Flavia Brotto

Flavia Brotto

Developer and junior system analyst

Followers of Flavia Brotto701 followers
location of Flavia BrottoVila Velha, Espírito Santo, Brazil

Connect with Flavia Brotto to Send Message

Connect

Connect with Flavia Brotto to Send Message

Connect
  • Timeline

  • About me

    Propritária do Espaço Narayan - Yoga, meditação e terapias integrativas

  • Education

    • The Federal University of Espirito

      1989 - 1993
      MBA; bachelor degree Telecommunication; Civil Engineer

      Management of Business and Networks ­ Finished in March 2007 ·; five year program)

    • Universidade Vila Velha - UVV

      2005 - 2006
      MBA Telecommunication, network and business Management
    • Universidade Federal do Espírito Santo

      1989 - 1993
      Bachelor Engineering

      Tennis and table tennis champion in the university games for three years. Volleyball champion and vice-champion team in the university games of 1990 and 1991.

  • Experience

    • Companhia Internacional de Tecnologia

      Jan 1992 - Jan 1996
      Developer and junior system analyst
    • CDSV ­ Groupe Xerox

      Jan 1998 - Jan 2001
      Technical Support and Infrastructure Analyst

      · Study, planning and creation of test plans · Execution of software tests · Test team leader · Use of CMM level 3 processes and methodology; Company: BCP (Telecom Industry) ­ São Paulo -1997

    • Xerox

      Jun 1998 - Dec 2001
      SoftwareTest Engineer

      Iteratively generate and maintain test plans that provide the optimal coverage based on project constraints, (this covers clinical validation, functional verification and performance.) Generate and maintain test cases and traceability matrix for the project, (this covers clinical validation, functional verification and performance.) Accountable for quality delivery of stories into production.Provide timely status, metrics and issues to Technical Lead & Project Manager. Communicate defects and needed enhancements to Developers as they occur. Improve test cycle duration through the use of an automated testing tool. Ensure Test Cases delivered cover entire scope of stories delivered. Ensures Project Team understands testing process and error documentation. Show less

    • DLN Consultoria e Informática Ltda

      Mar 2002 - Jul 2004
      IT Coordinator

      •Coaching end users of the engineering and investments area of Company do Siderúrgica Tubarão (CST - Group Arcelor) in new processes established with the implementation of enterprise project management tool(EPM) from February to June 2004; •Management, installation and implementation of the solution EPM (Enterprise Project Management) 2003 and Microsoft SharePoint 2003 (SharePoint Portal and WSS 2.0) •Writing of all project documentations•Management of projects using the methodology of the PMI (Project Management Institute) •Management of the development project of a chemotherapy control system for CECON clinic in Vitória. The system was developed using VB.NET; •Project manager for projects at several Brazilian companies such as CST - Group Arcelor, Garoto (Group Nestlé), CECON. Show less

    • Coimex Logistics

      Jul 2004 - Mar 2006
      IT Manager

      • Management of the Department of Information technology in three subsidiaries (ES, RJ and SP) of Coimex Logística Integrada that included the areas of network infrastructure, information systems, telecommunications, printing and copies, physical and logical security systems, contract and suppliers management, management of IT services, management of an IT team of 12 people in three different regions.• Some of my functions were: Analyze and translate the needs of the department to develop and propose solutions, Plan, organize, and implement new solutions and/or modified current information systems to handle those needs;  Identify training needs and develop/implement training programs to enhance computer skills throughout the organization;  Identify and manage projects changes and risks,  Determine costs and budgets for information technology projects and controls costs to approved budgets; Manage multiple projects including information systems development, network and telecommunications projects; Establish and maintain service level agreements with our internal and external clients, maintain a good relationship with our clients and suppliers.• Communication interface between Coimex directors, suppliers, internal and external clients and the IT team. Show less

    • Vila /velha Container Terminal - Group CVRD

      Apr 2006 - Dec 2007
      IT Manager

      • Management of the Department of Information Technology Terminal Vila Velha, group CVRD (Cie. Vale do Rio Doce), coordinating projects in the field of network infrastructure and information systems; • Check the motivation and commitment of the users during the life cycle of the system information projects • Ensure the success of projects by planning and doing the follow up with suppliers, users and staff members.• Communication interface between suppliers, users and TVV managers and directors• Use of PMI methodology to manage projects Show less

    • Prosperi (DLN Consultoria e Informática Ltda) - Juillet 2007 à Mars 2008

      Jun 2007 - Mar 2008
      Project Manager / Consultant

      In Brazil• Project management, installation and implementation of the solution EPM (Enterprise Project Management) 2007 and Microsoft SharePoint 2007 (MOSS and WSS 3.0)• Writing of all project documentation such as technical specifications, functional specifications, minutes of meeting, etc.)• Instructor of the following courses:o Administration de « Project Serveur »o Using « Project Web Access »o Using « Project Professional et EPM »o Microsoft S2B (Student to Business) OOP (Object Oriented Programming) with C# (C Sharp) Visual Studio 2005 Show less

    • Upper-Link

      Apr 2008 - Apr 2009
      Project Manager / Consultant

      In FranceInternal Projects • Study and development of a document management application in Sharepoint 2007 using Visual Studio 2008 and C # • Customization and prototyping sites using sharepoint designer • Migrating to Notes Domino bases SharePoint using Microsoft Transporter Suite • Installation and configuration of the SharePoint production environment in Upper-Link • Installation of sharepoint on virtual machines in the Upper-Link server (development environment) • Installing SQL Server 2005 and 2000 for the sharepoint environment • Participation in the design and implementation of the Migration and Interoperability Domino Sharepoint (tool allowing the transfer on-line data bases to a Domino environment Sharepoint)Projects at the client: ASTRA ZENECA: Consultant Sharepoint - Migration from Notes databases to SharePoint using Microsoft Transporter suite • Steering and migration of Notes Domino bases to Sharepoint 2007 • Recuperation of the migrated data in the Sharepoint environment INFOTEC: Management of the project “Implementation of the purchase module of the ERP Agresso” • Verification of the status of the project to create the its project plan and its schedule. • Given support to end-users • Project Manager • Communication interface between the accounting department, the IT department and the supplier of the ERP. TOTAL: Consultant / Project Manager • Setting up a parallel environment prior to the migration of Lotus Notes applications to SharePoint environment • Design and piloting of the feasibility • Establishment of an alternative solution parallel to Sharepoint • Supervision of the project team • Writing the deployment guide and project specifications Show less

    • Pragmantic

      May 2009 - Oct 2011
      Senior Sharepoint and Project Server Consultant

      •Migration of the MS EPM 2007 solution (Project Server 2007) to Project Server 2010. Here its three main objectivesIntroduction of a portfolio managementData Migration Project Server 2007 to Project Server 2010Improve the management of the overall lifecycle of the project•Installation and configuration of Project Server 2010 environment•Information Management (IM) consultant. My goal was to understand, analyze, propose solutions and to be the link between users and the area of governance for the collaborative environment on the SharePoint platform. She has also created and configured the intranet site of the PMI IT department•Development of a web portal using automation technology and AJAX ASP.NET C # with Visual Studio 2008 and SQL databaseAt Swissquote•Recovery of Project Server Environment and its data after a 'crash' in the server, migration from a 32bit to a 64 bit•Recovery of 'workspaces' and environment data in the new Project Server farm after migration•Recovery of Project Server 2007 Environment and its data•Supported customer in defining the SharePoint infrastructure and standards of usage, according to their needs.•Research and Installation of a temporary backup solution.•Installing and Deploying Microsoft DPM (Data Protection Manager)•Participation in the deployment of a business reporting tool based on the use of SharePoint (Reporting Nintex 2008)•Writing functional and technical documents and operating procedures for all solutions deployed•Writing the description of all services provided by SharePoint Infrastructure team•Writing informative and how to documents for all the solutions deployedOther Activities •Installation,Administration and Implementation of SharePoint 2010 and 2007 operations for several clients•Third level support for SharePoint 2007 and 2010 environments for several clients Show less

    • Philip Morris International

      Jul 2009 - Dec 2010
      Sharepoint and Project Server Consultant

      • Worked as a consultant for PMI international. As a consultant I performed the following tasks and roles:• Configuration of Project Server 2010 environment• Information Management Consultant where my role was to understand, analyze, propose solutions, publish news and articles and be the link between users and the governance area for the collaborative environment on the SharePoint platform• Development of the new web automation portal using ASP.NET C# (Visual Studio 2008), AJAX Toolkit, SQL Server 2005. Development of approximately 50 web pages Show less

    • OMEGA SA

      Nov 2011 - Aug 2013
      SharePoint Expert

      - Identify users needs for SharePoint environment and propose solutions- Business analist for SharePoint - Project manager for all projects running on Sharepoint platform- Communication interface between sharepoint suppliers, internal users and external users.- Implementation of Project Server 2010- Migration of SharePoint 2007 to SharePoint 2010- Implementation of business process using K2 Smartforms and K2 Blackpearl- SharePoint environment responsible, administrator and developer- Development of Sharepoint business solutions with Sharepoint designer 2010 and visual studio 2010 Show less

    • Self-employed

      Jan 2014 - now
      Owner of Espaço Narayan - Yoga and therapy studio

      Owner of yoga studio and therapist• Design and development of site in wordpress. Site url: https://www.narayan.com.br/• Use of thrive theme and thrive architect to create funnels and landing pages • Use of tools such as mailchimp, active campaign, Canva, Lunapic, Da Vinci Resolve, Movavi, Kinemaster, Inshot and Power Director• Interpreter (English – Portuguese) in a yoga teacher training and in individual therapy sessions.

    • Freelancer Software & Web Developer

      Mar 2014 - Dec 2014
      Independent Consultant and Entrepreneur

      - Currently working with bootstrap and wordpress to create responsive sites to clients.

  • Licenses & Certifications

    • • 70-177 - Tecnhology Specialist (TS): Microsoft Project Server 2010, Architecting Installing, and Configuring (70-177)

      Microsoft - March 2011
    • • 70-178 - TS: Managing Projects with Project 2010

      Microsoft - December 2010
    • • 70-315, 70-316 and 70-320 - Microsoft Certified Application Developer (MCAD): C Sharp – NET platform

      Microsoft - April 2004
    • • 70-541 - TS: Windows SharePoint 2007 Server Application Development

      Microsoft - February 2009
    • • 70-630 - TS: SharePoint Server 2007 Configuration

      Microsoft - February 2008
    • • 70-631 - TS: Windows SharePoint Services 3.0 Configuration.

      Microsoft - January 2008
    • • 70-632, 70-633 and 70-634 - Microsoft Certified IT Professional (MCITP): Enterprise Project Management with Microsoft Office Project Server 2007

      Microsoft - January 2008
    • • ITIL V3 Foundation - IT Service Management

      ITIL - September 2010