Zhen Yang Lee

Zhen Yang Lee

Design Engineer

Followers of Zhen Yang Lee368 followers
location of Zhen Yang LeeSelangor, Malaysia

Connect with Zhen Yang Lee to Send Message

Connect

Connect with Zhen Yang Lee to Send Message

Connect
  • Timeline

  • About me

    Mechanical Design Engineer at Cheng Hua Engineering Works Sdn Bhd

  • Education

    • Confucian Private Secondary High School

      2003 - 2008
    • Universiti Tunku Abdul Rahman

      2009 - 2013
      Bachelor's degree Mechanical Engineering Second Upper (CGPA : 3.48)
  • Experience

    • Leap forth engineers sdn bhd

      May 2011 - Oct 2011
      Design Engineer

      - Basic Air Conditional and Mechanical Ventilation Design- Basic Sanitary and Water Supply System Design- Basic Electrical Design - Basic Fire Protection Design

    • Mackenzie Industrial SDN BHD

      Jun 2013 - Jul 2015
      Design Engineer

      As a Design Engineer/Engineering Department - Biomass Boiler – Bi-Drum Water Tube Boiler (25 Ton/hr to 55 Ton/hr)- Pressure Part & Non-Pressure Part- For Boiler Pressure Part Design in accordance with BS 1113:1999 Edition- Bi-Drum Water Tube Boiler with Fixed Grate, Reciprocating Grate & Vibrating Grate.- For Pressure Part Of Boilera) Prepare Stress Calculation.b) Steam Drum, Water Drum, Water Column, Boiler Tubes and Header.c) Boiler Tube Bending Design, Drum Internal Design.d) Economiser & Air-Preheater.e) To liaise with Third Party (Lloyd’s Register) For Approval of Drawing.- For Non-Pressure Parta) Boiler Foundation Layout Drawing.b) Chimney Design in accordance with Software Megastack in accordance with ASTM STS-1-2011.c) Flue Gas Ducting Design and Prepare Calculation assist Project Team Submit to DOSH.d) Air-Ducting Design and Calculation (FF Duct, FD Duct & SA Duct).e) Platform Design, Boiler Insulation Drawing, Boiler Structure & Casing.f) Ash Pit, Blowdown Tank, Dry Ash Conveyor & Water Submerged Ash Conveyor. g) Multi-Cyclone Dust Collector & Multi-Cyclone Duct Collector with Wet Scrubber- To Issue Non-Pressure Part Fabrication Drawing to Contractors.- Preparing Bill of Material (BOM) For Non-Pressure Part To Purchasing Department.- Coordinates with Sales Manager and Sales Engineer to Prepare Tender Drawing.- Assist Manager to Prepare Cost Estimation and Quotation For Repair Job.- Organize and Schedule the Engineering Work.- To Liaise with Client, Supplier, Contractor and Project Team in order to Achieve Target.- Site Visit for Improve and Upgrade Drawing.- To Monitor, Forecast and Purchase Cast Iron Item For All Projects. Cast Iron Items Included Firing Door, Feeder Chute, Cone, Vane, nozzle and Fire Grate. Show less

    • Cheng Hua Engineering Works Sdn Bhd

      Aug 2015 - now
      Mechanical Design Engineer

      Project Michelin (as Design Engineer)- Machine Design (Free Flow Conveyor, Gravity Free Roller, Spiral Curve Gravity Conveyor, Ergo Loading.)- Structure Design- Primary and Secondary Structure Design- Pneumatic Circuit Design- Spare Part OrderingProject Muratech- (as Design Engineer)- Machine Design-Lifter, Air Lifter, Mobile Staircase, Cross-over Bridge- Structure Design- Secondary Structure (leg support for machine)- Prepared JKKP Document (Vertilator, Air Lifter and Lifter) - Spare Part OrderingShanghai China Project (as Design Engineer)- High Speed Lifter (Provide Drawing for China Manufacturing)- Sensor selection and Anti-back devicesVepro Sdn Bhd (as Project Leader)- Layout Planning and Project Schedule- Machine Design(V-belt Conveyor) - Accessories (Air Brake System, Plate Stopper, Turning Devices, Pusher and Puller Devices.)- Pneumatic Circuit Design- Spare Part Ordering Show less

  • Licenses & Certifications

    • Graduate Engineer

      BEM
      May 2015