Pravin M Bhusani

Pravin m bhusani

bookmark on deepenrich
location of Pravin M BhusaniHyderabad, Telangana, India
Phone number of Pravin M Bhusani+91 xxxx xxxxx
Followers of Pravin M Bhusani75 followers
  • Timeline

    Aug 2007 - now

    Head Of Engineering Department

    Dr. Reddy's Laboratories
    Visakhapatnam, Andhra Pradesh, India
    Aug 2014 - Aug 2014

    Process Engineer

    Cheryl Garcia & Company
  • About me

    Site Engineering head - Formulations OSD at Dr. Reddy's Laboratories

  • Education

    • College of engineering & technology, akola.

      1998 - 2001
      Bachelor of technology - btech chemical engineering first class with distinction
    • Svkm's narsee monjee institute of management studies (nmims)

      -
      Master of business administration - mba operations management
  • Experience

    • Dr. reddy's laboratories

      Aug 2007 - now

      Work experience in USFDA, MHRA, WHO approved manufacturing Facilities.Successfully faced regulatory audits of USFDA, MHRA and ANVISA.Implement and ensure GEP and GMP regulations as per the Guide lines and ensure all time audit compliance.To implement and encourage Autonomous Way of Work (AWW).To implement and encourage Total productive maintenance. (TPM)To ensure Maintenance of Blister packing machines and Wallet sealing machines.To ensure Maintenance of Cartonator and case packer.To ensure Maintenance of Granulation line equipment like RMG, FBE, Blender, Etc.To ensure Maintenance of Encapsulation machine and Medicament Manufacturing vessels To ensure Clean room conditions with EMS and BMS System.To ensure Operation and maintenance of Purified and potable Water system and HVAC system.To ensure Operation and maintenance of Electrical installations e.g. Transformer, MCC and PCC panels. Annual budgeting for the operational expenses based on the trend analysis with forecasting and controlling the expenses within the approved budget.To maintain and improve Overall Equipment efficiency.Ensure Zero Audit observations by encouraging Right first time and Quality By design.Conservation of Fuel, power and water to its optimum possible levels by implementation of energy conservation measures. Enhancing the use of automation and mechanization for optimising the resources and operation of the plant.Implementing and practicing the Jishu Hozen (JH) Autonomous maintenance.Implementing and practicing the Manager Model area (MMA).Maintaining the Equipment upkeep by Predictive and preventive maintenance of all clean utilities and process equipment.Implementation of 5S for Engineering spares.Encourage the new initiatives like Augmented reality (AR) and virtual reality (VR) solutions. Analyse root cause of Equipment and System problems and recommend technical solution Ensure Incidents and CAPA closureInventory management Show less

      • Head Of Engineering Department

        Sept 2016 - now
      • Head Of Engineering

        Aug 2007 - Mar 2022
    • Cheryl garcia & company

      Aug 2014 - Aug 2014
      Process engineer
  • Licenses & Certifications

    • Green belt certification (gb)

      Dr. reddy's laboratories
      Mar 2021