Richard Hardstaff

Richard Hardstaff

Graduate Engineer

Followers of Richard Hardstaff914 followers
location of Richard HardstaffAuckland, Auckland, New Zealand

Connect with Richard Hardstaff to Send Message

Connect

Connect with Richard Hardstaff to Send Message

Connect
  • Timeline

  • About me

    Free thinker providing unbiased opinion

  • Education

    • Newport Hartridge Comprehensive

      1972 - 1979
      O and A-levels

      Activities and Societies: 1st XV rugby

    • University of Bradford

      1979 - 1983
      B Eng Civil and Structural Engineering
  • Experience

    • BBRV

      Jul 1984 - Dec 1984
      Graduate Engineer

      Pressure vessel stressing works.

    • J Jarvis

      Dec 1984 - Apr 1987
      Senior Site Engineer

      Construction of small to medium sized civil and building works in the London area.

    • Shephard Hill

      Apr 1987 - Apr 1990
      Section Engineer / Site Agent

      Initially diving and underwater construction for Queen Elizabeth Harbour in Jersey.Junior site agent reinforced earthwall and civils construction.

    • Birse Civils Ltd

      Apr 1990 - Sept 1990
      Section Engineer

      Supervision of earthworks, drainage, surfacing for a new road by-pass.

    • Shoreline Engineering

      Sept 1990 - Apr 1991
      Site Agent

      Management and construction of Bellmouth Utilities Crossing at West India Docks. Extensive and technically demanding underwater pipeline, cofferdam and dredging works passing through and beneath the dock.

    • Mowlem International

      Apr 1991 - Dec 1992
      Section Agent

      Managing construction of 500m long in-situ concrete jetty deck on tubular steel piles, land piling and link bridges, reclamation and shore protection works, 3km access road and paving works.

    • CEPA Slipform

      Jan 1993 - Jan 1995
      Power Section Manager

      Management and coordination of civils construction for 3x660MW coal fired power station. First power achieved after 18-months. Section works included slipforming and construction of windshield and flue (h=240m), boiler structure, turbine hall, back yard, various silos, land portion of cooling water system, various control buildings, sub-stations and infrastructure.

    • Wimpey

      Jan 1995 - Feb 1996
      Chief Engineer

      Engineering, supervision and construction of new tanker berth with associated civil and mechanical works. Running large precast block yard and batch plant, overseeing installation of blocks on seabed, reclamation behind blockwall, installation of firewater intakes and fire fighting system.

    • Freyssinet

      May 1996 - Oct 1996
      Site Manager

      Site management of post tension and stressing works, QA/QC and HSE for important 5km long match cast balanced cantilever bridge.

    • Barclay Mowlem

      Jan 1997 - Mar 1998
      Senior Engineer / Site Agent

      On site QA/QC and construction support at Darwin East Arm Port Project.Estimation support for Woranoora Bridge Tender.

    • Ahmed Mansoor Alaali Co BSC

      May 1998 - Feb 1999
      Engineer

      Estimation support in busy contractors tendering department. Preparation of construction methodologies, plant and equipment requirements and constuction programming.

    • Christiani and Nielsen

      Feb 1999 - Apr 2000
      Site Agent

      Management of fabrication, construction and installation of a new Seacombe Ferry landing stage in the River Mersey. A technically demanding and innovative Project.Management and upgrading of existing sea defences in Blackpool.

    • CCC

      Apr 2000 - May 2006
      Proposal Leader

      Preparation of Tenders for marine works, airports, buildings, heavy civils, process and petrochem in locations across the Gulf and parts of Africa.

    • Fulton Hogan

      May 2006 - Oct 2007
      Senior Estimator, major projects

      Estimation and preparation of Bids for major road and bridge works.

    • McConnell Dowell

      Oct 2007 - Dec 2008
      Senior Estimator

      Estimation and preparation of Bid proposals for marine works in New Zealand, New Caledonia, Guam, Vanuatu amongst others.Budgetry work for large diameter waste water tunnels.

    • Consolidated Contractors International Company

      Jan 2009 - Sept 2011

      Bid management and preparation of estimates for construction work throughout the world with emphasis on roads and bridges, coastal and marine works, heavy civil and nuclear power generation. Tender values vary USD250mio - USD+1bio and tenders included Jordan Nuclear Power and Losail Expressway Phase 1. Managing the estimation team pricing bridges, roads and infrastructure. Responsible for final price calculation, vendor and sub-contract appraisals, first principals estimation. The Qatar Bahrain Causeway JV were part of the consortium engaging to build a 40km fixed link between Qatar and Bahrain using a mix of causeways and bridges. The Joint Venture Partners were Vinci, Hochtief, Consolidated Contractors Company and QDVC. Project value around USD6bio (awaiting Government approval).

      • Senior Proposal Leader

        Jun 2010 - Sept 2011
      • Estimation Manager

        Jan 2009 - Jun 2010
    • BAM International bv

      Oct 2011 - Sept 2014
      Senior Estimator

      Successfully managed the change over to using CCS estimation system in the Gouda head office. This involved making a fully integrated master estimate automatically linking to the top-sheet and providing selected training and procedures for our personnel. Moved to Perth and established the tendering department responsible for pricing marine works in Australia, New Zealand and the Pacific rim. Enjoyed various levels of success with a number of tenders working out of Perth, Gouda and Jakarta.Tender values vary AUD150-400mio and highlights include: - award of FMG's AP5 Mineral Loading Wharf, Port Hedland (target tender)- award following preparation of the advance estimate for Moin Container Terminal, Cost Rica- expected award of Wajir Water Distribution network, Kenya- shortlisted for South of Embley, Weipa mineral loading jetty- Roy Hill mineral loading jetty and overland conveyor, Port Hedland - budgetary proposal for Bungus Bay port development, Indonesia- budgetary proposal and constructability review for Tanguhh LNG, Indonesia. Show less

    • AKTOR SA

      Oct 2014 - Feb 2016
      Tendering and Estimation manager

      Successfully built up the T&E team from scratch in Doha. There were 25 full time staff including estimators, quantity surveyors and procurement officers tendering civil and MEP work. Successfully established an integrated estimation system using CCS software. Wrote and successfully established all T&E procedures. Tendered for diverse work up to USD 400mio such as infra-structure; hotels/ residential and buildings; Doha Metro stations (awarded); standalone MEP projects; hangars and large industrial buildings. In the final year we bid over USD 2bio of work and were successful for the Metro Stations. Show less

    • ALYSJ JV

      Mar 2016 - Jul 2017
      Cost Control Manager

      The Gold Line Underground Metro Project scope includes construction of ten stations and 20km of tunnels. I successfully initiated and lead the reforecast of the entire Job to completion and the use of Candy CCS as the reporting, monitoring and cost control Application for the Project. The reforecast was prepared in a transparent, logical, traceable manner which was appreciated by the Project Management team. I am now experienced with all the major Candy Applications from Estimation to Valuations and Cost and Allowables. Show less

    • ALYSJ JV Green Line Extension Tender

      Jun 2017 - Jul 2018
      Coordinating Estimator - Central Bidding Team

      Coordinating, directing and managing the JV estimation team for the multi-billion USD turnkey Green Line Extension Tender - comprising 15km of bored tunnel, five underground stations, 12km of elevated track with three elevated and one at grade station.I lead the estimation team in front of our Bidding Committee who are overseeing our costings. I am empowered to challenge any matters that will lead to the production of a competitive Tender.I have introduced common resource pricing to the team and developed the strategy for combining all of the individual Partner efforts into a consolidated winning effort. Show less

    • McConnell Dowell

      Jul 2018 - Jan 2019
      TOC Manager - Wynyard Edge Alliance (Americas Cup AC36)

      Target Cost Estimate (TCE) Manager on the NZD200mio AC36 Americas Cup Project for the Wynyard Edge Alliance.Successfully managed a team of four estimators and reached agreement with the Independent Estimator for construction of a new wharf, Ro-Ro ferry terminal, marina facilities and team bases for this prestigious event.

    • HEB Construction

      Jul 2020 - Apr 2022

      Preparing bids for earthworks and roading contracts on the North Island. Successfully managed to upgrade the National Projects tender process with new top-sheet, master estimate and a host of other standard documents. All leading to the preparation of more reliable, robust, transparent and properly risked Tenders. Successfully managed the compilation and agreement of the budget estimate for this NZD785mio project.The Project scope for a shared user path connecting Auckland CBD with the north-shore included a significant 1100m harbour crossing and a further 4km of land based pathway.Successfully wrote the Project Risk Management Plan and prepared the Project Risk and Opportunity schedule.

      • Estimation Manager (National Projects)

        Jan 2019 - Apr 2022
      • TOC and Risk Manager - Northern Pathway Alliance

        Jul 2020 - Sept 2021
    • HEB Construction

      Jul 2022 - Jan 2023
      Estimation Manager - Mount Messenger Alliance

      Compiling the consolidated master Target Cost Estimate for a re-booting of the Mount Messenger Road realignment. The TCE being a combination of cost to date and cost to complete. Assisted by discipline estimators for earthworks, roading and major structures (which included two bridges and a 235m long tunnel) I personally costed the indirects, cableway construction and civil for mechanical works. I merged all the separate estimates into a single consolidated CCS file.

    • HEB Construction

      Jul 2023 - Nov 2023
      TOC 4 Estimation Manager (Auckland Systems Management Alliance)

      Member of the TOC 4 management team responsible for compiling the Target Out-turn Cost for the 4th tranche (2023-2026) of the Auckland motorway and network road maintenance contract. Agreeing the TOC being an essential part of securing funding for the next 3-years of work. Work involved close liaison with the Project team and interpretation and consolidation of their costings into one master CCS estimate. This was a complex and challenging task involving significant inter-action with many ASM operational departments including surfacing, structures, drainage, Auckland Harbour Bridge, tunnels, mechanical and electrical work and traffic management amongst others. Estimated total value over the 3-year tranche +/- NZD600M. Show less

    • Semi-retired

      Nov 2023 - now
      Estimation Manager

      I am a semi-retired Estimation Manager who can help you prepare large scale Bids for all types of construction projects. I have extensive experience of coordinating large multi-discipline teams to produce complete cost-effective estimates that will not leave you with sleepless nights after submission.Check out my profile to view my experience and find out what I can do for your organization.

  • Licenses & Certifications

    • B Sc Civil and Structural engineering

      University of Bradford