91 xxxx xxxxx
  • Timeline

    Jan 2012 - Dec 2014

    Chief Electrician/TDS Engineer

    ASAWER Oil & Gas Co. Ltd
    Current Company
    Jan 2015 - now

    Chief Electrician

    Mari Petroleum Company Ltd
    Current Company
    Jan 2015 - now

    Chief Electrician

    Mari Petroleum Company Ltd.
  • About me

    Chief Electrician Land Rig at MARI Petroleum Pakistan

  • Education

    • Government college of technology swabi

      1997 - 1999
      Diploma of associate engineer heating, air conditioning, ventilation and refrigeration maintenance technology/technician (hac, hacr, hvac, hvacr)
    • Government vocational institute swabi

      1995 - 1996
      02 years certificate course hvac
    • Ghs tarakai

      1993 - 1994
      Ssc science subject
  • Experience

    • Asawer oil & gas co. ltd

      Jan 2012 - Dec 2014
      Chief electrician/tds engineer

      Responsible for Maintenance, Inspection and Troubleshooting of 1500HP VFD Rig equipped with 03 Sets CATERPILLAR Generators 3512B (1200KW) & 02 Sets CATERPILLAR Generators 3406 (292KW), VFD control system manufactured by HongTian. Equipped with S7-300 PLC system, TDS11SA –VARCO Top Drive System, 2 x 1600 HP Mud Pumps with AC 1200KW Motors with AC drives (HH China), 1500 HP Draw works with AC 2x700 KW Motors with AC drives (HH China), Rotary Table with AC 700KW Motor with AC drive (HH China).Air Compressor Sullair, Troubleshooting, Maintenance, Repairing &Installation of Varco10S, 9S& BPM DQ70BSC Top Drive System, Start Up & Operation of Varco & BPM Top Drive System, Maintenance of Varco & BPM Top Drive System, Troubleshooting of Varco & BPM Top Drive System. Show less

    • Mari petroleum company ltd

      Jan 2015 - now
      Chief electrician

      Maintenance and repairing of 1500 HP VFD Rig equipped with 03 Sets CATERPILLAR Generators 3512B (1200KW) & 02 Sets CATERPILLAR Generators 3406 (292KW), VFD control system manufactured by HongTian. Equipped with S7-300 PLC system, TDS11SA –VARCO Top Drive System, 2 x 1600 HP Mud Pumps with AC 1200KW Motors with AC drives (HH China), 1500 HP Draw works with AC 2x700 KW Motors with AC drives (HH China), Rotary Table with AC 700KW Motor with AC drive (HH China).Air Compressor Quincy, Preparing Daily, Weekly & Monthly Reports, Troubleshooting, Maintenance & Repairing of all Rig Equipment. Maintained PMWS through SAP System. Show less

    • Mari petroleum company ltd.

      Jan 2015 - now
      Chief electrician
  • Licenses & Certifications

    • Seimens plc course

      Siemens
      May 2015