PK BISHAWJIT

Pk bishawjit

bookmark on deepenrich
location of PK BISHAWJITDhaka, Bangladesh
Followers of PK BISHAWJIT353 followers
  • Timeline

  • About me

    Assistant Engineer at Energyprima Limited | 50 MW Gas Power Plant

  • Education

    • North south university

      2013 - 2019
      Bachelor of science - bs electrical and electronics engineering

      RESEARCH PROJECTCell Phone and Wi-Fi weak signals to stronger signals booster:Cell Phone and Wi-Fi Signal Boosters are devices that amplify existing weak signals to stronger signals.Project Duration: 4 months.Long Distance Wireless Charger By Using Sound Energy:Waste form of sound energy can be used for some creative purpose. Project Duration: 12 months.

  • Experience

    • Freelance photography

      Jan 2016 - May 2019
      Freelance travel photographer and explorer

      I started as a photographer from 2016 and began traveling solo around Asia and documenting my journey through my photograph and my writing and that was where it all began. Fast forward to today, I am now a photographer and a solo traveler. I tell my travel stories through a combination of award-winning travel photography and immersive writing all in one. I travel solo most of the time, photographing interesting things in front of me. Even though I am very flexible, I always tend to go to places with stunning mountain ranges and places nobody goes to. All in all, I like to go where the adventures are and I don’t mind getting my hands dirty to get to it. Show less

    • North south university

      May 2019 - Aug 2019
      Engineering internship at power substation

      Worked under the supervision of expert engineers at the substation of North South University. 4 months of intense training on Gas(3*4.2KW)/Diesel Generators, PLC, DESCO supply, PFI, Transformers, ACB, VCB, HT/LT Room, AC Chillers, firefighting system, Distribution.

    • Newsbangla24.com

      Jan 2022 - May 2022
      Assistant social and visual media editor
    • Energyprima limited.

      Jul 2023 - now

      ° Monitor the operation of electrical equipment such as generators, transformers, switchgear, and control systems.° Collaborate with senior engineers to optimize power plant performance and engineers are instructed on detecting deviations. ° Coordinate with maintenance teams to ensure timely and effectiverepairs. ° Active involvement in optimizing performance through data analysis, troubleshooting technological issues, and preparing for emergency responses. 50MW Gas Power Plant.1) Performed duty as Shift engineer2) Managing operators and distributing duties among six powerhouses.3) Any alarm or trip message reported immediately to the concerned department4) Instructed the sub-assistant engineers on how to monitor the parameters of the engines and let know if any deviation occurs.5)Communicate with NLDC via walkie-talkie for engine loading and unloading.

      • Assistant Engineer

        Jan 2024 - now
      • Sub Assistant Engineer

        Jul 2023 - now
  • Licenses & Certifications

  • Honors & Awards

    • Awarded to PK BISHAWJIT
      PCB Designing WIE Affinity Group , IEEE Bangladesh Section and WIE Affinity Group, IEEE NSU Student Branch. Jul 2016
    • Awarded to PK BISHAWJIT
      MATLAB WIE Affinity Group , IEEE Bangladesh Section and WIE Affinity Group, IEEE NSU Student Branch. May 2016
  • Volunteer Experience

    • Team Lead Manager

      Issued by Duronto Social & Cultural Organization on Dec 2010
      Duronto Social & Cultural OrganizationAssociated with PK BISHAWJIT
    • Mathematics Teacher at nonprofit organization

      Issued by Street Children School on Jan 2020
      Street Children SchoolAssociated with PK BISHAWJIT