José Luis Márquez

José Luis Márquez

Founder, Owner and CEO

Followers of José Luis Márquez1000 followers
location of José Luis MárquezTomares, Andalusia, Spain

Connect with José Luis Márquez to Send Message

Connect

Connect with José Luis Márquez to Send Message

Connect
  • Timeline

  • About me

    Procurement Director & Construction Lead

  • Education

    • EP La Rábida

      1993 - 1998
      Ingeniero Técnico Industrial Electricidad, Centrales y Redes
    • Instituto Internacional San Telmo

      2010 - 2010
      PIDE Programa Intensivo Dirección Empresas
  • Experience

    • Grupo Inverseed (Sostiene, Solarclic y Builds Confidence)

      Sept 2002 - May 2013
      Founder, Owner and CEO
    • Abener México

      Mar 2005 - Aug 2006
      Chief Operating Officer (COO)
    • Abener Energía

      Aug 2006 - May 2009
      Project Director for EPC of Biodiesel Plant located in San Roque (Cádiz, Spain)
    • Abeinsa Engineering Inc.

      Jun 2013 - Jan 2016
      CEO for Abeinsa Engineering in USA
    • Abeinsa Engineering

      Jan 2016 - Dec 2020

      Waad Al-Shamal is an Integrated Solar Combined Cycle Plant, located in the south of Turaif in the Northern Border Región (Saudi Arabia), it has a total capacity of 1,390 MW, of which 50 MW will come from a Solar source, it was awarded as an EPC Project by the Saudi Electricity Company (SEC) to the consortium made by General Electric and Abener Energía. Abeinsa Engineering offers a comprehensive service that goes from conceptual engineering to basic and detailed engineering, all coordinated by a project management team so that an integrated product is achieved.

      • Waad Al-Shamal Project Director

        Sept 2016 - Dec 2020
      • Business Development Responsible

        Jan 2016 - Sept 2016
    • Abengoa Energia

      Oct 2020 - Feb 2023
      PV Francisco Pizarro, UTE FCC-Abengoa Project Director

      Francisco Pizarro is the largest Photovoltaic development in Europe and the largest launched by Iberdrola worldwide. It will have an installed power of 590 MWp, located between the municipalities of Torrecillas de la Tiesa and Aldeacentenera (Cáceres, Spain), it shall occupy an area of 1,300 hectareas and will prevent the emission into the atmosphere of more than 245,000 tons of CO2 per year.

    • H2B2 Electrolysis Technologies, S.L.

      Feb 2023 - now
      Procurement Director & Construction Lead
  • Licenses & Certifications