RENATO BASTOS VIEIRA DA FONSECA

RENATO BASTOS VIEIRA DA FONSECA

Civil Engineer Intern

Followers of RENATO BASTOS VIEIRA DA FONSECA2000 followers
location of RENATO BASTOS VIEIRA DA FONSECASão Paulo, São Paulo, Brazil

Connect with RENATO BASTOS VIEIRA DA FONSECA to Send Message

Connect

Connect with RENATO BASTOS VIEIRA DA FONSECA to Send Message

Connect
  • Timeline

  • About me

    Construction Manager at Crasa Infraestrutura

  • Education

    • Universidade Federal do Ceará

      1999 - 2003
      Bachelor of Engineering - BE Engenharia Civil
  • Experience

    • Consórcio QGCC - Queiroz Galvão / Camargo Corrêa

      Jan 2000 - Dec 2003
      Civil Engineer Intern

      Metrô de Fortaleza - Trecho Sul

    • EIT - Empresa Industrial Tecnica S/A

      Jan 2004 - May 2010

      Planning CoordinatorMÁRIO COVAS RING ROAD – SOUTH AREA – LOT 3 (São Paulo – State of São Paulo)Works and construction services of the South Area of the Mário Covas Ring Road, between BR-116 Régis Bitterncourt Highway and access to Avenue Papa João Paulo XXIII, in the City of Mauá, covering the lot 3. It were implanted 6 km to the main road and 20 km of branches and margin roads in the interchange with the Imigrantes Highway. Nineteen bridges and overpasses, including two bridges over the Billing reservoir, of 1,750 meters of extension each, executed by the balanced cantilever method (precast). Show less

      • CIVIL ENGINEER

        Jun 2006 - May 2010
      • Planning Coordinator

        Jan 2006 - Jun 2006
      • Engineering Coordinator / Planning

        Feb 2005 - Jan 2006
      • Engineering Coordinator / Planning

        Jan 2004 - Feb 2005
    • Construtora Queiroz Galvão Brasil

      May 2010 - Aug 2018

      Contract ManagerTOMOIOS HIGHWAY (Caraguatatuba – State of São Paulo)Construction and implementation of the new road for the duplication of the mountain area of the SP 99 - Tamoios Highway. The works contemplate the implementation of 21.5 km of new roads, which 12.8 km are road tunnels and 2.65 km of bridges and overpasses.Employer: CONCESSIONÁRIA TAMOIOSContract Value: R$ 2.1 billion (U$ 525 MM)Main Responsibilities:Responsible for the contract management in the EPC modality, covering all the intricacy of an enterprise management of the underground and overpasses works, implanted on the protection area of the State Park Serra do Mar. Show less Contract Manager / Project Commercial ManagerSÃO PAULO METRO – LINE 6 – ORANGE (São Paulo – State of São Paulo)The LINE 6 will be integrated to the subway transportation network of the Metropolitan Region of São Paulo, being a line with 15.3 km, covering fifteen underground stations, seventeen ventilation shafts and emergency exits and rail yard and maintenance facility.Employer: CONCESSIONÁRIA MOVE SÃO PAULOContract Value: R$ 8.1 billion (U$ 2,05 BILLION)Main Responsibilities:• Commercial area management, responsible for the hiring of third party services (Outsourcing), supplies and equipment provisions;• Negotiation and hiring of R$ 250 million (U$ 65 MM) in provision contract of equipment of national and international suppliers; Main contracts: * 2 Tunnel boring machines (TBM) – origin: France / China * Conveyor Belts System – origin: Switzerland * Multi-Service Vehicle (MSV) for Tunnel – origin: France * Plant for precast segments – origin: France• Service hiring management and property acquisition with fiscal benefits (REIDI); • Cost Management, responsible for the control of the direct and indirect costs and budgets;• External Legal Office and Contractual Administration Team Management, responsible for the accompaniment of the contract (EPC) and Claims elaboration;• Representative of the company in the EPC consortium; Show less Contract Manager / Engineering Project ManagerSÃO PAULO METRO – LINE 5 – LILAC – LOT 7 (São Paulo – State of São Paulo)Lot 7 of the Line 5 of the São Paulo’s Subway with 5.7 kilometers of extension, two underground stations (Santa Cruz and Chácara Klabin), three ventilation shafts and emergency exit (Botucatu, Jorge de Melo and Dionísio da Costa), 4.9 km single-tube double-track tunnel excavated with an EPB-shiled of 10.58 m diameter and superstructure implementation of permanent way.Employer: COMPANHIA DO METROPOLITANO DE SÃO PAULO – METRÔContract Value: R$ 1.3 billion (U$ 325 MM)Main Responsibilities:• Technical Team management responsible for the analysis, development and detailing of the civil design and of the permanent way;• International consultants management responsible for the EPB-TBM excavation parameter and analysis of performance during construction; • International consultant management responsible for the design of the precast segments (the final tunnel structure);• Technical meeting with the employer;• Planning Team Management responsible for the physical progress control of the contract;• Representative of the company in the consortium; Show less Engineering Manager / CommercialSANITARY LANDFILL - CENTRAL DE TRATAMENTO DE RESÍDUOS LESTE – CLT (São Paulo – State of São Paulo)Execution of construction works in the sanitary landfill denominated Central de Tratamento Leste – CLT, consisting of earthworks services, deep and superficial drainage, paving, engineering structures, stream channeling.Employer: ECOURBISContract Value: R$ 70 million (U$ 17,5 MM)Main Responsibilities:• Technical Team Management responsible for the analysis, development and detailing of the civil design;• Planning Team Management responsible for the cost control and for the physical progress control of the contract;• Technical Team management responsible for management of subcontractors; Show less

      • Contract Manager

        Jul 2017 - Aug 2018
      • Contract Manager / Project Commercial Manager

        Jun 2014 - Jul 2017
      • Contract Manager / Engineering Project Manager

        Dec 2010 - Jun 2014
      • Engineering Manager / Commercial

        May 2010 - Dec 2010
    • Crasa Infraestrutura

      Apr 2019 - now

      SÃO PAULO METRO – LINE 2 – LOT 2 (São Paulo, Brazil): Lot 2 of São Paulo METRO – Line 2 with 6,5km, 2 underground stations, 6 ventilation shafts and emergency exit, 5,7km single-tube double-track tunnel. Contract Manager | Engineering Project ManagerTechnical and economic feasibility studies for the interconnection between Highway SP-150 and Highway SP-055 (Santos - Guarujá Bridge)

      • Diretor técnico

        Sept 2023 - now
      • Superintendente de Obras

        Oct 2022 - Sept 2023
      • Contract Manager

        Aug 2020 - Oct 2022
      • Contract Manager

        Apr 2019 - Aug 2020
  • Licenses & Certifications

    • TOEFL iBT (Total Score = 94)

      The TOEFL® test
      Mar 2019