
Suaib Ibrahim
C.E. Estimator

Connect with Suaib Ibrahim to Send Message
Connect
Connect with Suaib Ibrahim to Send Message
ConnectTimeline
About me
Senior Structural Engineer at WS Atkins & Partners Overseas
Education

Manuel L. Quezon University
1969 - 1976Bachelor of Science in Civil Engineering
Universiti Teknologi Malaysia
1989 - 1991Master of Civil Engineering StructuresThesis: “Investigation of Flexural Cracking and Stresses in Reinforced Concrete Beams” — utilizing both laboratory investigation and finite element analysis using GT STRUDL.
Experience

Erectors, Incorporated
Feb 1977 - Jan 1978C.E. Estimator• Prepared contractor's cost estimates for tendering. Projects included buildings, aqueducts, drainage systems, water distribution systems and other civil engineering projects.

Construction and Development Corporation of the Philippines (CDCP)
Jan 1978 - Apr 1980Civil Engineer IIProject:Makkah Stormwater Drainage Project, Contracts 5 & 6, Makkah, Saudi Arabia.• Evaluated project costs such as labor, material, equipment and overhead costs. Recommended steps to improve project cost performance.• Prepared all reports for billing and measurement such as volume of pay quantities on works executed, contractor's payment certificates, claims, variation orders, etc.

Hamed Altaf Design Office
May 1980 - Jun 1989Structural Engineer• Prepared structural design work of building projects ranging from two-storey residential villas to multi-storey offices, shops, and apartment complexes (maximum of 13 floors).• Acted as Consultant's representative for inspection and supervision of project construction.Projects:• AL Saraa-e Building, Azizia – 4 units, Basement + Ground + 10 Typical Floors.• AL Baz Building, Shishia – Basement + Ground + 10 Typical Floors• Balto Building, Al Mansour St – Ground + 8 Typical Floors.• Subai-e Building, near Al Haram Mosque – Ground + 10 Typical Floors• Ground + 10 Typical Floors R.C Building in Misfala Area, Makkah.• Basement + Ground + Mezzanine +10 Typical Floors R.C. Building in Jarwal St., Makkah.• Ground + 6 Typical Floors R.C Building in Al Mansour St, Makkah.• Ground + 10 Typical Floors R.C Building in Shubaika Area, Makkah.• Ground + 10 Typical Floors R.C Building in Harat Al-Bab Area, Makkah. Show less

Khatib & Alami Consolidated Engineering Company
Sept 1991 - Oct 1994Structural Design Engineer• Structural analysis and design of reinforced concrete and steel buildings.• Supervision of preparation of final design drawings.Projects:• Shk Butti Tower - 25-storey reinforced concrete (R.C.) tower, Dubai, U.A.E.• ADMA-OPCO & ADGAS Gen. Headquarters - 23-storey R.C. tower with 7-storey R.C. parking structure, Abu Dhabi, U.A.E; in joint venture with Ove Arup & Partners, New York, U.S.A.• Dubai Creek Tower - 26-storey R.C. office tower, Dubai, U.A.E.• Sultan Bin Rashed Tower - a twin 21-storey R.C. apartment tower, Abu Dhabi, U.A.E.• Al Hamed Residential Complex - a 20-storey R.C. apartment building with flat plate floor slab, Abu Dhabi, U.A.E.• Al Hajiri Building - 7-storey R.C. building, Sharjah, U.A.E.• Khoula Hospital - 2-storey R.C. 300-bed hospital for the Ministry of Health, Sultanate of Oman.• Burger King Restaurant - 2-storey R.C. restaurant building, Riyadh, Saudi Arabia.• H.H. Sheikh Saud Al Qassimi Mosque - a big R.C. mosque for the ruling family of Sharjah, Sharjah, U.A.E. Show less

Badri & Bensouda Architectural & Engineering Consultants
Nov 1994 - Oct 1996Senior Structural Engineer• Design and supervision of building projects.• Supervised drafting works in the preparation of all structural drawings.• Acted as Consultant’s representative in the supervision of project construction.Projects:• Ground plus four (G+4) residential apartment building for Badri Family in Burj Nahar, Dubai.• 44 Units Staff Accommodation project for H.H. The Ruler’s Office in Nadd Al Shiba, Dubai.• Security Guard Accommodation project composed of 3 one-storey buildings in Jummeirah Dubai for H.H. The Ruler’s Office, Dubai.• Private Villa for Dr. Bin Brek in Umm Suqeim, Dubai.• Private Villa for Mr. Ayoub Badri in Mazhar, Dubai. Show less

SENARD ITC
Nov 2001 - Dec 2005Manager & Head, Structural Design Department• Managed the overall operations of the office.• Designed the P60-million ($US1.2M) Proposed Tawi-Tawi Central Mosque, Bongao, Tawi-Tawi, Philippines. The building model and the minaret were modeled in STAAD.Pro. 2004.• Designed the P15-million ($US0.3M) reinforced concrete medium-sized mosque with a 50-meter minaret in Jolo, Sulu, Philippines.• Designed the P85-million ($US1.7M) reinforced concrete New Tulay Central Mosque, Jolo, Sulu, Philippines. The 50-m high minaret was modeled in S-FRAME. Appointed by the Architect to supervise the structural aspect of the construction. • Prepared the preliminary design and presentation materials for the Proposed P200-million ($US4.0M) Grand Mosque & Islamic Center, Zamboanga City, Philippines.• Trained employees on structural design and road design works using both computer-aided and manual method. Show less

Gulf Engineering and Industrial Consultancy
Jan 2006 - Apr 2008Senior Structural Engineer - Head, Structural Department• Responsible for all activities of the Structural Department.• Prepared structural design philosophies and structural concepts on projects for design.• Prepared project specifications.• Carried out preliminary and detailed structural designs with accompanying calculation sheets.• Solved structural problems at sites.Projects:• Aquatic & Fisheries Development Center, Wakra, Qatar - A large research center complex.• MIC Clubs, Qatar Petroleum, Misaeed Industrial City, Qatar — a large sports complex featuring many long-span steel 3D space frame roofs and a pyramid-shaped thin shell reinforced concrete building. Show less

WSP (Cantor Seinuk) Middle East, Ltd
Apr 2008 - Feb 2010Senior Structural Engineer• Do structural analysis and design on a number of high-rise building projects.• Check and approve shop drawings submitted by contractors, & do corrective measures where required.Projects:• United Tower, Kuwait — a 60-storey reinforced concrete tower with flat plate post-tensioned slab, core wall and outrigger system; with 4-level podium and 3-level basement.• E35 Project, Abu Dhabi — composed of 5 towers ranging from 15 to 17 storeys with a common basement of 5 levels.• Nakheel “Tall” Tower, Dubai — the next tallest building in the world with more than 230 floors.• Plot 54, Downtown Burj Dubai, Dubai — a 50-storey tower with 4 levels of basement.• Al-Abbasi Tower, Dubai — a 25-storey tower located in Dubai Maritime City. Show less

Al Hamad Engineering WLL
Apr 2010 - May 2014Senior Structural Engineer - Head, Structural Department• Manage activities of the whole Structural Department.• Design, check design of projects handled by the company.• Supervise preparation of shop drawings prior to submission to project consultant.• Provide solutions to structural problems and issues arising at project sites.Projects:• Al Mana Hotel, Najma, Doha - A 13-storey hotel with 3 basements.• NIGP Gas Plants, Ras Laffan Industrial City - A huge gas plant complex for the production of nitrogen, hydrogen, oxygen and argon in their liquid state. Show less

WS Atkins & Partners Overseas
Jun 2014 - nowSenior Structural EngineerSenior Structural EngineerRail Division• Assist the Design Manager in ensuring that all structural calculations, structural drawings and reports are done according to client’s requirements, adhere to Atkin’s standards and are prepared within the approved schedule. Current assignment – underground switchboxes and related structures.Project: Doha Metro Gold Line – The Gold Line.is the largest and most challenging of the five contract packages of the Doha Metro. It crosses Doha from East to West and includes 15 kms. of 6-meter diameter twin tunnels and 13 underground stations. Our Doha design team is responsible for the concept, preliminary and detailed design of the tunnels and all non-station structures while the design of the stations were given to the Atkins Hong Kong and UK teams. My main responsibility includes design of R.C. underground switchboxes with walls, slabs and foundations ranging in thickness from 800mm to 2800mm in accordance with Eurocodes; modelling of the structures using Autodesk Robot Structural Analysis Professional; supervising the preparation of design drawings and preparation of required structural design reports. Foundations are resting on Midra Shales and Rus Formation bedrock. All concrete are with design life of 120 years and contained 70% GGBS and 5% Silica Fume (SF) to meet durability and performance requirements. Also in-charge of linking evidences to complying with Employer’s Requirements (ER) and evidences to providing Control Measures (CM) to identified Hazards in ComplyPro Gold Line Underground Database.Estimated capital cost is QAR 12bn+. Show less
Licenses & Certifications

Autodesk Approved AutoCAD Instructor, AutoCAD 2005
AutodeskMay 2004
Licensed Professional Civil Engineer
Professional Regulation Commission, PhilippinesMay 1977
Grade A Civil Engineer
Engineering Committee, Urban Planning & Development Authority, State of QatarNov 2006
Honors & Awards
- Awarded to Suaib IbrahimHonorable Mention Award Concrete Reinforcing Steel Institute (CRSI), USA 1992 CRSI Software Development Competition Spreadsheet Category, Entry: "Deflection of Reinforced Concrete Beams and Frames (DEFBEAM)"
- Awarded to Suaib IbrahimFull Academic Scholar (Dean’s List) Manuel L. Quezon University 1970 Consistent academic scholar for eight (8) semesters,1970-1975.
- Awarded to Suaib IbrahimClass Salutatorian Philippine Muslim College, High School Department Apr 1969
Languages
- arArabic
- fiFilipino
- enEnglish
Recommendations

Fahad khan
Scada/Application engineer- Oasys DNA ( 7.4/7.5/7.7 )United Arab Emirates
Bianca de moraes melhado
Consultora de marketplace | Analista de dados | Analista de ecommerce | Data analytics | Power BI | ...Praia Grande, São Paulo, Brazil
Kawamura masaharu
Generative AI Development Engineer at the University of TokyoKanagawa-ku, Kanagawa, Japan
Khushboo garg
Senior Analyst, Climate, Environment & Sustainability Group @ CSTEP | Content writer, Sustainable Li...India.webp)
O'dili ike (mba, cissp, cism, ceh)
Senior Cyber Security Engineer at Quantech ServicesUnited States
Maria teresa luciano i.
Executive Assistant to Hilton Country GM - Qatar/ General Manager - The Plaza Doha, LXR Hotel & Reso...Doha, Qatar
Markéta kokošková
Bring out the best in those around you and let them bring out the best in you🙏🏼.Metropolregion Prag
Blaine tucker
Senior Regional Manager Keter Environmental ServicesLand O' Lakes, Florida, United States
Ann-solenn léo
Auditrice financière chez PwC France | Master CCAParis, Île-de-France, France
Karol bak
QRM Founder Poland [ QRM, LEAN, AGILE, Queueing Theory ]Gdynia, Pomorskie, Poland
Milena sirakova
Principal Еngineer Design Methodolgy at GLOBALFOUNDRIESBulgaria
Bogdan ulmanu
Sales Consultant - Service ContractsTimişoara, Timiş, Romania
Syed muhammad rafay
-Karāchi, Sindh, Pakistan
Oumaima b.
HR | Recruitment Specialist | Soft SkillsLondon, England, United Kingdom
Edward chan
Digital Channels Manager at MTR Corporation Limited 香港鐵路有限公司Hong Kong SAR
Rasmus abrahamsson
Student på IHM Business SchoolSweden
Juan carlos marín camacho
Gerente de Protección de Valor en Grupo DökkaCosta Rica
Henrik bruhn
Installer vores gratis app og få mange flere 5-stjernede anmeldelser på Google.Region Midtjylland, Danmark
Francisco james
Hiring manager at Holland America - PrincessNigeria
Shreya n raj
Actively looking for new job Opportunity|Python|Data Science|SQLKarnataka, India
...