MUHAMMAD ASFAR

MUHAMMAD ASFAR

Followers of MUHAMMAD ASFAR11000 followers
location of MUHAMMAD ASFARKarāchi, Sindh, Pakistan

Connect with MUHAMMAD ASFAR to Send Message

Connect

Connect with MUHAMMAD ASFAR to Send Message

Connect
  • Timeline

  • About me

    Deputy Manager Mechanical Maintenance & Projects

  • Education

    • Newport institute of Karachi chartered by Government of Sindh & Recognized By (HEC)

      2009 - 2011
      (B.Tech) Bachelor of Technology. Mechanical Engineering. ''B''
    • Jinnah polytechnic institute Nazimabad Karachi Pakistan

      2001 - 2003
      (D.A.E) Diploma Associate Engineer Mechanical Technology ''B''
  • Experience

    • Karachi Shipyard Engineering Works Ltd

      Mar 2005 - Dec 2005

      Diesel Mechanic & Arc Welding Electric ARC Welding

      • Training

        Jan 2005 - Dec 2005
      • Training

        Mar 2005 - Jun 2005
    • Orient Textile Mile Pvt Ltd

      Apr 2006 - Apr 2007
      Plant Operator Utilities Operation & Maintenance

      ⦁ Kaeser air compressor rotary screw / Oil-free air compressors - Atlas Copco⦁ Cooling tower ( Rectangular & Bottle Types)⦁ HVAC Air handling unit⦁ Centrifugal & Pressure pumps & Globe valve, Get & Butterfly Valves & PRV⦁ Cooling tower (Rectangular & Bottle Types)⦁ Heat exchanger Plate type⦁ Chemical dosing (cooling tower & water tanks)⦁ Maintain log books⦁ I have worked with shut down maintenance team (Power plant ,HVAC plant, Air compressor related all mechanical equipment )⦁ Shut down Maintenance power generation utilities HVAC & MEP Show less

    • Candy Land Ismail Industries Pvt Ltd

      Jul 2007 - Nov 2007
      Shift Supervisor Operation & Maintenance Utilities

      ⦁ Air compressor rotary screw⦁ HVAC Air handling unit⦁ Cooling tower (Rectangular & Bottle Types)⦁ Centrifugal & Pressure pumps & Globe valve, Get & Butterfly Valves & PRV⦁ Heat exchanger Plate type operation & maintenance⦁ Production packing machine repair & maintenance air water steam pipeline⦁ Industrial oven heating controlling and maintenance⦁ Maintain log books

    • Global NDE Services Specialization Non Destructive Testing

      Jan 2008 - Jul 2009
      QC Inspector

      ⦁ Steel Fabrication & Welding Structure, Under Ground Steel Storage Tanks, Pipe as Per WPS.⦁ Inspection of Welding Beads and joints, Defects⦁ Hydro Testing Water / Air.⦁ Sandblasting and Paints Works⦁ Coordinate With Senior and Other Departments.Projects: ⦁ Clint Al Tuwairqui Steel Mile Steel structure (Inspection, NDT)⦁ Clint PAKISTAN STATE OIL .Under Ground Steel Storage Horizontal Fuel Tanks 50,000Liters (Manufacturing & Inspection, fabrication Welding Sandblasting, Paint, Hydro Testing) Show less

    • Pakistan Insulation Pvt LTD

      Jan 2010 - Dec 2010
      Shift Incharge Production & Manufacturing

      ⦁ Fabrication of Steel Structure Rafter, Columns, I & H Beams, H Beam as Per Drawing and Specification.⦁ Inspection Welding and Fabrication & Sandblasting and Paint.⦁ Commissioning and install PFB shad with insulation PU & Rockwool / Glass wool at site.⦁ Production & planning Rock Wool Blanket & Pipe .PU Panel, Pipe & slabs.⦁ Maintenance of Rock Wool Plant Machine furnace & mechanical components, and annual shut down maintenance as per plan

    • S.Zia-Ul-Haq & Sons

      Aug 2012 - Sept 2020
      Section Head QC / SSW

      Lead QC/SSW departments with 10 + members makes all decisions independently. Our organization is largest industrial catering services & steel structure Porta cabin manufacturing company in Pakistan. We facilitated oil gas energy sector civil construction. Functional area steel Porta cabins, Fuel & Water Tanks, Diesel Generator manufacturing PFB shades PU, Rockwool, Kiosk substation (K Electric).Commercial SS equipment kitchen & laundry and some special projects high rise building & Hospitals.QC Works Procedure : ⦁ Received job card from PPC as per client requirements rental & sale basis units⦁ Rental & sale basis units (PDI pre delivery inspection)⦁ New manufacturing units (process inspection every stages ) ⦁ Collected difference in BOQ & Technical Specification, drawings shared & discussed with PPC⦁ Prepared inspection format against job sheet & provided details ⦁ Planning & execution in schedule timeline ⦁ Daily follow up with execution in morning meeting & email ⦁ Discussion with my team members on daily bases related ongoing projects⦁ Outsource activity plan as per management instruction PDI OR (vendor) site ⦁ Developed new formats as per requirement ⦁ Prepared daily weekly monthly progress reports and submit senior managements for annual audit⦁ Grooming new and talented employee as per needs ⦁ Technical employees hiring and testing methods implementation.Projects & Clients:Badar Expo Solutions (IDEAS) ,Krakow Ethiopia, Deutag, IPGDL Hubco ,ENI, BHP, PPL, Shalamberger, OMV ,Saxon Energy ,UEPL, Pakistan Navy, SCHNEIDER ELECTRIC (KE),OGDCL , Exalo drilling, MPCL, ZPEC - Karachi, DUERR KOREA INC. Pakistan State Oil, Pak Suzuki, Yamaha Motor Pakistan, Pak army Quetta ziarat . Show less

    • Utopia Industries Pvt. Ltd.

      Aug 2021 - now

      Job description and responsibilities:Leading the mechanical engineering and project team with independent decision making and technical expertise to resolved the solution.Planning, scheduling execution work to meet the required timeline.Material management estimation control & command.Preparation of BOQ for project and in-house manufacturing.Cost cutting and modification of in-house available material and scrap.Design devolvement and sampling work.Troubleshooting and compliance solved the assignmentEmail correspondence & coordination with the concerned department of all means.Team building and management.Workshop development for team mechanical, maintenance and UtilitiesAssembly line and production floor furnishings item manufacturing.Plant erection & commissioning and project works.Make sure HSE & PPEs procedure for healthy and safe environmentProject details :Piping works (Fire hydrant, Utilities & MEP).MS storage tank 7000 Ltr to 12500 Ltr and also SS tankSolar & wind installation and commissioning.Portable cabins (office & security units )MS shade & MS platform.Emergency exit bridge & safety stairs.GI ducting with cyclone system for sand air collection.Scaffolding design and manufacturing. Show less

      • Deputy Manager Mechanical Maintenance & Projects

        Mar 2024 - now
      • Senior AM Mechanical Maintenance Engineering

        Jan 2023 - Mar 2024
      • Assistant Manager Mechanical Maintenance Utilities & projects

        Aug 2021 - Mar 2024
  • Licenses & Certifications

    • Arc Welding

      Karachi Shipyard & Engineering Works Limited