
Timeline
About me
PMC Construction Area Superintendent at Wood
Education

Scottish qualification authority
1998 - 2000Hnc engineering
City and guilds london institute
1982 - 1986City & guilds part 1, 2 & 3 mechanical engineering
Menzieshill high secondary school
1977 - 1981Engineering
Abertay university
2001 - 2002Level 2 course electro mechanical systems, visual basics & applications of plc's
Experience

Wood
Apr 2001 - Apr 2008EngineerFacilitate development of new repairs from OEM technical documents through to production within budgetary & time constraints. Review and develop material specifications and destructive / non-destructive inspection criteria in conjunction with specialist materials groups and laboratories. Liaison with customer, suppliers, vendors and other specialist groups. Validate component parts and assemblies through engineering process and test. Control / monitor manufacture from construction process through to First Article Inspection Reports (F.A.I.R.) Technical support to supply chain beyond FAIR. Project management and reporting to meet delivery dates within budgetary requirements. Develop / maintain project documentation to comply with company quality standards. Review, design and develop Autocad drawings from CMM data, 3D-models and P & ID’s. Design and manufacture of mechanical components in conjunction with key vendors and other specialist groups. Lihat lebih sedikit

Chevron, sgi/sgp project, tengiz, kazakhstan
Apr 2008 - Nov 2008Mechanical operations isolation authority specialist:Assist design and implementation of mechanical P & ID isolations, Tag Out Lock Out, to facilitate during construction, commissioning and plant shut down activities. Provide technical assistance by preparation of method statements to other disciplines as and when required. Responsible for raising paperwork, registration of isolations, providing and maintaining all associated hardware. Assist in construction and commissioning of Permit To Work documentation and authorization. Liaison with customer, suppliers, vendors and other specialist groups. Take into account all relevant procedures, guidance etc. relating to the discipline, is in compliance with all the Quality Management Systems and Health & Safety Standards. Ensure all assigned project work is carried out i.a.w. agreed budget and schedule. Providing documentation and drawing deliverables on time to meet project deadlines. Take part and contribute to project risk assessments and toolbox talks. Key member of project team ensuring project target and completion of the project are within the budget and schedule. Lihat lebih sedikit

Exxon mobil/ exterren on b.u.e.p. project, cepu, indonesia
Jan 2009 - Jan 2009Mechanical systems supervisorResponsible for overseeing and accepting construction and installation of all Mechanical Equipment (Static and Rotating) on Cepu’s Banyu Urip Early Production Project. This included revision and approval of punchlisting, “A” ITR’s, procedures and method statements, all documentation and inspection reports prior to areas and systems packages being handed over from contractor/vendors. Responsible for carrying out Risk assessments and toolbox talks, ensuring all documentation was compliant before imputing into GOC Certification system, ensuring that safe work practices were adhered to i.a.w. Exxon Mobil/Exterren Area Authority. After construction phase was completed moved into commissioning group as Mechanical Commissioning Engineer prioritising and planning static and dynamic Commissioning activities, raising Permits, clearing all “B” ITR’s, bringing all plant to operating condition prior to handover to Exterren Operations Staff. Monitoring and developing of the punchlisting, pre-commissioning and commissioning activity control. Liaised with contractor's design staff and participate in testing and inspection. Verify and monitor piping design and material changes, P&ID’s and isometrics, ensuring they are properly documented and approved i.a.w. design document specifications. Ensure daily reports produced are accurate and comprehensive as activities, progress and quality issues arise. Lihat lebih sedikit

Exxon mobil/aker on adriatic lng platform, offshore venice, italy
Jan 2009 - Jul 2009Mechanical systems supervisorPart of the commissioning and completions team offshore on the world’s first offshore LNG (Adriatic LNG platform) receiving and re-gasification terminal for Exxon/Aker., duties include supervising a team of technicians during pre-commissioning / commissioning of all utilities/topsides and process plant through to mechanical completion and handover. Monitoring and developing the punchlisting, pre-commissioning and commissioning activities. Supervise contractors using PIMS, QA/QC and Project Management (Engineering Site Query, Job Card, Punch List, etc) with respect to Mechanical Completion Re-instatement within required schedule and budget. Liaise with contractor's design staff and participate in testing and inspection. Lihat lebih sedikit

Sherritt & snc lavalin ambotovy project
Jan 2010 - Jun 2011Mechanical/piping construction supervisorOversaw and monitor all piping and mechanical systems installation, pre and commissioning activities during the refinery construction in Ambatovy to include static and rotating equipment, tanks, vessels, compressors, motors, pumps, agitators and heat exchangers. Created and Lead a punchlist team and ensures all items were completed and documented. Provided focal point for contractor piping and mechanical construction teams for any issues arising from fabrication, construction, installation or erection of systems. Provided feedback to other discipline construction supervisors, QC Inspection team, Site Manager and Engineering Contractor Management Team via regarding any matters affecting or related to contractor’s quality, workmanship or performance. Provided guidance, advice and instruction as necessary to contractor to ensure completed installation meets with Company approval. Supported the evaluation of the impacts, in terms of costs and schedule, of any changes or deviations from approved design from an installation/erection viewpoint. Advised Construction Superintendant & Site Manager of any threats to schedule for completion of installation activities. Ensured Contractor works within the HSE requirements set forth in the HSE plans. Lihat lebih sedikit

Exxon neftegas limited on odoptu fts project, sakhalin, russia
Jan 2010 - Jan 2010Mechanical systems engineerMechanical Engineer with various responsibilities: Witness and verify mechanical completion performed by the Construction Contractor including development of punch lists. Execute all mechanical pre-commissioning and commissioning activities for all systems associated with Oil & Gas Processing plant in accordance with commissioning procedures and schedules. Participate on the pre-commissioning and commissioning procedures. Assist the Mechanical Rotating Equipment Engineer on the pre-commissioning and commissioning of systems, prepare documentation and raise Permits to Work as required for all work activities. Prepare for, coordinate, assist and verify all Vendors Rep commissioning activities and report results and progress. Coordinate and supervise technicians and sub-contractors. Identify and order spare parts for static and rotating equipment, packages and piping as requires. Liaise with operation contra parts for a smooth equipment handover. Complete all relevant documentation to support handover and acceptance of systems to Operations Group and review all dossiers. Prepare documentation, verify and execute ‘Red Lining’ of systems drawings as required. Assist Process Operation group during the Start-Up. Comply with site HSE requirements ensuring that all work is carried out safely. Lihat lebih sedikit
.webp)
شركة مصفاة أرامكو السعودية موبيل المحدودة (سامرف)
Jun 2011 - Jan 2014Pmc construction and commissioning superintendentResponsible for managing, organizing and directing all contractor activities during civil construction, installation of tanks, vessels, including piping and mechanical equipment for the Samref Clean Fuel Project. Coordinated activities of other piping construction engineers and document control; developed inspection requirements, scopes of work, material lists and test packages for existing and new equipment and piping systems. Coordinated multi-national work force of contractor and sub contractors, civil, electrical, structural, mechanical, piping disciplines and project engineering. Worked with client, vendors and design engineers to resolve issues. Coordinated and approved pipe hydro and pneumatic pressure tests. Worked with design engineer and client to resolve complex field engineering issues in all disciplines. Participated in weekly safety audit, attended contractor daily toolbox and start-card meetings, developed construction work plans, assisted in start up of process and utility systems, monitored contactor progress, interpreted drawings and specifications, approved safe work permits, approved as-build drawings, answered RFI’s and solved construction problems. Developed turnover system; managed punchlisting and walkdowns; issued completion and turnover notices. Lihat lebih sedikit

Amec foster wheeler
Jun 2014 - Jul 2020PMC Construction Superintendent
Nov 2014 - Jul 2020PMC Construction Superintendent
Jun 2014 - Nov 2014

Wood
Jan 2017 - Jul 2020Pmc construction general superintendent
Wood
Nov 2021 - Jan 2023Ipmt area superintendentDuqm Refinery is a joint venture between OQ and Kuwait Petroleum International (KPI) worth US$6B. Wood is providing PMC services delivered as part of an Integrated Project Management team (IPMT). The refinery when complete, will have the capacity to process 230,000 barrels of crude oil per day.
Licenses & Certifications

Ndt: ultrasonic and magnetic particle inspection
Anst & pcnMar 2009
Opito & olf offshore survival
Petrofac trainingMar 2009
Rope access
IrataMar 2009
Languages
- enEnglish
- inIndonsian
- ruRussian
Recommendations

Sjusdal gaute
OfficerKristiansand, Agder, Norway
Constantino ortiz alva
Contador PúblicoIztapalapa, Mexico City, Mexico
Dashrath singh
Regional Head - Store Rollout and Maintenance-North RegionWest Delhi, Delhi, Indien
Lauren urquía
Educadora - Acompañante pedagógico de docentes en Amazonas - Intérprete & TraductoraPeru
Kritis kumar nudurchand
HR, Mauritius Duty Free ParadiseBeau Bassin, Plaines Wilhems District, Mauritius
Vivek sharma
Assistant service manager at Konica Minolta Business Solutions India Pvt. Ltd.Ludhiana, Punjab, India
Abdullah bin khathlan
Comprehensive Banking OfficerRiyadh, Saudi Arabia
Filip dombrovský
Advokát, společník ve společnosti Advokátní kancelář Zrůstek, Vodka, Dvořáková s.r.o.Brno, Jihomoravský, Česko
Luciana bellizia
Service Manager / SADT Manager / Operations Manager / Care coordinator (looking for replacement )São Paulo, São Paulo, Brazil
Lucila amstalden, msc, phd
Product Specialist | Sales Executive | Account Manager | Sales SpecialistIndaiatuba, São Paulo, Brazil
...