Eng Alaa Zaid,  PMP®

Eng Alaa Zaid, PMP®

MCM

Followers of Eng Alaa Zaid,  PMP®486 followers
location of Eng Alaa Zaid,  PMP®Lusail, Qatar

Connect with Eng Alaa Zaid, PMP® to Send Message

Connect

Connect with Eng Alaa Zaid, PMP® to Send Message

Connect
  • Timeline

  • About me

    Electrical and Instrumentation Engineer

  • Education

    • Al-Balqa Applied University

      2006 - 2010
      Bachelor of Science (BS) Mechatronics, Robotics, and Automation Engineering

      Activities and Societies: Debate team

  • Experience

    • JinMyeong Electric Inst. Co

      Mar 2011 - Oct 2012
      MCM

      • Working with ladder/tray installation drawings• Installation of power transformers , installation of switch gears panels CS Panels, Frequency drive panels, lighting panels, UPS system and MCC panels• Working with Earthing and lightening Drawings and installation • Working with lighting drawings and installations• Cable Pulling according to the cable list • Testing for the power cables (Medium Voltage and Low Voltage) According to the cable rated.• Installation and testing for Motors, Isolators and Local Push Buttons• Fiber Optic cables termination and OTDR test. • Fire alarm system & telephone system.• Insulation of transformers and tap changer test. • Invoice for all electrical work.• Making working schedule according to man working hour and calculate the required man power. Show less

    • JinMyeong Electrical Inst. Co

      Oct 2012 - Mar 2014
      Jordan India Fertilizer Co.

      • Working with ladder/tray installation drawings• Working with instrument Hookup drawings and generate BOQ• Checking the received materials spec’s and carry out the necessary approvals• Cross check instrument list with related drawings (PID and isometric)• Checking P&ID / Isometric drawings for instruments locations• DCS cabinets Installation• Cable Pulling according to cable list.• Cable Termination on DCS & Field Side.• Testing for the instrumentation cables (Low Voltage) According to the cable rated • Carry out the approvals for the installation of any kind of works• Making the Inspection with the Consultant and fixing all the comments and punch items.• Use the HART Communicator 475 to make Simulation and Loop Test for Installed Instruments on site and check DCS reading Value• Invoice for all electrical and instrumentation work.• Making working schedule according to man working hour and calculate the required man power.• Making Documentation and handing over work for the project. Show less

    • Lotte Engineering & Construction

      Mar 2014 - Jul 2014
      Electrical and Instrumentation site Engineer

      • Working with ladder/tray installation drawings• Installation of power transformers , installation of switch gears panels Frequency drive panels, lighting panels, and MCC panels• Working with Earthing and lightening Drawings and installation • Working with lighting drawings and installations• Cable Pulling according to the cable list • Testing for the power cables (Medium Voltage and Low Voltage) According to the cable rated.

    • Modena Construction Company L.T.D

      Jul 2014 - now
      Senior E&IC project Engineer

      • Working with ladder/tray installation drawings• Installation of power transformers , installation of switch gears panels Frequency drive panels, lighting panels, and MCC panels• Working with Earthing and lightening Drawings and installation • Working with lighting drawings and installations• Cable Pulling according to the cable list • Testing for the power cables (Medium Voltage and Low Voltage) According to the cable rated. low current systems ( Fire Alarm, Public Address, Access control , CCTV ) Show less

    •  Reliance power services and construction.

      Nov 2017 - Nov 2018
      Senior Electrical Project Engineer

      • Checking the correct drawings for the work to be done • Giving the drawing for the proper engineer and checking to gather the area of work and how the work will be done• Checking the completed task and that it has been done in a proper way• Checking for trenches excavation and that it has been done according to drawings • Following for cable ladder work• Cable pulling inside trenches and on ladder• Termination of cables after finish the required tests for cables• Installation of power stations and pulling the jumper cables between the equipment and then connect them all.• Installation of power and control panels• Installation of weather stations • Installation of CCTV system• Installation of Delivery station and capacitor bank and connect them • Commissioning work for the whole system. Show less

    • Egypt Gas

      Mar 2019 - now
      Senior Electrical and Instrumentation Peoject Engineer

      • Checking the correct drawings for the work to be done • Giving the drawing for the proper engineer and checking to gather the area of work and how the work will be done• Checking the completed task and that it has been done in a proper way• Checking for trenches excavation and that it has been done according to drawings • Following for cable tray work• Cable pulling inside trenches and on tray• Termination of cables after finish the required tests for cables• Installation of power and control panels then pull the jumper cables between the panels and then connect them all.• Installation of all the required instrument on pipes according to drawings• Installation of lighting and earthing systems • Installation of CCTV system• Commissioning work for the whole system. Show less

  • Licenses & Certifications

    • GECC

      Jordan
      Apr 2014
    • PMP® Certification Training Course

      Project Management Institute
      Dec 2020
    • Project Management Professional (PMP)

      Project Management Institute
      Dec 2020
  • Volunteer Experience

    • Electrical designer

      Issued by Arabteich jardaneh on Jun 2010
      Arabteich jardanehAssociated with Eng Alaa Zaid, PMP®