Ray Kelly

Ray Kelly

Electrical Engineering Manager

location of Ray KellyBeaver Falls, Pennsylvania, United States

Connect with Ray Kelly to Send Message

Connect

Connect with Ray Kelly to Send Message

Connect
  • Timeline

  • About me

    Engineering Manager - PMP, MBA, MSEE

  • Education

    • Youngstown State University

      -
      Master of Science - MS Electrical Engineering
    • Youngstown State University

      -
      Bachelor of Engineering, Electrical Engineering
    • Youngstown State University

      -
      MBA Management Concentration
  • Experience

    • The Conair Group

      Jan 1993 - Mar 2000
      Electrical Engineering Manager

       Coordinated custom automation control system design and installation to ensure adherence to scope, schedule, and budget. Designed microprocessor-based electronic products including involvement from conception to market introduction while maintaining consistency of designs for international markets. Developed and provided customer training workshop for proper drying of hygroscopic resins. Provided technical support for manufacturing, marketing, purchasing, sales, quality, and service departments. Negotiated research contract and became liaison for Penn State University Research Affiliation Agreement. Prepared, submitted, and was successfully awarded 2 Ben Franklin Technology Partnership research grants in coordination with Penn State University. Show less

    • INNOVATIVE CONTROLS INC

      Mar 2000 - Jan 2002
      Engineering Manager

       Managed product development and manufacturing of electronic and electro-mechanical devices for a fire apparatus and medical equipment supplier. Researched, developed, installed, and supervised through certification the first production line at Innovative Controls to meet Health Care Industry Good Manufacturing Practices requirements. Planned all technical aspects for product development including design, development, analysis, prototyping, manufacturability, and test. Performed hardware and embedded software design and testing for micro-controller based products. Identified and developed technologies used in new products. Developed customer support documentation for the proper installation and use of level gauges.  Developed new product specifications based on marketing requirements. Show less

    • Cannon USA

      Jan 2002 - Apr 2004
      Project Manager

       Managed multiple automation projects between $25,000 and $3.5 million from sales release through final installation and customer acceptance. Developed Engineering Specifications, Risk Assessments, and Functional Test Specifications for the safe use of flammable hydrocarbons in industrial polyurethane processing. Acted as single point of contact for customer, resolving all contract issues while assuring customer satisfaction. Developed and conducted custom training programs for the safe operation and maintenance of polyurethane storage and processing equipment using flammable blowing agents. Coordinated purchasing, manufacturing, testing, documentation, and installation to ensure that the custom equipment was produced, installed, and operating in compliance with contract requirements. Contracted vendors local to customer sites as needed. Show less

    • Permanent

      Jan 2005 - Nov 2006
      Cognizant Engineer

       Developed instrumentation and control systems for electric power distribution systems. Prepared system performance and test specifications, approved supplier designs, provided engineering follow through to manufacturing, test, installation, and resolution of system problems. Interfaced directly with customer to gain approval for proposed activities. Conducted validation/verification of any changes to user documentation. Provide support at manufacturing site as needed. Served as Safety Committee representative and conducted monthly preventative audits. Show less

    • Ibis Tek, LLC

      Nov 2006 - Mar 2012
      Vice President of Engineering

      Lead multi-disciplined engineering teams designing, developing, and documenting security vehicles and lighting products. Developed plans, schedules, budgets, and procured prototypes for new product development activities. Identified and developed technologies to be used in new product development projects. Designed, developed, and released to manufacturing, four new security vehicles in four years. Developed electrical installation department capabilities and successfully won electrical retrofit contract from incumbent. Redesigned lighting products to meet military EMI, shock, and vibration requirements. Coordinated with Optical Engineers to develop first of its kind LED lighting products to replace HID based products. Primary point of contact with customer communicating needs to other managers and departments within the organization. Show less

    • The Conair Group

      Mar 2012 - Feb 2018
      Vice President of Engineering

       Establish, justify, and implement strategies, detailed plans, schedules, and budgets for new product development using Stage Gate process. Coordinate multi-disciplined and multi-location 20 person engineering department designing, developing, and documenting auxiliary equipment for the plastics injection molding, blow molding, and extrusion industries. Coordinate purchasing, product management, manufacturing, marketing, sales, service, quality assurance, and engineering departments for product development and introduction activities. Implemented Controls Platform Hardware and Software standardization program enhancing efficiency in design, support, and component cost.  Develop staff through coaching, training, and professional growth opportunities. Coordinate Lean Process Improvement and Variable Cost Savings activities with other departments saving in excess of $1 million annually. Coordinate all intellectual property matters with Legal Teams. Manage new product development lab prototyping and testing activities. Coordinate engineering department activities with joint venture located in India. Show less

    • Permanent

      Jan 2019 - now
      Project Engineer

       Develop instrumentation and control systems for electric power distribution systems. Prepare system performance and test specifications, approve supplier designs, provide engineering follow through to manufacturing, test, installation, and resolution of system problems. Interface directly with customer to gain approval for proposed activities. Conduct validation/verification of any changes to user documentation. Provide support at manufacturing site as needed.

  • Licenses & Certifications

    • Project Management Professional

      Project Management Institute
      Feb 2011
    • Lean Certification Program

      Catalyst Connection
      Dec 2010
    • Innovation Management Maturity Model Certified Professional

      Total Innovation Management Foundation
      Jun 2014