Ari Leifsson

Ari Leifsson

Followers of Ari Leifsson914 followers
location of Ari LeifssonRegion of Southern Denmark, Denmark

Connect with Ari Leifsson to Send Message

Connect

Connect with Ari Leifsson to Send Message

Connect
  • Timeline

  • About me

    Senior Project Manager @ Viknordik ehf | IPMA, PRINCE2

  • Education

    • Faculty of Engineering, University of Southern Denmark

      1983 - 1986
      Bachelor of Science Mechanical engineering

      Activities and Societies: Revygruppen I completed my education as Bachelor of Science within Mechanical Engineering. Specialty: Energy Technology

  • Experience

    • LEGO Group (Previous name: LEGO Engineering A/S)

      Aug 1986 - Jun 2003

      Professional Experience in Mechanical Design and Project Management:During my initial years, I specialized in mechanical design. Subsequently, I assumed the role of Technical Project Manager, overseeing the procurement of semi- and full-automatic production lines. These equipment systems were predominantly modular, allowing for flexible configurations. By connecting smaller modules to larger “main modules,” we optimized investment costs for part-specific equipment. Our clientele consisted of various production sites within the LEGO organization, spanning global locations. Show less Logistics and Technical Department Responsibilities:As a member of the Logistics Technical Department, I actively participated in cross-organizational projects aimed at identifying and implementing potential logistical efficiencies. These initiatives encompassed diverse areas such as storage optimization, production layout enhancements, and internal transport equipment streamlining. Additionally, I held the responsibility of preparing and submitting applications for environmental approvals to local authorities. Show less

      • Technical Project Manager

        Nov 1988 - Jun 2003
      • Project Coordinator

        Aug 1986 - Oct 1988
    • Sonion (Previous name: Sonion Horsens)

      Jun 2003 - Apr 2006
      Technical Manager

      Professional Journey: Project Manager to Technical Department HeadIn June 2003, I assumed the role of Project Manager. By the end of the same year, I transitioned to the position of Head of the Technical Department. In this capacity, I held responsibility for overseeing the final development of loudspeakers designed specifically for mobile phones. My duties extended to managing the procurement of production lines, both for high-volume and low-volume manufacturing.

    • Danfoss A/S

      Jun 2006 - Aug 2009
      Lead Project Manager

      Role as Overall Project Manager in Product Development:As an Overall Project Manager, I spearheaded a critical initiative known as “The Platform Project.” This multifaceted endeavor encompassed development activities, production setup, and the successful market launch of a novel product range: Solenoid Valves. The project was strategically designed around a platform-based approach, allowing for modular utilization of various components across different valve variants.My responsibilities included orchestrating seamless collaboration between development teams, ensuring efficient production processes, and driving the successful introduction of this innovative product line to the market. Show less

    • Vestas Wind Systems A/S

      Sept 2010 - Mar 2016
      Project Manager

      During my initial two years at Vestas, I held the position of Overall Project Manager for a cutting-edge Technology project within the Research and Development (R&D) domain. The project focused on the development of an intelligent optical sensor system, specifically designed to enhance wind turbine control during turbulent conditions. My responsibilities encompassed system design, qualification for a 20-year operational lifetime, and adherence to the Vestas development model known as the “Vestas Way to Market.” This endeavor was characterized by its high technical complexity and extensive interface coordination, involving stakeholders both within and outside of Vestas.Simultaneously, I successfully managed various option projects tailored to meet the unique requirements of our customers.In subsequent years, my role transitioned to that of a Project Manager within the Continuous Improvement Management department. Here, I spearheaded Service Business Improvement Projects and played a pivotal role in integrating the aforementioned intelligent optical sensor system into the 3MW V112 turbine platform. Show less

    • Leifsson Projects

      Apr 2016 - Apr 2016
      Project Manager

      Freelance Project Manager - Generic

    • Dansk IngeniørService A/S

      May 2016 - Dec 2024
      Senior Project Manager

      Project Management Consultant

    • Viknordik ehf

      Jan 2025 - now
      Senior Project Manager
  • Licenses & Certifications

    • IPMA - Level B - Senior Project Management Certificate Number DEN0498 issued in 2014 and re-certified in 2019

      Danish project management association
      Dec 2014
    • PRINCE2 Foundation Examination

      AXELOS Global Best Practice
      Dec 2014
    • Certified_Senior_Project_Manager (IPMA Level B)

      IPMA: International Project Management Association
      Dec 2019
      View certificate certificate