Radhakrishna Yelamanchili

Radhakrishna Yelamanchili

Student Assistant, Manufacturing Systems laboratory

Followers of Radhakrishna Yelamanchili811 followers
location of Radhakrishna YelamanchiliRedmond, Washington, United States

Connect with Radhakrishna Yelamanchili to Send Message

Connect

Connect with Radhakrishna Yelamanchili to Send Message

Connect
  • Timeline

  • About me

    Sr. Technical Program Manager at Microsoft

  • Education

    • Pondicherry University

      2004 - 2008
      Bachelor of Science Mechanical Engineering
    • The University of Texas at Arlington

      2008 - 2011
      MS Industrial Engineering

      Explored the maximum ways Lean Techniques and Six Sigma Techniques are used in the field of Logistics so as to get maximum efficiency with the given input and available resources. Logistically re-routed the campus mailing route structure using the Master Scheduling and Just in Time principles for enabling faster delivery and easier sorting of the campus USPS mail room on campus at The University of Texas at Arlington Applied appropriate human factors & ergonomic criteria, tools, and… Show more Explored the maximum ways Lean Techniques and Six Sigma Techniques are used in the field of Logistics so as to get maximum efficiency with the given input and available resources. Logistically re-routed the campus mailing route structure using the Master Scheduling and Just in Time principles for enabling faster delivery and easier sorting of the campus USPS mail room on campus at The University of Texas at Arlington Applied appropriate human factors & ergonomic criteria, tools, and processes to evaluate equipment design throughout the product development process and have recommended design improvements to engineers. Also conducted a case study on the interaction between humans and computers at a work place and the factors that affect the work efficiency and has given a detailed report describing the ergonomic failures in a work place in a 8 hr work shift. Show less

  • Experience

    • The University of Texas at Arlington

      Aug 2010 - May 2011
      Student Assistant, Manufacturing Systems laboratory

      Designed the Wheel configuration and the Robot tank for an unmanned space vehicle for the NASA's RASC-AL competition using SolidWorks and Pro Engineer.Logistically re-routed the campus mailing structure for better service and faster mail delivery using the Master Scheduling techniques.

    • Primus International

      Aug 2011 - Sept 2015

       Led the engineering and operations teams to develop and execute a new assembly line for Airbus A330 doors. Enhanced process optimization and developed cost effective processes using lean methodologies and continuous improvements using lean principles (5S techniques). Led the development of new product introduction (NPI) process from concept to First Article Inspection Conducted time studies to understand the bottlenecks in a given assembly process and proposed solutions to reduce the overall Non-Value added time Show less  Was the focal point for all the ECR’s concerning the Airbus A330 door assembly program throughout the product lifecycle. Initiated the RCCA’s at the OEM sites for the recorded failures and was successful in driving them to resolutions to enhance the incoming product quality which enabled in $100k cost savings per year. Responsible for defining the quality requirements for different components from OEM manufacturers and performed inspections and issued SCARs in the event of component failures. Show less

      • Manufacturing Engineering Operations

        Jan 2013 - Sept 2015
      • Manufacturing Engineer

        Aug 2011 - Jan 2013
    • Umbra Cuscinetti Inc

      Sept 2015 - Aug 2017
      Program Manager- Process Engineering

       Lead Kaizen activities(via DMAIC) to ensure continuous improvement in processes, products and raw material. Identified Standard work to develop and implement manufacturing cost initiatives. Planned, coordinated and managed the process to facilitate requirements documentation for a completely new production line. Manage supplier and customer relationships, including monthly business reviews, root cause analyses, postmortems. Developed, maintained and controlled technical interfaces to customers, suppliers and collaborators to ensure effective and swift resolution of technical issues. Show less

    • Amazon

      Aug 2017 - Mar 2020

      Leading product development activities by working alongside the design engineering teams to specify, procure, measure, and build hardware assemblies.Worked with the product development and Research teams to map out the scope, and identify constraints, dependencies, and risks.Worked extensively to build technology (electro-mechanical) that is manufactured at scale to cater to the growing demand by utilizing the DFM protocol.Partnered with multiple stakeholders ( SW, FW, ME design and ID) to define the product features, owned and managed the program schedules and prepared and delivered high quality executive reviews. Show less

      • Technical Program Manager - Amazon Go

        Jan 2019 - Mar 2020
      • Program Manager - Marketplace

        Aug 2017 - Jan 2019
    • Microsoft

      Mar 2020 - now
      Sr. Technical Program Manager, Azure Hardware Manufacturing

      Work with factories to manage and launch NPI programs within the Azure Hardware Organization.Manage CMs to manufacture and deliver Racks and Clusters for NPI programs to cater to the Engineering group requirements to enable more customers perform better and faster.Lead the planning and Organizational Strategy meetings for the VP of Microsoft Devices Manufacturing. Owning high-priority meetings for VP of GMO by structuring the agenda and attendee lists, scoping and reviewing meeting materials, and following up on post-meeting tasks.Lead complex cross functional initiatives and manage the manufacturing operations to deliver the latest Surface devices to the market.Help drive the organizational strategic product launches in the most efficient and timely manner.Working on the company's sustainability goals to reduce the carbon footprint by 2030.Helped launch NPI programs with very healthy yield rates at the start of Mass Production.Worked on Optimization projects to help reduce the BOM cost for the Surface product portfolio. Show less

  • Licenses & Certifications

    • Lean Six Sigma Black Belt

      ETI group
      Sept 2013