Abhinav Dubey

Abhinav dubey

bookmark on deepenrich
location of Abhinav DubeyGurugram, Haryana, India
Followers of Abhinav Dubey3000 followers
  • Timeline

  • About me

    Water Resource Engineer at AtkinsRealis (UK region)| Flood modeller| Hydrologist| Infoworks (ICM)| HEC RAS| SWAT| openLISEM| HEC HMS| HEC SSP| MIKE 21| Qgis

  • Education

    • Sds inter college, varanasi

      2013 - 2015
      Intermediate 82.6%
    • Sds inter college, varanasi

      2011 - 2013
      High school 89.16%
    • Central university of jharkhand

      2015 - 2020
      Integrated m.tech water engineering and management 8.34 sgpa
  • Experience

    • Central public works department, govt. of india

      Jan 2018 - Jan 2018
      Winter intern

      Site visit of ongoing residential project

    • Central ground water board

      May 2018 - Jun 2018
      Internship trainee

      Analysis of Water Table Aquifers in Jharkhand, Water Sampling and Necessity of Rain Water Harvesting.

    • Central water and power research station

      Dec 2019 - May 2020
      Project trainee

      Study of "Water Quality Modelling of Nandgaon Coast (Maharashtra) using MIKE 21 Ecolab Model" along with Hydrodynamic Modelling which gives tidal & current influences around near shore of Nandgaon area & in Ecolab module have set BOD -DO template and predict future scenario of Water Quality of Nandgaon coast.

    • Royal haskoningdhv

      Jan 2021 - Jan 2023

      Project (Central Water Commission): Physical Based Mathematical Modelling for Estimation of Sediment rate and Sediment Transport in seven River Basins in India funded by World Bank. ➢ Worked as the assistant junior hydrologist for the project➢ Responsible for analysis of historical Gauge, Discharge, Suspended Sediment and cross-section data➢ Responsible for analysis of dam reservoir inflow and outflow data, reservoir level regulated flow➢ Responsible for compare of CWC point rainfall and IMD spatial rainfall data➢ Flood Frequency Assessment using HEC SSP➢ Analysis of SRTM 30m DEM data and compare with ALOS Pulser DEM data➢ Extract the cross section from mentioned DEM and compare with observed cross section data➢ Responsible to develop HEC RAS1d sediment generation model of Barak River using Quasi unsteady➢ Responsible to calibrate the model for 3 years including flood years and validate for 1 year against the observed CWC GDS data➢ Responsible to check sensitive analysis with different sediment generation functions such as Ackers -white, Engelund and Hansen, Toffaleti and Yang➢ Responsible to make sensitive runs such as 20% increased and decreased (manning’s, boundary condition Water level and discharge and sediment) and changed the downstream boundary condition as normal depth➢ Responsible to develop catchment sediment generation 2 d model of 18 sub-basins of Barak and 6 subbasins of Naramada using openLISM tool➢ Responsible to analysis of soil type, land use and land cover, slope and terrain of above mentioned subbasins➢ Calibrate and validate the model against the observed data for reasonable years including flood year➢ Responsible to analyse 2 d result maps such as infiltration, rainfall, soil loss, soil detachment and deposition➢ Responsible to develop scenario runs such as deforestation and afforestation➢ Responsible to write monthly progress report and deliverable reports under supervision of TL & DTL Show less

      • Engineer

        Oct 2022 - Jan 2023
      • Trainee engineer

        Jan 2021 - Oct 2022
    • Atkins

      Jan 2023 - now

      My role as a Graduate Engineer with WMC team is to work on building 1D/2D model for UK rivers using tool such as Flood Modeller, Infoworks (ICM) and HEC RAS.I am involved in major projects like “Hydraulic performance Check (HPC) for various screens in UK region where my job is to build 1D hydraulic culvert model for these sites, do the flood risk assessment of proposed trash screens, generate the JBA toolkit and write the technical note.Apart from this, I am working on various River Restoration project with Nature Based Solution UK counterpart team where I am responsible to carry out the HEC RAS 2d model and calculate the sediment entrainment for the entire reach.Worked on Bishops Cleeve and Woodmancote 2D ICM model where I am responsible to update the structures such as culverts and bridges in existing model and analyse the result for different scenarios also develop the technical note. Show less

      • Associate Engineer

        May 2024 - now
      • Assistant Engineer

        Mar 2024 - May 2024
      • Graduate Engineer

        Jan 2023 - Mar 2024
  • Licenses & Certifications