Kiran Jadhav

Kiran Jadhav

GET

Followers of Kiran Jadhav164 followers
location of Kiran JadhavChennai, Tamil Nadu, India

Connect with Kiran Jadhav to Send Message

Connect

Connect with Kiran Jadhav to Send Message

Connect
  • Timeline

  • About me

    Deputy Chief Engineer I Commissioning and Plant Operation

  • Education

    • University of Pune

      2001 - 2004
      Bachelor of Engineering (BEng) Chemical Engineering First Class
  • Experience

    • Pearl Engineering and Polymers Limited

      Oct 2004 - Jun 2005
      GET

      Reduction in batch time to increase the yield.

    • GARDEN SILK MILLS LTD

      Jul 2005 - Jul 2006
      Engineer

      Involved in Plant commissioning, pre-commissioning and startup activities of PET plant.Successfully commissioned and startup many systems (conveying, HTF heaters, Esterification reactor, Glycol system, Slurry system, Pellet cutter system,etc.) in plant.

    • Rajashree Polyfil limited

      Aug 2006 - Jun 2007
      Engineer

      PET plant Engineer. Developed the system to minimise human interventions and production interruption.Utilisation of non utilised assets of plant.

    • Reliance Industries Limited

      Jan 2007 - Jan 2012
      Manager

      • Monitor, maintain, control and analyze various process parameters on DCS (ABB-Advant 500) for smooth operation of plant. • To ensure targeted quality and quantity production of various grades as per production plan.• To guide and lead the field executives and panel officers during various plant activities.• To ensure proper implementation of EHSS during day to day activities, shutdown and slow down.• To lead the shift group during routine shift activities, shutdown and slow down.• Initiated JSA for plant SOPs.• Conduct Mock drills for various scenarios.• To ensure compliance to SOP, PSM and work instructions to achieve the plant objectives and KPI.• Coordination with service departments for job planning and execution.• Manpower handling and Training.Work experience in the following areas of plant• Purification Area: Distillation column, Adsorption beds, Reciprocating and Diaphragm type of compressors, high speed centrifugal pump, metering pumps, TEAL dosing and flare system.• Reaction Area: Fluidized bed reactor, catalyst dosing system, cycle gas compressors (1.2 MW, 2.2 MW and 6.6 MW capacities), product discharge system (Dense phase conveying).• Finishing Area: Two Extruder units (ZSK-300, 4.7 MW and 30 TPH capacities) and pelletizers, Master Mix additive system, Pellet Conveying (Lean and dense phase).• Vent Gas Recovery Area: Three stage compression system (1.2 MW, 8 TPH capacity) for propylene monomer recovery, distillation column, Auto refrigeration system and heat exchangers.• Induced draft Cooling tower. Show less

    • SABIC (Yanbu National Petrochemical Company)

      Aug 2012 - Nov 2020

      Key Result Areas: To prepare and validate the monthly production plan & ensure production of different grades as per plan to achieve maximum accuracy. Set the guidelines & instructions for shift supervisor & provide the expertise during shut down/slow down/startup/upset. Lead the TIR, plant upset investigations and implement the recommended actions. System owner for MOC, PHA, RCA, Suggestions and ERT. Responsible for ON Call duty, which is intended to guide shift crew during plant upset in silent hours. Leading achievement of key business metrics (EHSS, quality, productivity, cost, Code of ethics, Etc.) Material management for uninterrupted operation of plant. Deliver the inputs for daily and shutdown maintenance plan to ensure maximum plant Reliability. Lead and part of the team of multinational employees.Highlights: Involved in Technical study to increase plant capacity from 50 TPH to 65 TPH and further to 70 TPH. Accomplished the successful and stable run for TINO and CONSISTA catalyst. Part of a Team involved in purification area feasibility study. Show less • To prepare the competencies and learning interventions for different job positions in organization.• To prepare the individual development plan (IDP) based on competency gap analysis and training need analysis.• Assign the trainings in Learning management system (LMS) to ensure compliance of IDP plan.• Prepare the operation training modules, training material, test and assignments for different areas of plant like Purification, Reaction, VGR and Finishing• Initiated On Job field training for operators, Engineers and new employees.• Involved in technical study to increase plant capacity from 50 TPH to 65 TPH and further to 70 TPH.• Team member of quality circles for cost saving.• Prepare the employees to handle the assigned task independently by training and coaching as per Job Qualification Program (JQP). Conduct the evaluation of employee for area qualification.• To provide the ILT trainings for Management systems, SHEM standards, SOPs, etc.• Responsible for SOP, Work instructions, shut down procedures and PID preparation and review.• To assist shift supervisor and provide the expertise during shut down and slow down activities.• Responsible for ON Call duty which is intended to guide shift crew during plant upset in silent hours.• System owner for Suggestions, Plant upset report, Plant business objectives, ERT, etc. Show less

      • Production Engineer

        May 2014 - Nov 2020
      • Sr. Process Trainer, Polypropylene.

        Aug 2012 - Apr 2014
    • Saipem India Projects Limited

      Nov 2020 - Mar 2023
      • Sr. Principal Engineer

        Nov 2020 - Mar 2023
      • Sr. Principal Engineer

        Nov 2020 - Mar 2023
    • Saipem

      Apr 2023 - now
      Deputy Chief Engineer
  • Licenses & Certifications

    • NEBOSHI IGC

      NEBOSH
      Dec 2021
  • Honors & Awards

    • Awarded to Kiran Jadhav
      Emergency Response President Yansab Dec 2018
    • Awarded to Kiran Jadhav
      Sustainability Initiative CEO SABIC Mar 2017 Awarded by CEO of SABIC for successful accomplishment related to sustainability.
    • Awarded to Kiran Jadhav
      Cost Saving President Yansab Feb 2016 Cost Saving Idea in terms of raw material saving.