    Project Director driving successful project delivery through strategic planning, effective team leadership, and meticulous execution.

  • Education

    • Helwan university, cairo, egypt

      2002 - 2007
      B.sc. civil engineering
  • Experience

    • Alsafwa contracting

      Jun 2007 - Jun 2008
      Site engineer

      • July 2007 to June 2008:Project: Housing buildings & villas projectsLocation: Cairo – Egypt Consultants: Alsfwa Contracting Position: Site engineer

    • Al jaber engineering w.l.l

      Jun 2008 - Feb 2024

      Roads and Infrastructure in Semaisma - Package 4 (Project ID: IA 2018 C 073 G): I directed the comprehensive upgrade of roads, drainage, utilities, street lighting, and landscape for Semaism city. This involved reconfiguring the road network, constructing surface water drainage and potable water networks, and implementing various key components like the Gravity Sewer Network, Pump Station PS S1, Twin Permanent Rising Mains, and Gravity Trunk Main. The successful execution of the project included managing the development of 257,000m2 of road works, integrating a Foul Sewer Pump Station, and installing extensive pipe networks comprising various materials. Additionally, I oversaw the construction of a 35,000m2 landscape and the installation of irrigation systems, street lighting, and Intelligent Transportation System (ITS) infrastructure, along with various valve chambers and manholes. Show less Installation of DN1400 & DN1200 pipelines at Dukhan-Orbital interchange: I managed the construction and installation of corridor pipelines and fiber optic cable ducts between KM's GTC 600C (Orbital Road) and PWA's P023 (Dukhan Road). I also oversaw the installation of 1200mm to 1400mm diameter ductile iron pipelines for potable water and led the construction of valve chambers, manholes, and thrust blocks, including the supply and installation of valves and fittings. Additionally, I orchestrated the construction of electrical manholes and cable pull pits, while facilitating road crossings through advanced micro-tunneling techniques. Show less Al Rayyan Stadium FIFA World cup SC2022 Support Works – Package 06: I oversaw dual carriageway, junctions for 2022 World Cup Stadium and led geotechnical surveys, road construction, traffic signal installation. I executed landscape projects, street lighting, ITS, and CCTV installation, and facilitated telecom networks with Ooredoo, QNBN, and QAF. I coordinated KAHRAMAA water projects, including sewage, surface water, foul sewer, and potable water networks. I monitored micro tunneling, 41 drives totaling 5,000m, 11TBMs, and implemented RC Jacking pipes (OD965mm to 2000mm) with GRP and HDPE lining. Show less Pipelines for Mega Reservoirs Corridor Main 1 & 2: I oversaw the construction of the southern section of the Qatar Utility Corridor, managing the installation of pipelines and fiber optic ducts. The project included the installation of 166 Km of DI pipelines ranging from 600mm to 1600mm for potable water. Additionally, I handled the logistics for transporting 24,000 Di pipes from SGP France to Doha Port. My responsibilities extended to the construction of valve chambers, manholes, and the installation of valves and fittings. Notably, the successful execution of 10 major road crossings was achieved using Micro tunneling techniques, encompassing 4 highway crossings, 4 Qatar petroleum pipeline crossings, and 2 extra high voltage cable crossings (400KVA), totaling a length of 10,500m. The pipes utilized for these crossings were RC Jacking pipes with sizes ranging from OD1600mm to 3000mm. Show less Construction of CP7C-1C, Enabling Works for Commercial Boulevard: I led early enabling works project, coordinating dewatering, bulk excavation, and temporary support systems. I also managed site clearance, fencing, and design, installation, operation, and maintenance of temporary dewatering systems and ensured a smooth handover to the permanent works contractor. Additionally, I utilized mechanical means for dry excavation and facilitated material transport to an authorized off-site landfill. I oversaw excavation activities, including car parks (1,520,371m3), Western Marina lowering (386,000 m3), and Earth Bridge 2AC widening (30,000 m3) through selective filling. Show less EPIC For wet utilities distribution network for support services area phase l & ll at west end extension, RASLAFFAN (Oil and Gas): I implemented development and construction of dry and wet utilities networks to provide essential services for the Support Industries Area and ongoing projects in the West End Extension of Ras Laffan Industrial City. I conducted the design, engineering, procurement, and installation of 350 km of pipelines (potable water, sewage, and fire water). I used various pipe types (GRE, UPVC, HDPE, C.S., RC) with diameters from 80mm to 600mm and oversaw the construction of valve chambers, manholes, and electrical manholes, including eight road crossings. Also supervised the installation of underground and aboveground pipe supports. Show less Underground System & Misc. Piping works: I managed construction of dry and wet utilities for a major aluminum smelter in Doha, Qatar, one of the world's largest, and responsible for installing 80 km of pipelines for various systems, using different pipes with diameters from 25mm to 1800mm. I oversaw the construction of valve chambers, manholes, fittings, and valves, including the turnkey construction of a vacuum station building and successfully completed 13 road crossings using methods like R.C. culverts, pipe ramming, micro-tunneling, and horizontal drilling. I alo provided supply and installation of underground and aboveground pipe supports, including gas pipeline culverts, horizontal directional drilling, pipe ramming, road works, and underground concrete water tanks C-001. Show less

      • Project Director

        Mar 2020 - Feb 2024
      • Project Manager

        May 2019 - Mar 2020
      • Sr. Construction Manager

        Jun 2018 - May 2019
      • Project Manager / Construction Manager

        Sept 2014 - May 2018
      • Construction Manager

        Jul 2013 - Aug 2014
      • Project Engineer

        Jul 2010 - Jul 2013
      • Project Engineer

        Jun 2008 - Jul 2010
    • Alyamama pssd

      Feb 2024 - Aug 2024
      Project manager

       Project: Procurement and Construction for Ras Al-Khair Site Preparation (Oil and Gas) Client: Saudi Arabian Oil Company (SAUDI ARAMCO) Cost: SR 654,645,185.00 Position: Project Manager Scope of Work: The purpose of this project is to provide the Early Works for the Onshore TerminalFacilities includes but not limited to Onshore Terminal site development which include soil improvementand site grading. This package is required to prepare the site for the main EPC Contractors to constructthe Onshore Terminal Facilities. The site development will be within the Onshore Terminal Facilitiesbattery limit. The site preparation scope of work includes but not limited to soil improvement, site grading,excavation, backfilling, compaction, construction of temporary access roads, temporary construction fence,cut and fill, street lighting, importing fil material and deposal of waste, pipeline corridors, identification ofexisting underground utilities and fencing to allow follow-on activities such as foundation construction, andunderground services, to commence. Show less

    • Al jaber engineering w.l.l

      Aug 2024 - now
      Project director

      As project Director, I am responsible for developing and implementing comprehensive plans to coordinate plant and site resources, ensuring timely project completion. I also supervise and manage subcontractors, overseeing site labor and subcontractor activities. Verify the accuracy of plans, drawings, and quantities, ensuring precise calculations.In addition, I manage the selection and requisition of materials and equipment, negotiate prices, and propose cost-effective solutions for projects. My main focus is to monitor and interpret contract design documents provided by the client/architect.Furthermore, I collaborate with consultants, subcontractors, supervisors, planners, quantity surveyors, and project workforce. I communicate with clients and their representatives (architects, engineers, and surveyors), attending meetings to provide progress updates.Following is the list of my key projects: Project: Package 3 - Roads and Utilities: Explore Cluster and Wet & Dry Utilities - TROJENA Duration: 2024 - 2027 Client: NEOM Company PMC: Bechtel Designer: VIA International Cost: SR 1,411,991,856Scope of Work: Design and Buildo Explore Cluster Roads, Rest Areas, Cul-De-Sacs, Lay-by, Parking, and junctions, charging stations for electric vehicles for all roads, Bridge structures, utilities troughs, culvert, embankments, rock fall protection, foundations, electrical substation building and wet utility building.as applicable.o Storm water drainage elements, and all related hydrology design activitieso Wet Utilities Networks including DW, WTT, PW, TSE, etc..o Street Lighting Network & ICT duct system including all manholes and hand holes, Wi-Fi network, public safety and security networks and associated chambers.o Containment of the MV Cable Network.o Public Realm irrigation supply connections, Wayfinding Signage Structures and foundations, EV charging structures, foundations, containment, LV power supply cabling, etc. Show less

  • Licenses & Certifications

    • Project management professional (pmp)

      Project management institute
      May 2023
    • Lean construction certificate

      Lean construction institute – qatar (lci qatar)
    • Pmi risk management professional (pmi-rmp)®

      Project management institute
      Apr 2024
      View certificate certificate