Muhadhir Baba

Muhadhir Baba

Senior Technician

Followers of Muhadhir Baba7 followers
location of Muhadhir BabaNegri Sembilan, Malaysia

Connect with Muhadhir Baba to Send Message

Connect

Connect with Muhadhir Baba to Send Message

Connect
  • Timeline

  • About me

    Project Manager di PK Agro Industrial Produk (M) Sdn Bhd

  • Education

    • University of Institute Mara Technology ( U.I.T.M)

      1988 - 1992
      Diploma In Engineering Electrical and Electronics Engineering

      Activities and Societies: Head of Sport Society Ketua Biro Sukan

    • University of Institute Technology Mara ( U.I.T.M )

      1988 - 1992
      Kejuruteraan Electrik Power Engineering

      Activities and Societies: Sports - Football and Sepaktakraw Ketua Biro Sukan Jabatan kejuruteraan . di U.I.T.M Arau

  • Experience

    • SONY (M) Sdn Bhd

      May 1993 - May 1995
      Senior Technician

      1. Organize & Plan preventive maintenance schedule for Technician.2 .Report and compile down time for machine loss time with corrective action.3 .Monitoring & Controlling machine Spare part .4 Improve and modification current jig design in order to improve model change time.5 .Repairing electrical and electronic equipment in main assembly line.

    • Samsung Display (M) Sdn Bhd

      May 1995 - Feb 2006
      Senoir Engineer

      1. Execute new model transfer from oversea Plant to Malaysia, 2 .Plan & Organize continuous improvement on machine performance .3. Analysis new & Existing line process and implement new manufacturing concept to improve daily production target.4 .Conduct training to te for Engineering Department.5 .Work with HQ support staff any new model from Pre Production until Mass Production.6. Upgrading machine realibility and data input accuracy in line assembly Show less

    • INGRESS ENGINEERING SDN BHD

      Jul 2007 - Sept 2010
      Electrical Engineer

      1 Liaise directly with R & D department ( Proton) e.g receive CATIA drawing and evaluate drawing base on customer specific requirement.2. Identify component part to prepare Wire List & Item List then specify material usage to generate B.O.M. .3. Identify local Material & Oversea ( Supplier Quotation ) to estimate raw material cost and purchase part cost.4 Estimate cost for Tooling/Applicator, Assembly Jig & Checkers Fixture to be Calculate the amortization cost.5. Estimate Manufacturing cost, Packing & Transportation Cost base on process time cycle Each RFQ part No for wiring harness6. Prepare Selling price then present to the Top Management for Final approval before submit quotation to customer.7. Front line person to attend meeting with customer anything related to Product Development8. Prepare Component List of Wiring Harness Data base according to specify location, material part no , and child part state on customer drawing.9. Ensure product fulfill Customer Quality Standard ISO 9001:2000/TS16949 -2002.10. Participate on VAVE opportunity discussion with Proton R & D and proposed valuable product range from design house. Show less

    • MCIS Safety Glass Sdn Bhd | Negeri Sembilan, Malaysia

      Sept 2010 - Sept 2014
      Engineering Section Head

      1 Responsible to all equipment and machinery at prod floor include building maintenance and repair work M & E facilities2 Issue Purchase Request to order machine spare part and update Engineering Spare part stock list3. Monitoring daily technician routine job , sharing and discuss with them through Kaizen activity to improve machine performance to optimum level4 Prepare monthly preventive maintenance schedule and do breakdown analysis to identify rootcause and concrete solution in order to reduce machine breakdown time. 5. Prepare Proposal to the management in Value Added Value Engineering (VAVE ) programme Show less

    • Jati Beringin Sdn Bhd

      Sept 2014 - Jul 2015
      Bussiness unit manager

      1. Lead project to construct & built National Honda Convention Hall 2014 and Expand WareHause Factory in Nilai .2. Prepare new business product costing once receive drawing from Customer to estimate Raw material cost, manufacturing cost , tooling cost and other cost for RFQ before submit to customer3 Support sales team related to the technical issue.

    • PK Agro Industrial Produk (M) Sdn Bhd

      Oct 2015 - now
      Project Manager

      Monitoring main con & sub contractor daily work progress .in order project timeline on track,Weekly update on site progress report then submit to Astt Vice Presiden

  • Licenses & Certifications

    • NTSP (Niosh Tenaga Safety Pasport )

      NIOSH Certification Sdn Bhd (NCSB)
      Apr 2014
  • Volunteer Experience

    • AJK Surau

      Issued by Taman Perumahan
      Taman PerumahanAssociated with Muhadhir Baba