Kanat Jumaliyev

Kanat Jumaliyev

Followers of Kanat Jumaliyev455 followers
location of Kanat JumaliyevKazakhstan

Connect with Kanat Jumaliyev to Send Message

Connect

Connect with Kanat Jumaliyev to Send Message

Connect
  • Timeline

  • About me

    Lead Production Technologist. Production Technology Discipline Technical Authority level TA-2.

  • Education

    • Kazakhski Politechnicheski Institut named after V.Lenin

      1986 - 1993
      Bachelor's degree Petroleum Engineering 4.1
  • Experience

    • OzenMunaiGas

      Nov 1993 - Jun 2002

      Delivered unit production target. Carried out Integrated Field development Planning, production optimization. Oil production was approx. 12,000 tons of oil. Supervised operations from the wellhead , through oil & gas gathering systems to oil & gas separation facilities. Operated more than 350 wells including artificial lift (Gas Lift /Sucker Rod Pumps). Monitored daily operational and field maintenance activities. Carried out well optimization (gas lift, beam pump), well surveillance, production planning and production operation. Carried out completion design for sucker rod pumps and gas-lift wells. Well performance analysis. Prepared well proposals for the well intervention and accept after the intervention (down hole pump replacement, others).

      • Head of Production Operation Units (CDNG2 & CDNG8)

        May 2000 - Jun 2002
      • Senior Production Technologist

        Nov 1993 - May 2002
    • AgipKCO

      Jun 2002 - Jun 2007
      Project Engineer

      Contributed for delivery Wellhead island design, project engineering & construction (EP Offshore), reviewed P&ID from Wellhead to choke, annulus bleed down system. Provide technical solutions to potential problems to improve well integrity set up well annulus blowdown system, double barrier approach on well, wellhead growth monitoring. Worked on different locations Milan, Atyrau, including offshore. Involved with Veritas for well barriers.

    • KMG Kashagan B.V.

      Jun 2007 - Mar 2010
      Senior Engineer

      Carried out technical review of North Caspian Project Operator’s Yearly Worked Program and its Budget. Prepared the recommendations on submitted programs. Provided technical advice on well technology application. Networking with technical experts from ExxonMobil, Shell, Eni, Total, Inpex and ConocoPhillips to continuous technical development and advancement. Seek for best technology. Participated in initiatives by regulatory bodies in drafting Republic requirements and rules for oil and gas operation. Provided technical coaching to young colleagues, which included review and tracking of Individual Plan and leadership coaching. Show less

    • North Caspian Operating Company N.V. (NCOC N.V.)

      Apr 2010 - now
      Lead Production Technologist

      Production Technology TA-2.Providing leadership in Well Integrity for Kashagan highly sour (H2S and CO2) and high pressure wells. Carrying out tracking Kashagan well integrity (Well barriers compliance, maintenance schedules, Technical Reviews for failed tests, annulus pressure investigation, etc.) to comply with Company Well Failure Module in electronic system (eWIPS). HBA check up. Custodian of Kashagan WFM, Annulus Pressure Management Manual, WIMM, and for well MAASP calculation. Build up well models (Prosper), and Well Operating Envelope. Participated in tubing & casing stress analysis. Provided leadership in initiating the modification for flawless production of remote located unmanned island wells. Proactively identified technical requirements for Kashagan well completion based lessons learned. Provided technical solution for well completion design optimization for open hole with stand-alone screen for both gas-lift producer and water injector wells. Skin estimation (Sand Control) for sandstone reservoir. Calculation required gas injection volume for gas-lift wells. Carried well and reservoir performance analysis on quarterly basis. Visited offshore installations for well initial start-up activities, site survey, and wellhead inspections once per quarter basis. Provided technical coaching to the colleagues (well surveillance, well model, WI, APM, TR, etc.). Work with software Prosper, PI (process book), and WellCat. Provide input for Integrated Activity Planning to minimize production deferment during carrying out well preventative maintenance as part of WRFM process. Maintain external and internal networking with technical experts for well integrity and well stimulation. Participated in drafting technical standards (country regulatory), and yearly report with local regulatory. Show less

  • Licenses & Certifications

    • IPSM Basic

      Petroleum Experts
      Nov 2013
    • PT-200 Production Technology (Houston, USA)

      Shell
      Dec 2018
    • PT-100A Production Technology FC, Rijswijk, the Netherland, 2013

      Shell
      Oct 2013
    • PT-100B Production Technology (Houston, USA)

      Shell
      Sept 2015
    • BOSIET

      YKK Kazakhstan
      Feb 2016
    • UB03 Managing the Upstream Business

      Shell
      Nov 2011