Hadi Bou Saab, PMP®

Hadi Bou Saab, PMP®

Interim Site Engineer

Followers of Hadi Bou Saab, PMP®2000 followers
location of Hadi Bou Saab, PMP®Dubai, United Arab Emirates

Connect with Hadi Bou Saab, PMP® to Send Message

Connect

Connect with Hadi Bou Saab, PMP® to Send Message

Connect
  • Timeline

  • About me

    Civil Engineer

  • Education

    • American University in Dubai

      2011 - 2015
      Bachelors Civil Engineering
  • Experience

    • Multiplex

      Jun 2014 - Dec 2014
      Interim Site Engineer

      •Supervised Concrete, Finishing, Façade and MEP works for The Address Boulevard in Downtown, Dubai.•Prepared Inspection Requests and Request for Information Documentation.•Reported site progress to Section Engineer and identified delays risk and mitigation measures.•Reviewed Material Submittals and coordinated with Procurement Engineers.•Prepared Shop Drawings for Consultant’s review and approval.

    • NBHH (United Arab Emirates)

      May 2015 - May 2023

      •Projects:Riyadh City North-Phase 7B for Al-Dar Developments. (Ongoing-Abu Dhabi)Khalifa City South East Sectors-Contract 231/5 for DMT (Abu Dhabi)Riyadh City South-Phase 1 for Al-Dar Developments. (Abu Dhabi)•Prepared construction expenditure forecasts to manage the overall cash-flow and deployment of resources•Managed the process of construction planning and provisional sum packages during construction•Managed and implemented the monthly construction progress reports, payment certificates, RFI/Shop Drawing and led in construction programs•Prepared contractual letters and recommendations which were issued to the clients, contractors and other stakeholders•Was appointed as the contact person amongst project stakeholders for tasks and concerns in direct relation to them•Managed the process of obtaining Authority Approvals •Managed site submittals (shop drawings, RFIs, Material Submittals, Method Statements etc.) to ensure proper coordination between different disciplines •Proposed several cost-benefit scenarios to execute different construction methodologies considering quality, time and cost parameters •Prepared Roles and Responsibilities matrices and detailed Scope of Works/Deliverables schedules •Analyzed tender documents and prepared proposals •Approved deployment schedules and optimized the use of resources to maximize profits•Supervised claims for varied works and Extension of Time based on contract conditions•Managed the planning department to help ensure an effective program control•Delegated teams to provide technical support to sub-contractors during the construction stage•Ensured that the works on site are completed in compliance with contract – particularly FIDIC based contracts •Handled Value Engineering tasks to reduce construction cost without compromising on project objectives•Reviewed and approved shop drawings (Architecture, Fit-out, Interior, Structure and MEP) to ensure they are in line with Client Requirements. Show less •Projects:Riyadh City South-Phase 1 for Al-Dar Developments. (Abu Dhabi)Jebel Ali City - Roads, Infrastructure and Buildings for Meraas Holding. (Dubai)•Managed and lead a team of site engineers and overviewed the full construction process according to client requirements and specifications.•Utilized resources to maximize productivity within the time frame using cost-beneficial techniques.•Supervised the construction of all underground utilities and major road works.•Prepared daily and weekly reports and compared to forecasted project plan in order to mitigate risks and delay.•Reviewed shop drawings and assisted the procurement team to ensure proper material engineering according to specifications and requirements.•Allocated daily targets for the construction team in alignment with the project plan for completion of the project. Show less •Project:Warsan First Re-development for Meraas Holding. (Dubai)•Supervised the construction process allocated by my project engineer and assured compliance according to required specifications.•Controlled the inspection process with the consultant using work inspection requests and gained approval.•Managed a team of foremen and skilled labor along with heavy machinery and utilized to accomplish allocated targets within the timeframe.•Supervised major works such as deep-line utilities, NDRC, and pump station construction.•Solved on-spot problems on site in order to avoid any delay in the construction process. Show less

      • Construction Manager

        May 2021 - May 2023
      • Project Engineer

        Jun 2016 - Apr 2021
      • Site Engineer

        May 2015 - Jun 2016
  • Licenses & Certifications

    • Project Management Professional (PMP)

      Project Management Institute
      Oct 2022