Alex Zaharia

Alex zaharia

bookmark on deepenrich
Followers of Alex Zaharia155 followers
  • Timeline

  • About me

    Project Manager

  • Education

    • "dunarea de jos" galati

      2010 - 2012
      Master of engineering (m.eng.) renewable sources of energy, electrical engineering
    • Aalborg university

      2009 - 2010
      Master of engineering (m.eng.) wind power systems

      Exchange Student

  • Experience

    • "zaharia gheorghe family association"

      Jul 2006 - May 2007
      Industrial and domestic electrical installation designer

      designing and help installing Industrial and Domestic Electrical Installation by the deadline applied to each client

    • "globo shipping"

      Jul 2007 - Sept 2008
      Naval designer

      designing Naval Electrical Installation

    • Carnival cruise lines

      Apr 2012 - May 2015
      Stage/rigg automation engineer

      Maintanance and trouble shooting of the automated systems both on stage & backstage (lifts, revolves, drops, curtains, positional encoders, safe edges, motion control computers, logic cards)Operating automated platforms Mechatronics and TAIT.

    • Royal caribbean cruises ltd.

      Jun 2015 - Oct 2018

      Running the production shows, managing a technical and production team of 30 people. Operating, reprogramming and troubleshooting (both mechanical and electrical failure) off all the automated equipment controlled by a hybrid version of CAT 192B (Computer Aided Theater) by Waagner Biro connected to 6 industrial IRC5 ABB assembly line robots. trouble shooting, maintaining and operating automated systems such as Foy Flying Systems and Mechatronics. Inspection of underwater mechanisms and high altitude flying equipment.

      • Stage & Production Manager / Head of Automation

        Jan 2016 - Oct 2018
      • Rigging Specialist

        Jun 2015 - Jan 2016
    • Arcelormittal

      Mar 2018 - Jan 2019
      Senior industrial automation engineer

      I am part of an upgrade team in charge of the Steel Melting Shop production line. We are modelling and implementing new automated equipment with PLC control protocol (Step 7 Ladder programming), on call and remote access troubleshooting 300Ton Automated Jaso Cranes

    • Royal caribbean cruises ltd.

      Jan 2019 - Oct 2020
      Project manager

      Dry dock entertainment operations Project Manager leading the show installs in highly automated theaters and offering technical support and expertise on all safety aspects of automated and computer aided equipment.

    • Virgin voyages

      Oct 2020 - Feb 2024
      Drydock new build inspector

      Commissioning of all LES related equipment and following the installation process according to the owner standards.Managing the subcontracted teams engaged in power installation, populating electrical cabinets, connection panels, control and safety systems, automated equipment and lighting rig. Liaise between Fincantieri's shipyard management and the subcontracted Project Managers to execute and comply with the project's delivery date.

    • Kaufland romania & moldova

      Feb 2024 - now
      Project manager
  • Licenses & Certifications

    • Foy flying systems rigger

  • Honors & Awards

    • Awarded to Alex Zaharia
      1st Mention at the International Students Science Fair with the paper “The Analysis and Simulation of a Photo Voltaic System" Universitatea Dunarea de Jos Galati May 2011
    • Awarded to Alex Zaharia
      1st Mention at the Students Science Fair with the paper "THE PRESENT AND THE FUTURE OF THE WAVE ENERGY". Universitatea Dunarea de Jos Galati May 2008
  • Volunteer Experience

    • Volunteer

      Issued by Societatea Romana de Combatere a Cancerului on Jul 2008
      Societatea Romana de Combatere a CanceruluiAssociated with Alex Zaharia