Sebastian Joseph

Sebastian Joseph

Followers of Sebastian Joseph418 followers
location of Sebastian JosephThrissur, Kerala, India

Connect with Sebastian Joseph to Send Message

Connect

Connect with Sebastian Joseph to Send Message

Connect
  • Timeline

  • About me

    Implemention Manager at Ericsson. BTech in ECE|Ericsson,Nokia,Huawei,Ceragon&Motorola Experience

  • Education

    • University of Calicut

      2011 - 2015
      Bachelor of Technology - BTech Electronics and Communications Engineering First Class with Honours

      Activities and Societies:  Secured 17th Rank in CALICUT UNIVERSITY in Electronics & Communications 2011-15.  Awarded as the BEST OUTGOING STUDENT of ECE dept during the academic year 2014-15.  Achieved 2nd place in “KRAMAJWALA” Circuit debugging contest held at NSS Engg. College, Palakkad.  Qualified to the FINAL LEVEL for CIRCUIT DEBUGGING EVENT , held at SAHRDAYA Engg. College, Kodakara. Qualified to the FINAL LEVEL for TREASURE HUNT EVENT, held at VIDYA ACADEMY OF SCIENCE AND TECHNOLOGY. Thalakkottukara.

  • Experience

    • Ericsson

      Aug 2015 - Jun 2017

      O&M Engineer(Bharati Airtel Project)  Ericsson BTS 2104,2106,2204,2206,2111,2308,6101,6202,6601 integration ,commissioning & trouble shooting. NSN 4G(FDD & TDD)& 2G integration ,commissioning & trouble shooting. Familiar with CRFS & SRAN Technologies Ericsson Transmission equipment’s MLE,CN(Compact Node) & MLTN(Traffic Node). Knowledge in AMM 1u,2u&4u. Different Modulation units MMU(34+2, 2*2-34+2, 4*2) & SMU(8*2 & 16*2). Knowledge in MLTN 2P,2PB, 6P,6PB,6PC &20P,20PB. Different Modulation units MMU2B, MMU2C, MMU2D, MMU2E , MMU2H, MMU2K & MMU3A. MINILINK-TRAFFIC NODE Testing & commissioning, Traffic migration, hop up gradations and implementation of SDH & PDH ring implementation for hub redundancy. 1+0,1+1,XPIC Ericsson link configurations with 7GHz, 15GHz, 23GHz & 38GHz frequency bands. TN software up gradation & TN swaps to higher versions. Knowledge in Huawei RTNs 905,950 & 980. Familiar with the Huawei cards ISV3, ISM6, CSH0, CSHR, CSHN, EG4. Knowledge about Huawei U2000. Microwave Link configuration in Ericsson & Huawei. Well knowledge in E1 routing in both Ericsson & Huawei links & VLAN routing in Huawei RTNs for NSN 2G,3G&4G. Supported for more than 400 Ericsson Microwave Swap as a part of Bharati Project. APG40 Ericsson BSC to EVOBSC Migration assisted for 160 sites in Thrissur BSC. Show less

      • Field Maintenance Engineer

        Sept 2016 - Jun 2017
      • Apprentice Trainee

        Aug 2015 - Aug 2016
    • Elite Technology LLC

      Jun 2017 - Mar 2022
      Telecom Engineer

      Working in Ericsson & SIAE transmission equipment’s(OOREDOO Transmission Project) Well Knowledge about the Minilink Craft versions upto 21 Q1. Hop up gradations with response to the path quality given by the client with necessary Hardware BOQ requisition, TRA requisition & License request file for implementation. 1+0,1+1,2+0,2+2&4+0 upgradation with the design provided. TN swap based on the requirements. Configuring Microwave links using MMU1002,MMU1001,MMU4A,MMU3A,MMU2K,MMU2H& MMU2D. Checking the feasibility on the existing nodes for TN software up gradation to the latest R6 release (R44A258). ML6600 series Microwave link implementations.ML6691,ML6692&ML6693 link implementations. VLAN configuration from the hub site and taking ping response for the same VLANs at the end site.  DCN over VLAN configuration over the network under a specific Hub. SIAE Microwave link implementation based on the requirements. Change request (CR) creation for site activity in client office. Also well aware of office duties which includes Site documentation, Site acceptance, SACC & MOCC creation & Invoice preparation.Working in Motorola ROP(Royal Oman Police) Project  Type1,Type2 & Type3 shelter staging including Rectifier rack installation, Equipment rack installation, Tetra BTS installation. Installation & configuration of site security systems SiteBoss 550. Configuration of sensors like ES-TH,ES-32C8V8R,ES-4C4R & ES-8C to SiteBoss. Installation & commissioning of Nokia Wavence MSS1 & MSS8 IDU equipment’s and UBT-S & UBT-T ODU equipments. Configuration of microwave links including 1+0,1+1,2+0 & 2+2 SD links. MPLS script loading in Nokia SARx switching equipment’s given by the client and crosschecking the configurations in the router. Installation & Configuration of AVIGILON Outdoor & Indoor cameras for sites. ATPs for Shelter installations, Site security, Tetra BTS, Microwave equipment’s & Switches with Client. Show less

    • Vodafone Idea Limited

      Apr 2022 - Aug 2023
      Manager - Operations and Maintenance
    • Ericsson

      Aug 2023 - now
      Implemention Manager
  • Licenses & Certifications